| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 62L25 | WillDistrict 1 | (1.988-Mile) SMART overlay on Governor's Hwy. From IL-50 to Cook County Line. Located in the Village of University Park in Will County. | — | Executed | P. T. Ferro Construction Co. $970,197 · | ||
| Jan 15, 2021 | 62L37 | WillDistrict 1 | County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County. | — | Executed | Davis Concrete Construction Co. $378,925 · | ||
| Jan 15, 2021 | 62L55 | WillDistrict 1 | (9.65-Mile) SMART Overlay, pedestrian ramps. rumble -strips. Location: IL-102, from 26-ft northwest of Ryan 73 feet east of Kankakee County Line Road in the City of Wilmington, Wilmington and Wesley Townships. | — | Executed | Iroquois Paving Corporation $2,338,876 · | ||
| Jan 15, 2021 | 62M06 | WillDistrict 1 | 8.5 miles SMART overlay project consisting of milling and resurfacing, and the installation of shoulder rumble strips on I-55 from north of River Road to north of IandM Canal. | — | Executed | D. Construction, Inc. $8,161,702 · | ||
| Jan 15, 2021 | 78817 | WilliamsonDistrict 9 | Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City. | — | Executed | K. D. Crain and Sons, Inc. $13,690 · | ||
| Mar 5, 2021 | 62L05 | WillDistrict 1 | Smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township (3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township. | — | Executed | Austin Tyler Construction, Inc. $1,859,998 · | ||
| Mar 5, 2021 | 62L36 | WillDistrict 1 | Retrofitting curb ramps for sidewalks to make compliant with PROWAG ADA improvements project consist of retrofitting curb ramps for sidewalks to make compliant with PROWAG. Location: Along various State routes (see remarks) in Lockport, Plainfield, and New Lenox in Will County. | — | Executed | M & J Underground Inc. $318,495 · | ||
| Mar 5, 2021 | 62M02 | WillDistrict 1 | Pavement patching, HMA surface removal, HMA resurfacing, pedestrian ramp improvements and culvert replacement at 2 locations: 1) IL 1 from west of IL 394 to just south of Burville Road; 2) IL 394 from north of County Line Road to north of IL 1. | — | Executed | Iroquois Paving Corporation $4,489,310 · | ||
| Mar 5, 2021 | 62M32 | WillDistrict 1 | (4.6-Mile) Pavement patching and crack and joint sealing on US 45 from north of Colorado Avenue to Stuenkel Road within the Village of Frankfort. | — | Executed | P. T. Ferro Construction Co. $427,820 · | ||
| Mar 5, 2021 | 62N16 | WillDistrict 1 | Cleaning and painting existing steel on the structures No. 1: carrying 1-55 E. Frontage Road (Thomas Dillon Dr.) over I and M Canal, No. 2: US Route 6 (Jackson St.} over Spring Creek, No. 3: IL-113 over 1-55, in Village of Channahon and Diamond, and in City of Joliet, Wilmington, and Braidwood. | — | Executed | Eagle Painting & Maintenance Company, Inc. $318,001 · | ||
| Mar 5, 2021 | 62N21 | WillDistrict 1 | (9.40-Mile) Pavement patching (intermittent resurfacing) project. Surface patching of longitudinal joints, lanes and shoulders and full depth (Class D) patching. Reinstate pavement markings affected by patching on Interstate 80 (I-80) from Kendall County Line to Des Plaines River in Will County. | — | Executed | D. Construction, Inc. $597,886 · | ||
| Mar 5, 2021 | 62N22 | WillDistrict 1 | Bridge deck overlay and bridge joint repairs on 8 structures on I-55 from south of I-80 to south of Weber Road. Includes intermittent 2- surface for joints and full depth patching. | — | Executed | D. Construction, Inc. $5,963,776 · | ||
| Mar 5, 2021 | 99654 | WilliamsonDistrict 9 | Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College. | — | Executed | Samron Midwest Contracting, Inc. $827,594 · | ||
| Mar 5, 2021 | 99659 | WilliamsonDistrict 9 | Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $73,890 · | ||
| Apr 23, 2021 | 46562 | WillDistrict 1 | (11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County. | — | Executed | Maintenance Coatings Co. $896,240 · | ||
| Apr 23, 2021 | 60T30 | WillDistrict 1 | Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County. | — | Executed | D. Construction, Inc. $2,643,645 · | ||
| Apr 23, 2021 | 61G95 | WillDistrict 1 | Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport. | — | Executed | R. W. Dunteman Company $1,793,189 · | ||
| Apr 23, 2021 | 61G96 | WillDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone. | — | Executed | P. T. Ferro Construction Co. $321,841 · | ||
| Apr 23, 2021 | 61H00 | WillDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee. | — | Executed | Iroquois Paving Corporation $256,749 · | ||
| Apr 23, 2021 | 62K80 | CookWillDistrict 1 | Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. | — | Executed | D. Construction, Inc. $2,056,069 · | ||
| Apr 23, 2021 | 62M15 | WillDistrict 1 | (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville. | — | Executed | K-Five Construction Corporation $1,563,017 · | ||
| Apr 23, 2021 | 62M16 | WillDistrict 1 | (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet. | — | Executed | D. Construction, Inc. $2,573,421 · | ||
| Apr 23, 2021 | 62M27 | WillDistrict 1 | Bridge Deck and Approach repairs This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township. | — | Executed | P. T. Ferro Construction Co. $128,281 · | ||
| Jun 11, 2021 | 46572 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $635,000 · | ||
| Jun 11, 2021 | 61B89 | WillDistrict 1 | Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox. | — | Executed | P. T. Ferro Construction Co. $7,905,136 · | ||
| Jun 11, 2021 | 61G53 | WillDistrict 1 | Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $2,324,588 · | ||
| Jun 11, 2021 | 62H03 | WillDistrict 1 | Deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconst (1.02-Mile) Improvement consists of deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconstruct a retaining wall at 1-55 and IL 53 and substructure repair for both the bridges located in the Village of Bolingbrook. | — | Executed | D. Construction, Inc. $17,762,802 · | ||
| Jun 11, 2021 | 62L66 | WillDistrict 1 | This is a 2.93 mile SMART overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on IL 53 (Bolingbrook Dr.) from DuPage County Line to I-55 within the Village of Bolingbrook. | — | Executed | K-Five Construction Corporation $2,220,000 · | ||
| Jun 11, 2021 | 62N08 | WillDistrict 1 | Bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the b The improvement consists of bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the bridge located on l-55 over Kankakee River in the City of Wilmington in Will County Gross and net length is 1,067 FT (0.2 Miles). | — | Executed | D. Construction, Inc. $1,390,024 · | ||
| Jun 11, 2021 | 78812 | FranklinWilliamsonDistrict 9 | Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. | — | Executed | Samron Midwest Contracting, Inc. $192,459 · | ||
| Jun 11, 2021 | 78870 | JeffersonWilliamsonDistrict 9 | PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. | — | Executed | Samron Midwest Contracting, Inc. $396,056 · | ||
| Jun 11, 2021 | 99667 | WilliamsonDistrict 9 | Resurface Lake Egypt Road from South Market Road to IL 166. | — | Executed | Southern Illinois Asphalt Co., Inc. $890,783 · | ||
| Jul 30, 2021 | 61G74 | WillDistrict 1 | Construction of a 10' wide HMA trail that includes pedestrian tunnels, retaining walls, box culverts, storm sewers, sidewalks, curb and gutter, fencing and pavement markings. Project begins at Spring Creek Greenway Trail in Lockport and concludes at the intersection of Cougar Road and 159th Street. | — | Executed | D. Construction, Inc. $6,860,486 · | ||
| Jul 30, 2021 | 62G10 | KendallWillDistrict 1 | (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. | — | Executed | P. T. Ferro Construction Co. $1,259,611 · | ||
| Sep 17, 2021 | 62K30 | WillDistrict 1 | (13.6-Mile) Pavement Rehabilitation (designed overlay). Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Southbound, from South of I-80 to just South of Weber Rd in Will County. | — | Executed | K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,952,848 · | ||
| Sep 17, 2021 | 62K51 | WillDistrict 1 | (13.6-miles) Pavement rehabilitation (designed overlay) project for Northbound direction. Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Northbound, from South of I-80 to just South of Weber Rd in Will County. | — | Executed | K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,734,628 · | ||
| Sep 17, 2021 | 78848 | FranklinUnionWilliamsonDistrict 9 | Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. | — | Executed | E. T. Simonds Construction Company $1,177,173 · | ||
| Nov 5, 2021 | 62F87 | CookWillDistrict 1 | (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park. | — | Executed | P. T. Ferro Construction Co. $1,073,908 · |
1–38 of 38
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.