| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$7,000.00 |
$3,000.00 |
$7,500.00 |
$4,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,481 | CY |
$5.00 |
$6.00 |
$4.00 |
$7.50 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,966 | CY |
$6.50 |
$9.00 |
$6.00 |
$8.50 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$4,000.00 |
$7,500.00 |
$4,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,745 | LF |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 160 | LF |
$6.50 |
$7.00 |
$10.00 |
$7.00 |
$9.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 517 | LF |
$10.00 |
$2.00 |
$1.99 |
$3.00 |
$2.36 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 2,960 | SY |
$1.70 |
$2.00 |
$1.59 |
$3.00 |
$1.88 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.81 | AC |
$300.00 |
$100.00 |
$85.00 |
$500.00 |
$85.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 589 | CY |
$42.00 |
$40.00 |
$35.00 |
$38.00 |
$58.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 103 | TON |
$24.00 |
$20.00 |
$20.00 |
$20.00 |
$40.00 |
| 12 | 407(B) 0250 |
TACK COAT | 144 | GAL |
$3.00 |
$3.00 |
$3.90 |
$6.50 |
$3.10 |
| 13 | 408 5774 |
PRIME COAT | 847 | GAL |
$6.00 |
$3.00 |
$4.00 |
$5.00 |
$9.30 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 487 | TON |
$65.00 |
$50.00 |
$67.00 |
$89.00 |
$90.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 372 | TON |
$70.00 |
$65.00 |
$85.75 |
$94.00 |
$110.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 38 | CY |
$300.00 |
$300.00 |
$400.00 |
$250.00 |
$350.00 |
| 17 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 1 | EA |
$1,500.00 |
$3,500.00 |
$1,250.00 |
$3,500.00 |
$3,000.00 |
| 18 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 56 | LF |
$38.00 |
$55.00 |
$42.00 |
$53.00 |
$80.00 |
| 19 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$740.00 |
$900.00 |
$710.00 |
$850.00 |
$1,000.00 |
| 20 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 15 | CY |
$33.00 |
$40.00 |
$62.00 |
$65.00 |
$61.00 |
| 21 | 613(V) 1180 |
TRENCH EXCAVATION | 24 | CY |
$20.00 |
$20.00 |
$6.00 |
$15.00 |
$15.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$1,500.00 |
$5,500.00 |
$3,500.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,925 | SY |
$2.00 |
$3.00 |
$3.00 |
$2.00 |
$4.00 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 38 | LF |
$5.00 |
$5.00 |
$5.00 |
$6.00 |
$16.00 |
| 25 | 501(F) 6352 |
GRANULAR BACKFILL | 18 | CY |
$40.00 |
$35.00 |
$85.00 |
$65.00 |
$70.00 |
| 26 | 503(A) 6123 |
PRESTRESSED CONCRETE BEAMS | 733.25 | LF |
$225.00 |
$180.00 |
$220.00 |
$290.00 |
$275.00 |
| 27 | 504(A) 1304 |
APPROACH SLAB | 102 | SY |
$150.00 |
$160.00 |
$195.00 |
$175.00 |
$225.00 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 274 | LF |
$60.00 |
$70.00 |
$55.00 |
$75.00 |
$72.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 42 | CY |
$420.00 |
$500.00 |
$450.00 |
$550.00 |
$750.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 6,984 | LB |
$0.9500 |
$1.20 |
$1.00 |
$2.00 |
$1.15 |
| 31 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 100 | LF |
$420.00 |
$350.00 |
$520.00 |
$450.00 |
$560.00 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,027 | TON |
$30.00 |
$30.00 |
$26.00 |
$30.00 |
$32.00 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 226 | TON |
$25.00 |
$28.00 |
$25.00 |
$30.00 |
$28.00 |
| 34 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 894 | SY |
$2.00 |
$2.00 |
$2.00 |
$4.00 |
$4.00 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$20.00 |
$25.00 |
$8.00 |
$35.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 64 | LF |
$18.00 |
$20.00 |
$25.00 |
$8.00 |
$35.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$2,000.00 |
$3,500.00 |
$7,500.00 |
| 38 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,600.00 |
$1,500.00 |
$1,594.00 |
$1,500.00 |
$1,800.00 |
| 39 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,400.00 |
$1,909.00 |
$2,400.00 |
$2,350.00 |
| 40 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,040 | LF |
$0.5500 |
$0.9500 |
$0.8500 |
$1.00 |
$1.05 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$2,400.00 |
$3,500.00 |
$3,000.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$9,750.00 |
$5,000.00 |
$7,000.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,800.00 |
$3,000.00 |
$4,000.00 |
$2,500.00 |
$3,500.00 |
| 44 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$4,000.00 |
$3,000.00 |
$4,000.00 |
$5,000.00 |
$5,500.00 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$28,000.00 |
$50,000.00 |
$30,000.00 |
$22,500.00 |
$30,000.00 |