IDOT Jobs

2021 · 38 jobs · — Sign up free
★ My Jobs

Filtered by: County: Will Clear all

38 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 15, 2021 62L25 WillDistrict 1 (1.988-Mile) SMART overlay on Governor's Hwy. From IL-50 to Cook County Line. Located in the Village of University Park in Will County. — Executed Nov 26 New P. T. Ferro Construction Co. $970,197 ·
Jan 15, 2021 62L37 WillDistrict 1 County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County. — Executed Nov 26 New Davis Concrete Construction Co. $378,925 ·
Jan 15, 2021 62L55 WillDistrict 1 (9.65-Mile) SMART Overlay, pedestrian ramps. rumble -strips. Location: IL-102, from 26-ft northwest of Ryan 73 feet east of Kankakee County Line Road in the City of Wilmington, Wilmington and Wesley Townships. — Executed Nov 26 New Iroquois Paving Corporation $2,338,876 ·
Jan 15, 2021 62M06 WillDistrict 1 8.5 miles SMART overlay project consisting of milling and resurfacing, and the installation of shoulder rumble strips on I-55 from north of River Road to north of IandM Canal. — Executed Nov 26 New D. Construction, Inc. $8,161,702 ·
Jan 15, 2021 78817 WilliamsonDistrict 9 Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City. — Executed Nov 26 New K. D. Crain and Sons, Inc. $13,690 ·
Mar 5, 2021 62L05 WillDistrict 1 Smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township (3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township. — Executed Nov 26 New Austin Tyler Construction, Inc. $1,859,998 ·
Mar 5, 2021 62L36 WillDistrict 1 Retrofitting curb ramps for sidewalks to make compliant with PROWAG ADA improvements project consist of retrofitting curb ramps for sidewalks to make compliant with PROWAG. Location: Along various State routes (see remarks) in Lockport, Plainfield, and New Lenox in Will County. — Executed Nov 26 New M & J Underground Inc. $318,495 ·
Mar 5, 2021 62M02 WillDistrict 1 Pavement patching, HMA surface removal, HMA resurfacing, pedestrian ramp improvements and culvert replacement at 2 locations: 1) IL 1 from west of IL 394 to just south of Burville Road; 2) IL 394 from north of County Line Road to north of IL 1. — Executed Nov 26 New Iroquois Paving Corporation $4,489,310 ·
Mar 5, 2021 62M32 WillDistrict 1 (4.6-Mile) Pavement patching and crack and joint sealing on US 45 from north of Colorado Avenue to Stuenkel Road within the Village of Frankfort. — Executed Nov 26 New P. T. Ferro Construction Co. $427,820 ·
Mar 5, 2021 62N16 WillDistrict 1 Cleaning and painting existing steel on the structures No. 1: carrying 1-55 E. Frontage Road (Thomas Dillon Dr.) over I and M Canal, No. 2: US Route 6 (Jackson St.} over Spring Creek, No. 3: IL-113 over 1-55, in Village of Channahon and Diamond, and in City of Joliet, Wilmington, and Braidwood. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $318,001 ·
Mar 5, 2021 62N21 WillDistrict 1 (9.40-Mile) Pavement patching (intermittent resurfacing) project. Surface patching of longitudinal joints, lanes and shoulders and full depth (Class D) patching. Reinstate pavement markings affected by patching on Interstate 80 (I-80) from Kendall County Line to Des Plaines River in Will County. — Executed Nov 26 New D. Construction, Inc. $597,886 ·
Mar 5, 2021 62N22 WillDistrict 1 Bridge deck overlay and bridge joint repairs on 8 structures on I-55 from south of I-80 to south of Weber Road. Includes intermittent 2- surface for joints and full depth patching. — Executed Nov 26 New D. Construction, Inc. $5,963,776 ·
Mar 5, 2021 99654 WilliamsonDistrict 9 Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College. — Executed Nov 26 New Samron Midwest Contracting, Inc. $827,594 ·
Mar 5, 2021 99659 WilliamsonDistrict 9 Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin. — Executed Nov 26 New Samron Midwest Contracting, Inc. $73,890 ·
Apr 23, 2021 46562 WillDistrict 1 (11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County. — Executed Nov 26 New Maintenance Coatings Co. $896,240 ·
Apr 23, 2021 60T30 WillDistrict 1 Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County. — Executed Nov 26 New D. Construction, Inc. $2,643,645 ·
Apr 23, 2021 61G95 WillDistrict 1 Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport. — Executed Nov 26 New R. W. Dunteman Company $1,793,189 ·
Apr 23, 2021 61G96 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $321,841 ·
Apr 23, 2021 61H00 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee. — Executed Nov 26 New Iroquois Paving Corporation $256,749 ·
Apr 23, 2021 62K80 CookWillDistrict 1 Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. — Executed Nov 26 New D. Construction, Inc. $2,056,069 ·
Apr 23, 2021 62M15 WillDistrict 1 (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville. — Executed Nov 26 New K-Five Construction Corporation $1,563,017 ·
Apr 23, 2021 62M16 WillDistrict 1 (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $2,573,421 ·
Apr 23, 2021 62M27 WillDistrict 1 Bridge Deck and Approach repairs This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township. — Executed Nov 26 New P. T. Ferro Construction Co. $128,281 ·
Jun 11, 2021 46572 LakeWillDistrict 1 Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $635,000 ·
Jun 11, 2021 61B89 WillDistrict 1 Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox. — Executed Nov 26 New P. T. Ferro Construction Co. $7,905,136 ·
Jun 11, 2021 61G53 WillDistrict 1 Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet. — Executed Nov 26 New P. T. Ferro Construction Co. $2,324,588 ·
Jun 11, 2021 62H03 WillDistrict 1 Deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconst (1.02-Mile) Improvement consists of deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconstruct a retaining wall at 1-55 and IL 53 and substructure repair for both the bridges located in the Village of Bolingbrook. — Executed Nov 26 New D. Construction, Inc. $17,762,802 ·
Jun 11, 2021 62L66 WillDistrict 1 This is a 2.93 mile SMART overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on IL 53 (Bolingbrook Dr.) from DuPage County Line to I-55 within the Village of Bolingbrook. — Executed Nov 26 New K-Five Construction Corporation $2,220,000 ·
Jun 11, 2021 62N08 WillDistrict 1 Bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the b The improvement consists of bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the bridge located on l-55 over Kankakee River in the City of Wilmington in Will County Gross and net length is 1,067 FT (0.2 Miles). — Executed Nov 26 New D. Construction, Inc. $1,390,024 ·
Jun 11, 2021 78812 FranklinWilliamsonDistrict 9 Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. — Executed Nov 26 New Samron Midwest Contracting, Inc. $192,459 ·
Jun 11, 2021 78870 JeffersonWilliamsonDistrict 9 PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $396,056 ·
Jun 11, 2021 99667 WilliamsonDistrict 9 Resurface Lake Egypt Road from South Market Road to IL 166. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $890,783 ·
Jul 30, 2021 61G74 WillDistrict 1 Construction of a 10' wide HMA trail that includes pedestrian tunnels, retaining walls, box culverts, storm sewers, sidewalks, curb and gutter, fencing and pavement markings. Project begins at Spring Creek Greenway Trail in Lockport and concludes at the intersection of Cougar Road and 159th Street. — Executed Nov 26 New D. Construction, Inc. $6,860,486 ·
Jul 30, 2021 62G10 KendallWillDistrict 1 (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. — Executed Nov 26 New P. T. Ferro Construction Co. $1,259,611 ·
Sep 17, 2021 62K30 WillDistrict 1 (13.6-Mile) Pavement Rehabilitation (designed overlay). Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Southbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,952,848 ·
Sep 17, 2021 62K51 WillDistrict 1 (13.6-miles) Pavement rehabilitation (designed overlay) project for Northbound direction. Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Northbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,734,628 ·
Sep 17, 2021 78848 FranklinUnionWilliamsonDistrict 9 Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. — Executed Nov 26 New E. T. Simonds Construction Company $1,177,173 ·
Nov 5, 2021 62F87 CookWillDistrict 1 (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park. — Executed Nov 26 New P. T. Ferro Construction Co. $1,073,908 ·
1–38 of 38

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.