Filtered by: County: Warren Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 68339 | KnoxWarrenDistrict 4 | 7.52 miles of resurfacing and bridge rehabilitation on US 34/IL 110 from west of Cameron Road to IL Route 164. | — | Executed | Gunther Construction, a div of UCM, Inc. $13,135,975 · | ||
| Jun 15, 2018 | 68E40 | WarrenDistrict 4 | 0.6 mile of partial width resurfacing and longitudinal joint repair on US 34 from 160th Ave. to 0.4 mile east of 165th Ave. near Kirkwood. | — | Executed | Gunther Construction, a div of UCM, Inc. $146,255 · | ||
| Mar 8, 2019 | 68B78 | WarrenDistrict 4 | Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth. | — | Executed | Gunther Construction, a div of UCM, Inc. $7,678,838 · | ||
| Nov 8, 2019 | 89762 | WarrenDistrict 4 | Full Depth reclamation with emulsified asphalt and cement and surface profiling and 2" HMA from IL 164 to 300th Avenue in Alexis. | — | Executed | Dunn Company $1,289,284 · | ||
| Jan 17, 2020 | 68D86 | WarrenDistrict 4 | Rehabilitation to SN 094-0041 carrying US 34 over US 67 and SN 094-0033 carrying US 34 over the BNSF Railroad, Southwest of Monmouth. | — | Executed | Brandt Construction Co. $1,525,000 · | ||
| Mar 6, 2020 | 68814 | WarrenDistrict 4 | Resurfacing on IL 116 from TR 154 to the Knox County Line. | — | Executed | Gunther Construction, a div of UCM, Inc. $3,872,911 · | ||
| Apr 24, 2020 | 68F16 | McDonoughWarrenDistrict 4 | 8 miles of microsurfacing on IL 110/US 67 from 0.4 mile S of N 2100 Rd to N of 40th Ave in Warren and McDonough Counties. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $826,923 · | ||
| Nov 6, 2020 | 68D95 | WarrenDistrict 4 | Replacement of Structure Nos. 094-0025 (New S.N. 094-0053) and 094-0026 (New Structure No. 094-0054) carrying US 34/1 L 110 over 120 Street (TR 162) in Warren County. | — | Executed | White Construction LLC $5,194,500 · | ||
| Jan 15, 2021 | 68G07 | FultonPeoriaWarrenDistrict 4 | Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. | — | Executed | Homer Tree Service, Inc. $146,325 · | ||
| Mar 5, 2021 | 68636 | WarrenDistrict 4 | Widening and resurfacing on US Route 67 from just west of Tom's Creek on US 67/IL 135 to just south of 270th Avenue/CH 3 in Warren County. Net length= 4.5 miles. | — | Executed | McCarthy Improvement Company $11,758,158 · | ||
| Jun 11, 2021 | 68G01 | WarrenDistrict 4 | Patching and pavement repairs to US Route 67 from North of the Roseville Bypass to Roseville South of the Roseville Bypass. | — | Executed | Gunther Construction, a div of UCM, Inc. $557,276 · | ||
| Jul 30, 2021 | 68F71 | WarrenDistrict 4 | Bridge joint replace/repair on Structure No. 094-0016 carrying IL 94/IL 135 over Henderson Creek, approximately 2.0 miles North of Little York in Warren County. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $434,766 · | ||
| Apr 29, 2022 | 68A36 | WarrenDistrict 4 | Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $20,211,670 · | ||
| Apr 29, 2022 | 68G33 | HendersonWarrenDistrict 4 | Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67. | — | Executed | DMS Contracting, Inc. $656,824 · | ||
| Jun 17, 2022 | 68G43 | McDonoughWarrenDistrict 4 | Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles. | — | Executed | Freesen, a div of UCM, Inc. $2,042,711 · | ||
| Jun 17, 2022 | 68G93 | WarrenDistrict 4 | 6.22 miles of HMA patching from 20th Street to US 67. | — | Executed | Gunther Construction, a div of UCM, Inc. $435,978 · | ||
| Jun 17, 2022 | 89760 | WarrenDistrict 4 | Replace the bridge carrying CH 4 over Henderson Creek, 5.4 miles southeast of Alexis. | — | Executed | County Contractors, Inc. $2,275,756 · | ||
| Jul 15, 2022 | 68G71 | WarrenDistrict 4 | Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work. | — | Executed | Brandt Construction Co. $1,033,550 · | ||
| Nov 18, 2022 | 68E43 | WarrenDistrict 4 | Replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 This project is located just west of Galesburg and consists of replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 over the South branch of Cedar Creek. | — | Executed | Laverdiere Construction, Inc. $2,344,285 · | ||
| Apr 25, 2025 | 68F43 | WarrenDistrict 4 | Designed overlay on US 34 from 0.1 mile west of 20th St to east of US 67 in Monmouth in Warren County. 7.09 miles gross. | — | Executed | Gunther Construction, a div of UCM, Inc. $9,337,044 · | ||
| Apr 25, 2025 | 68H42 | MercerWarrenDistrict 4 | Designed overlay along US 67 and IL 135 in Mercer and Warren Counties (>7 miles gross) and bridge preservation to SN 066-0016 carrying US 67 over Tom's Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,563,945 · | ||
| Apr 25, 2025 | 68J21 | WarrenDistrict 4 | PPP designed overlay on US 67 from north of 40th Ave and south end of BUS 67; SMART overlay on Roseville Bypass and north end of BUS 67, including IL 116 from 0.2 mile west to 0.2 mile east of US 67 west of Roseville. Approximately 6.65 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $12,640,388 · | ||
| Apr 25, 2025 | 89780 | WarrenDistrict 4 | Pavement reconstruction on West Harlem Avenue from US 34 to North Main Street in Monmouth. | — | Executed | Brandt Construction Co. $2,855,658 · | ||
| Nov 7, 2025 | 68B60 | WarrenDistrict 4 | Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi. | — | Executed | Gunther Construction, a div of UCM, Inc. $35,946,274 · | ||
| Jan 16, 2026 | 89781 | WarrenDistrict 4 | Replace the bridge carrying CH 7 over Cedar Creek, 3.4 miles northeast of Monmouth. | — | Executed | County Contractors, Inc. $1,111,813 · | ||
| Apr 24, 2026 | 68K86 | HendersonWarrenDistrict 4 | Removal and replacement of various installations of guardrail in District 4 along Illinois Route 116 (FAP 665), Illinois Route 135 (FAP 546), and Illinois Routes 94/116 (FAP 534) at various locations in Henderson and Warren Counties. | — | Executed | COLLINS & HERMANN, INC. $879,375 · | ||
| Jun 12, 2026 | 68J50 | WarrenDistrict 4 | Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles. | — | Executed | Brandt Construction Co. $1,613,831 · | ||
| Jun 12, 2026 | 68K21 | WarrenDistrict 4 | Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,549,883 · | ||
| Jun 12, 2026 | 68K85 | PeoriaTazewellWarrenDistrict 4 | Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. | — | Executed | Oberlander Electric Co. $790,676 · |
1–29 of 29
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.