| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$5,000.00 |
$6,195.00 |
$11,000.00 |
$10,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,292 | CY |
$6.00 |
$4.00 |
$4.00 |
$5.51 |
$3.50 |
$10.00 |
$6.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 10,179 | CY |
$7.00 |
$5.00 |
$6.00 |
$8.77 |
$7.25 |
$9.75 |
$8.00 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$2,500.00 |
$3,255.00 |
$10,500.00 |
$10,000.00 |
$20,000.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$3.50 |
$3.00 |
$2.00 |
$1.31 |
$2.00 |
$3.00 |
$3.00 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 50 | LF |
$8.00 |
$7.00 |
$10.00 |
$7.61 |
$12.00 |
$6.00 |
$6.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 264 | LF |
$2.50 |
$1.05 |
$1.75 |
$1.94 |
$2.45 |
$5.00 |
$3.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 8,557 | SY |
$2.50 |
$1.79 |
$1.75 |
$1.73 |
$2.25 |
$1.90 |
$3.00 |
| 9 | 230(F) 2812 |
WATERING | 343 | MGAL |
$10.00 |
$7.35 |
$10.00 |
$10.50 |
$14.25 |
$8.00 |
$10.00 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 1.78 | AC |
$750.00 |
$500.00 |
$500.00 |
$945.00 |
$1,000.00 |
$800.00 |
$500.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.78 | AC |
$420.00 |
$500.00 |
$500.00 |
$787.50 |
$975.00 |
$400.00 |
$350.00 |
| 12 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.86 | TON |
$625.00 |
$1,050.00 |
$750.00 |
$630.00 |
$975.00 |
$700.00 |
$1,000.00 |
| 13 | 234(A) 4406 |
FERTILIZING (0-46-0) | 0.14 | TON |
$750.00 |
$1,000.00 |
$750.00 |
$1,575.00 |
$1,800.00 |
$1,000.00 |
$1,000.00 |
| 14 | 235(A) 0100 |
(PL)ROCK FILTER DAM, TYPE 1 | 22 | CY |
$125.00 |
$50.00 |
$50.00 |
$63.00 |
$150.00 |
$60.00 |
$50.00 |
| 15 | 241 2832 |
MOWING | 1.78 | AC |
$200.00 |
$50.00 |
$50.00 |
$105.00 |
$325.00 |
$100.00 |
$10.00 |
| 16 | 303 0192 |
AGGREGATE BASE | 242 | CY |
$40.00 |
$27.00 |
$50.00 |
$37.46 |
$58.00 |
$40.00 |
$50.00 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 1,227 | SY |
$2.85 |
$2.00 |
$1.25 |
$2.31 |
$1.15 |
$2.00 |
$2.00 |
| 18 | 327(D) 4230 |
(SP)LIME | 18 | TON |
$140.00 |
$170.00 |
$250.00 |
$173.25 |
$172.50 |
$200.00 |
$200.00 |
| 19 | 327(I) 4280 |
(SP)LIME MODIFIED SUBGRADE | 1,227 | SY |
$3.00 |
$4.00 |
$5.00 |
$4.73 |
$16.00 |
$4.00 |
$5.00 |
| 20 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 194 | TON |
$25.00 |
$20.00 |
$22.50 |
$20.33 |
$30.00 |
$35.00 |
$30.00 |
| 21 | 407 0250 |
TACK COAT | 217 | GAL |
$3.00 |
$4.20 |
$4.50 |
$4.20 |
$5.25 |
$8.00 |
$5.00 |
| 22 | 408 5774 |
PRIME COAT | 843 | GAL |
$5.00 |
$4.46 |
$4.70 |
$4.46 |
$8.75 |
$5.00 |
$6.00 |
| 23 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 834 | TON |
$75.00 |
$95.71 |
$101.00 |
$95.71 |
$122.00 |
$90.00 |
$90.00 |
| 24 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 351 | TON |
$80.00 |
$98.18 |
$103.00 |
$98.18 |
$131.33 |
$90.00 |
$110.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$275.00 |
$200.00 |
$225.00 |
$315.00 |
$275.00 |
$300.00 |
$300.00 |
| 26 | 613(CC) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$950.00 |
$750.00 |
$750.00 |
$945.00 |
$800.00 |
$100.00 |
$650.00 |
| 27 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$800.00 |
$1,000.00 |
$1,050.00 |
$1,200.00 |
$120.00 |
$850.00 |
| 28 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 130 | LF |
$32.00 |
$34.00 |
$25.00 |
$28.72 |
$28.00 |
$35.00 |
$30.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,250.00 |
$2,000.00 |
$2,500.00 |
$4,095.00 |
$4,500.00 |
$5,000.00 |
$5,000.00 |
| 30 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 651 | LF |
$2.75 |
$1.00 |
$2.00 |
$4.73 |
$3.50 |
$5.00 |
$3.00 |
| 31 | 619(C) 0924 |
SAWING PAVEMENT | 1,287 | LF |
$2.50 |
$2.00 |
$5.00 |
$3.15 |
$3.00 |
$3.00 |
$5.00 |
| 32 | 624(C) 4459 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) | 684 | LF |
$5.00 |
$4.15 |
$6.00 |
$4.15 |
$10.00 |
$5.00 |
$5.00 |
| 33 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,694 | CY |
$8.00 |
$4.00 |
$8.00 |
$5.51 |
$3.50 |
$10.00 |
$10.00 |
| 34 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 775 | CY |
$20.00 |
$6.00 |
$12.00 |
$15.75 |
$6.00 |
$10.00 |
$20.00 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 1,716.7 | CY |
$400.00 |
$275.00 |
$275.00 |
$273.00 |
$310.00 |
$300.00 |
$350.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 504,450 | LB |
$0.7500 |
$0.6500 |
$0.6500 |
$0.7400 |
$0.5800 |
$0.7500 |
$0.8500 |
| 37 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 870 | TON |
$30.00 |
$30.00 |
$35.00 |
$32.58 |
$40.00 |
$40.00 |
$35.00 |
| 38 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 170 | TON |
$30.00 |
$20.50 |
$30.00 |
$28.58 |
$25.50 |
$35.00 |
$30.00 |
| 39 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$25,000.00 |
$34,650.00 |
$12,000.00 |
$30,000.00 |
$20,000.00 |
| 40 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,145 | LF |
$21.61 |
$30.00 |
$33.00 |
$23.10 |
$31.00 |
$35.00 |
$40.00 |
| 41 | 855(A) 8815 |
TRAFFIC STRIPE(PLASTIC)(THIN-LINE)(4" WIDE) | 3,000 | LF |
$0.3300 |
$0.9700 |
$1.00 |
$0.8900 |
$1.00 |
$1.25 |
$1.10 |
| 42 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,600 | LF |
$0.1500 |
$0.3600 |
$0.3000 |
$0.2600 |
$0.2900 |
$0.5000 |
$0.8500 |
| 43 | 856(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 500 | LF |
$0.5200 |
$0.6300 |
$1.00 |
$0.8900 |
$1.00 |
$1.00 |
$0.8500 |
| 44 | 856(G) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 400 | EA |
$0.5400 |
$1.05 |
$1.00 |
$1.05 |
$1.20 |
$1.25 |
$1.10 |
| 45 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.1500 |
$0.2600 |
$0.5000 |
$0.1500 |
$0.5500 |
$0.5000 |
$0.6000 |
| 46 | 871 8705 |
(PL)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$10.63 |
$0.7900 |
$13.00 |
$12.60 |
$16.00 |
$1.00 |
$6.00 |
| 47 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,160 | SD |
$0.2300 |
$0.0200 |
$0.0500 |
$0.0500 |
$0.0800 |
$0.3000 |
$0.6000 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 540 | SD |
$0.6800 |
$2.89 |
$2.75 |
$2.63 |
$2.85 |
$3.00 |
$1.10 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 900 | SD |
$1.00 |
$2.89 |
$2.75 |
$2.63 |
$2.95 |
$4.00 |
$5.00 |
| 50 | 880(C) 8842 |
BARRICADES(TYPE III) | 540 | SD |
$0.5100 |
$1.05 |
$2.00 |
$1.94 |
$2.10 |
$1.25 |
$1.10 |
| 51 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$0.6600 |
$1.05 |
$0.1100 |
$0.1100 |
$0.1300 |
$2.00 |
$3.50 |
| 52 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,980 | SD |
$0.1200 |
$0.3200 |
$0.1700 |
$0.1600 |
$0.1900 |
$0.1000 |
$0.1000 |
| 53 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 1,620 | SD |
$0.0500 |
$0.0200 |
$0.1700 |
$0.1600 |
$0.1900 |
$0.1000 |
$0.1000 |
| 54 | 880(F) 8878 |
DRUMS | 1,620 | SD |
$0.1200 |
$0.0200 |
$0.4000 |
$0.3700 |
$0.4200 |
$0.1500 |
$1.10 |
| 55 | 642 0098 |
STAKING | 1 | LSUM |
$10,000.00 |
$2,598.75 |
$7,500.00 |
$2,598.75 |
$12,000.00 |
$10,000.00 |
$15,000.00 |
| 56 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$2,500.00 |
$2,625.00 |
$4,000.00 |
$5,000.00 |
$1,500.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$31,000.00 |
$40,000.00 |
$51,065.44 |
$75,000.00 |
$40,000.00 |
$50,000.00 |