| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$11,000.00 |
$5,400.00 |
$6,000.00 |
$20,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,682.61 | CY |
$6.00 |
$5.50 |
$10.50 |
$10.25 |
$5.00 |
$7.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 241 | CY |
$7.00 |
$8.00 |
$20.00 |
$25.00 |
$10.00 |
$15.00 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,800.00 |
$5,700.00 |
$11,500.00 |
$8,000.00 |
$5,600.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 150 | LF |
$3.00 |
$2.00 |
$2.50 |
$2.10 |
$3.00 |
$4.50 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$7.50 |
$7.00 |
$8.75 |
$7.35 |
$5.00 |
$11.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 670 | LF |
$3.00 |
$2.00 |
$5.00 |
$4.20 |
$2.00 |
$4.60 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 5,607 | SY |
$2.00 |
$1.75 |
$1.65 |
$1.65 |
$1.67 |
$1.90 |
| 9 | 232(A) 2813 |
SEEDING METHOD A | 1.2 | AC |
$295.00 |
$600.00 |
$1,045.00 |
$1,050.00 |
$624.75 |
$695.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.2 | AC |
$595.00 |
$600.00 |
$445.00 |
$450.00 |
$624.75 |
$400.00 |
| 11 | 241 2832 |
MOWING | 1.2 | AC |
$95.00 |
$75.00 |
$90.00 |
$89.25 |
$50.00 |
$174.00 |
| 12 | 327(D) 4230 |
(SP)LIME | 75 | TON |
$170.00 |
$175.00 |
$208.00 |
$170.00 |
$170.00 |
$200.00 |
| 13 | 327(H) 4270 |
(SP)LIME STABILIZED SUBGRADE | 302 | SY |
$2.10 |
$15.00 |
$6.50 |
$22.25 |
$5.00 |
$15.00 |
| 14 | 407 0250 |
TACK COAT | 641 | GAL |
$2.50 |
$1.00 |
$3.08 |
$2.95 |
$3.41 |
$6.00 |
| 15 | 408 5774 |
PRIME COAT | 2,135 | GAL |
$5.00 |
$1.00 |
$5.50 |
$5.25 |
$6.83 |
$6.00 |
| 16 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 953 | TON |
$73.00 |
$93.00 |
$78.80 |
$75.50 |
$102.74 |
$116.00 |
| 17 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 229 | TON |
$85.00 |
$100.00 |
$105.40 |
$101.00 |
$133.35 |
$158.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 88 | CY |
$275.00 |
$250.00 |
$310.00 |
$355.00 |
$300.00 |
$320.00 |
| 19 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 37 | LF |
$23.00 |
$12.00 |
$18.00 |
$40.25 |
$18.00 |
$60.00 |
| 20 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 12 | LF |
$15.00 |
$12.00 |
$24.00 |
$62.00 |
$18.00 |
$60.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,675.00 |
$6,375.00 |
$5,000.00 |
$4,500.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,467 | SY |
$5.50 |
$2.55 |
$8.25 |
$4.75 |
$5.00 |
$9.00 |
| 23 | 619(C) 0924 |
SAWING PAVEMENT | 48 | LF |
$4.00 |
$6.00 |
$2.00 |
$16.25 |
$4.00 |
$25.00 |
| 24 | 624(C) 4459 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) | 774 | LF |
$4.00 |
$5.00 |
$8.00 |
$10.50 |
$6.30 |
$7.50 |
| 25 | 653(C) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$500.00 |
$475.00 |
$1,000.00 |
$1,270.00 |
$500.00 |
$1,300.00 |
| 26 | 202(D) 1303 |
SELECT BORROW | 728 | CY |
$15.00 |
$25.00 |
$20.80 |
$22.50 |
$10.00 |
$56.00 |
| 27 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 244 | CY |
$18.00 |
$10.00 |
$24.00 |
$25.10 |
$16.00 |
$15.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 856 | CY |
$11.00 |
$5.50 |
$10.00 |
$16.35 |
$10.00 |
$10.00 |
| 29 | 508 6359 |
(PL)PRECAST ARCH CULVERT | 86 | LF |
$5,000.00 |
$2,950.00 |
$3,065.00 |
$3,215.00 |
$3,395.00 |
$4,100.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 251 | CY |
$400.00 |
$357.00 |
$305.00 |
$260.00 |
$400.00 |
$450.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 34,150 | LB |
$0.8000 |
$1.00 |
$0.8000 |
$1.20 |
$0.7500 |
$0.8000 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,700.00 |
$9,175.00 |
$7,250.00 |
$15,000.00 |
$17,500.00 |
| 33 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,500 | LF |
$0.3000 |
$1.10 |
$1.04 |
$1.15 |
$1.00 |
$1.20 |
| 34 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.1000 |
$0.2500 |
$0.2600 |
$0.5000 |
$0.2600 |
$0.4500 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$4,000.00 |
$4,600.00 |
$2,467.50 |
$6,500.00 |
| 36 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 60 | SD |
$25.00 |
$40.00 |
$15.65 |
$14.75 |
$15.75 |
$55.00 |
| 37 | 642 0098 |
STAKING | 1 | LSUM |
$25,000.00 |
$5,000.00 |
$4,600.00 |
$10,500.00 |
$4,200.00 |
$6,000.00 |
| 38 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$2,000.00 |
$875.00 |
$1,500.00 |
$5,000.00 |
| 39 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$36,335.00 |
$30,000.00 |
$32,000.00 |
$29,150.00 |
$30,000.00 |
$38,000.00 |