| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$7,800.00 |
$3,500.00 |
$7,500.00 |
$8,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,584 | CY |
$3.50 |
$4.00 |
$4.00 |
$3.20 |
$3.52 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 13,989 | CY |
$4.00 |
$5.25 |
$7.00 |
$4.00 |
$4.40 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$3,000.00 |
$11,500.00 |
$12,650.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,448 | LF |
$2.00 |
$1.20 |
$1.00 |
$1.20 |
$1.65 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 512 | LF |
$9.00 |
$1.00 |
$4.50 |
$5.50 |
$8.27 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 15,491 | SY |
$1.60 |
$1.60 |
$1.45 |
$1.60 |
$1.53 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.2 | AC |
$350.00 |
$360.00 |
$100.00 |
$360.00 |
$385.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,012 | TON |
$35.00 |
$17.05 |
$20.00 |
$20.00 |
$22.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$225.00 |
$100.00 |
$450.00 |
$270.00 |
$220.00 |
| 11 | 613(D) 4504 |
21" X 15" CORR. ALUMINUM PIPE ARCH | 101 | LF |
$40.00 |
$30.00 |
$25.00 |
$36.00 |
$39.60 |
| 12 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$700.00 |
$200.00 |
$210.00 |
$620.00 |
$682.00 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$500.00 |
$1,500.00 |
$4,000.00 |
$4,400.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$27.00 |
$15.00 |
$34.00 |
$15.00 |
$16.50 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$120.00 |
$85.00 |
$105.00 |
$113.00 |
$137.50 |
| 16 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,250 | LF |
$190.00 |
$175.00 |
$190.00 |
$208.00 |
$231.00 |
| 17 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$145.00 |
$95.00 |
$145.00 |
$138.00 |
$203.50 |
| 18 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35 | LF |
$200.00 |
$160.00 |
$335.00 |
$232.00 |
$392.66 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 695 | LF |
$55.00 |
$75.00 |
$45.00 |
$81.00 |
$60.50 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 5,120 | LB |
$2.80 |
$3.50 |
$2.50 |
$3.00 |
$4.13 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$700.00 |
$450.00 |
$625.00 |
$707.00 |
$557.70 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$900.00 |
$450.00 |
$625.00 |
$707.00 |
$557.70 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 286 | CY |
$425.00 |
$350.00 |
$375.00 |
$528.00 |
$522.50 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 107 | CY |
$425.00 |
$350.00 |
$375.00 |
$627.00 |
$467.50 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 87,920 | LB |
$0.8000 |
$1.00 |
$0.8500 |
$0.7000 |
$0.9700 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 106 | LF |
$37.00 |
$16.00 |
$27.50 |
$35.00 |
$40.15 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 287 | LF |
$48.00 |
$18.00 |
$34.00 |
$48.00 |
$46.20 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 106 | LF |
$12.00 |
$8.00 |
$13.00 |
$12.00 |
$16.50 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 287 | LF |
$12.00 |
$9.00 |
$20.00 |
$12.00 |
$16.50 |
| 30 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 74 | LF |
$550.00 |
$550.00 |
$475.00 |
$516.00 |
$756.80 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,532 | TON |
$35.00 |
$23.50 |
$25.00 |
$28.00 |
$34.74 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 923 | TON |
$30.00 |
$19.15 |
$20.00 |
$23.00 |
$30.01 |
| 33 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 74 | SY |
$2.00 |
$3.00 |
$5.00 |
$22.00 |
$13.20 |
| 34 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 70 | LF |
$22.00 |
$40.00 |
$25.00 |
$5.00 |
$22.00 |
| 35 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$20.00 |
$40.00 |
$25.00 |
$3.00 |
$19.80 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$8,000.00 |
$6,500.00 |
$13,734.00 |
$19,800.00 |
| 37 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$18.00 |
$16.00 |
$20.00 |
$20.00 |
$22.00 |
| 38 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,700.00 |
$1,350.00 |
$1,300.00 |
$1,300.00 |
$1,430.00 |
| 39 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,325.00 |
$2,250.00 |
$2,100.00 |
$2,100.00 |
$2,310.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,450.00 |
$4,200.00 |
$4,200.00 |
$4,620.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$10,150.00 |
$9,000.00 |
$7,600.00 |
$13,530.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,000.00 |
$4,000.00 |
$2,000.00 |
$3,300.00 |
| 43 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$500.00 |
$5,000.00 |
$7,500.00 |
$6,600.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$44,200.00 |
$27,500.00 |
$20,750.00 |
$38,600.00 |
$45,238.90 |