| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$14,900.00 |
$5,494.60 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,477 | CY |
$5.00 |
$10.00 |
$6.41 |
$5.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 15,311 | CY |
$6.00 |
$6.50 |
$6.48 |
$8.00 |
| 4 | 223 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.00 |
$1.50 |
$1.87 |
$1.75 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$8.00 |
$7.00 |
$9.17 |
$8.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,300 | SY |
$2.00 |
$2.35 |
$2.57 |
$2.50 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 8 | AC |
$400.00 |
$200.00 |
$513.93 |
$500.00 |
| 8 | 303 0192 |
AGGREGATE BASE | 1,100 | CY |
$35.00 |
$34.00 |
$41.26 |
$50.00 |
| 9 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 6 | STA |
$100.00 |
$550.00 |
$1,393.02 |
$1,000.00 |
| 10 | 407 0250 |
TACK COAT | 74 | GAL |
$3.00 |
$2.25 |
$2.63 |
$5.00 |
| 11 | 408 5774 |
PRIME COAT | 299 | GAL |
$4.00 |
$7.00 |
$8.18 |
$10.00 |
| 12 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 481 | TON |
$70.00 |
$84.00 |
$88.77 |
$90.00 |
| 13 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 168 | TON |
$90.00 |
$101.00 |
$105.12 |
$110.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$250.00 |
$258.30 |
$750.00 |
| 15 | 619(C) 0924 |
SAWING PAVEMENT | 56 | LF |
$40.00 |
$10.00 |
$7.49 |
$10.00 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$10.00 |
$10.00 |
$8.54 |
$10.00 |
| 17 | 501(F) 6352 |
GRANULAR BACKFILL | 48 | CY |
$10.00 |
$50.00 |
$43.06 |
$50.00 |
| 18 | 504(E) 6239 |
CONCRETE RAIL (TR3) | 256.6 | LF |
$60.00 |
$60.00 |
$66.02 |
$100.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 87,580 | LB |
$2.00 |
$1.33 |
$1.58 |
$1.75 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 80.2 | CY |
$420.00 |
$475.00 |
$683.72 |
$600.00 |
| 21 | 509(B) 1328 |
CLASS A CONCRETE | 39 | CY |
$450.00 |
$535.00 |
$631.31 |
$600.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 24,320 | LB |
$0.7500 |
$0.7500 |
$0.7400 |
$1.00 |
| 23 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,128 | LF |
$35.00 |
$24.00 |
$28.91 |
$40.00 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,128 | LF |
$20.00 |
$6.00 |
$16.04 |
$15.00 |
| 25 | 535 6164 |
(PL)FIXED BEARING ASSEMBLY | 6 | EA |
$500.00 |
$1,000.00 |
$1,153.32 |
$500.00 |
| 26 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 595 | TON |
$35.00 |
$31.00 |
$43.50 |
$75.00 |
| 27 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 140 | TON |
$30.00 |
$25.00 |
$32.83 |
$50.00 |
| 28 | 613(P) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 54 | LF |
$10.00 |
$23.00 |
$20.30 |
$50.00 |
| 29 | 613(Q) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$10.00 |
$23.00 |
$20.30 |
$50.00 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$13,977.17 |
$30,000.00 |
| 31 | 623(F) 6033 |
GUARD RAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$1,900.00 |
$2,055.73 |
$2,250.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$2,900.00 |
$2,569.66 |
$5,000.00 |
| 33 | 642 0098 |
STAKING | 1 | LSUM |
$2,500.00 |
$3,150.00 |
$3,153.68 |
$2,500.00 |
| 34 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$5,252.20 |
$2,000.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$15,500.00 |
$12,359.78 |
$40,000.00 |