Filtered by: County: Kane Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 17, 2023 | 61J92 | KaneDistrict 1 | Improve the intersection of Farnsworth Avenue at Marshal Boulevard and at the Illinois Prairie Path intersection in Aurora. | — | Executed | Builders Paving, LLC $381,189 · | ||
| Jan 19, 2024 | 62U68 | KaneMcHenryDistrict 1 | Arterial routes sweeping in McHenry and Kane counties This contract consists of arterial routes sweeping in McHenry and Kane counties | — | Rejected | Central Sweeping of Illinois, LLC $1,476,500 · | ||
| Mar 8, 2024 | 61H42 | KaneDistrict 1 | Full Depth Resurfacing with curb and gutter, HMA bike path, ADA improvements, and Drainage improvements on Kautz Road from north of Lowgest Drive to Swenson Drive in Geneva and St. Charles. | — | Executed | Plote Construction, Inc. $6,091,120 · | ||
| Mar 8, 2024 | 61J58 | KaneDistrict 1 | Resurfacing Hankes Road from Deerpath Road to Galena Boulevard, and Galena Boulevard from Hankes Road to Orchard Road in Aurora. | — | Executed | Builders Paving, LLC $767,888 · | ||
| Mar 8, 2024 | 61J65 | KaneDistrict 1 | Reconstruction of South McLean Boulevard to a full-curbed cross section with addtional lanes, landscaped median and turn lanes, from Stearns Road to Spring Street in South Elgin. | — | Executed | Plote Construction, Inc. $12,767,711 · | ||
| Mar 8, 2024 | 61K23 | KaneDistrict 1 | Resurfacing Church Road from Indian Trail Road to Sheffer Road, and Sheffer Road from Church Road to Ohio Street in Aurora. | — | Executed | Geneva Construction Company $496,166 · | ||
| Mar 8, 2024 | 61K25 | KaneDistrict 1 | HMA resurfacing with pavement patching, recessed pavement markings, sidewalks, curb and gutter, and landscaping on Illinois Avenue from Highland Avenue to the bridge over the Fox River in Aurora. | — | Executed | Builders Paving, LLC $829,828 · | ||
| Mar 8, 2024 | 61K27 | KaneDistrict 1 | Sidewalk Construction on Calkins Drive from McCannon Street to Grove Street, West Street from Calkins Drive to Maple Street, and Grove Street from Snow St. to Maple Street in Sugar Grove. | — | Executed | Triggi Construction, Inc. $212,336 · | ||
| Mar 8, 2024 | 62T77 | KaneDistrict 1 | (1.45-Mile) Smart Overlay and ADA improvement; Location: FAP 341 IL72 from US 20/IL 47 to Reinking Rd in the Village of Pingree Grove and Rutland Township in Kane County. | — | Executed | Peter Baker & Son Co. $491,941 · | ||
| Mar 8, 2024 | 62V25 | KaneDistrict 1 | Asphalt surface removal and replacement, pavement markings This improvement is on various State maintained routes within the Villages of Lily Lake and Virgil and the City of Elgin in Kane County. This is an intermittent spot resurfacing improvement consists of asphalt surface removal and replacement, pavement markings. | — | Executed | Curran Contracting Company $499,630 · | ||
| Apr 26, 2024 | 61K15 | KaneDistrict 1 | Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove. | — | Executed | D. Construction, Inc. $571,413 · | ||
| Apr 26, 2024 | 61K39 | KaneDistrict 1 | Resurface Baseline Road from US 30 to IL 31 in Montgomery. | — | Executed | Geneva Construction Company $431,447 · | ||
| Apr 26, 2024 | 62T45 | KaneDistrict 1 | This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County. | — | Executed | Lorig Construction Company $256,821 · | ||
| Apr 26, 2024 | 62U84 | KaneDistrict 1 | (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County. | — | Executed | Martam Construction Incorporated $2,186,382 · | ||
| Jun 14, 2024 | 61J28 | KaneDistrict 1 | Reconstruction of the existing intersection of us 20 and Reinking road in the c ty of Elgin to a three-leg roundabout. Work includes pavement removal, storm se sewers, watermains, pcc roadway pavement, curb and gutter, sidewalks, lighting, landscaping, pavement markings and other necessary work. | — | Executed | Plote Construction, Inc. $3,364,000 · | ||
| Jun 14, 2024 | 61K38 | KaneDistrict 1 | Resurface Main Street from Cross Street to 630' north of IL 47 in Sugar Grove. | — | Executed | D. Construction, Inc. $446,051 · | ||
| Jun 14, 2024 | 62U83 | CookKaneDistrict 1 | 6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties. | — | Executed | Dunnet Bay Construction Company $27,446,572 · | ||
| Aug 2, 2024 | 62R97 | KaneMcHenryDistrict 1 | Location 1: 7,089 Feet (1.34 Miles), SMART Overlay, Designed Overlay and ADA Improvements and is located on US 14 from 0.4 Mile SE of Cary/Algonquin Rd to SE of Spring Beach Way within the Village of Cary in McHenry County. Location 2: 1,148.44 Feet (0.22 Miles). Shoulder and Drainage repairs and is located on IL 31 north of Main St in within the Village of Carpentersville in Kane County. | — | Executed | Peter Baker & Son Co. $2,080,376 · | ||
| Aug 2, 2024 | 62T86 | KaneDistrict 1 | (0.55-Mile) SMART Overlay project consisting of hot-mix asphalt surface removal pavement patching, grading and shaping shoulders, hot-mix asphalt surface, detector loop replacement, and thermoplastic pavement marking on Hill Avenue from Montgomery Road to the Kendall County Line within the City of Aurora, in Kane County. | — | Executed | D. Construction, Inc. $274,271 · | ||
| Nov 8, 2024 | 61K64 | KaneDistrict 1 | HMA resurfacing, concrete curb and gutter, storm sewer, and erosion control on Indian Trail from Highland Avenue to IL 31 in Aurora. | — | Executed | Geneva Construction Company $1,369,171 · | ||
| Nov 8, 2024 | 61K66 | KaneDistrict 1 | Resurface Ashland Avenue from IL 25 to Union Street in Aurora. | — | Executed | Geneva Construction Company $1,157,514 · | ||
| Nov 8, 2024 | 61K67 | KaneDistrict 1 | Resurface Prairie Street from the west city limits to Randall Road in Aurora. | — | Rejected | Builders Paving, LLC $1,538,538 · | ||
| Nov 8, 2024 | 61K73 | KaneDistrict 1 | HMA resurfacing, patching, pavement markings, sidewalks, ADA improvements, at various locations in Elgin. | — | Rejected | |||
| Nov 8, 2024 | 62W05 | KaneDistrict 1 | This is a maintenance yard improvement project for the IDOT Sign Shop Yard. The project includes pavement removal, placement of subbase material, HMA HMA binder course, HMA surface course, portland cement concrete, thermoplastic pavement markings, drainage structure repairs, and other incidental. The project is located at 595 S. Street, Elgin in Kane County. | — | Executed | A Lamp Concrete Contractors, Inc. $584,932 · | ||
| Nov 8, 2024 | 62X08 | KaneDistrict 1 | Demolition and removal of two single-family residences, and site clean-up at a commercial property. All three locations are in Sugar Grove. | — | Executed | Veterans Vac Services LLC $245,431 · | ||
| Nov 8, 2024 | 62X13 | KaneDistrict 1 | (214-Ft) Retaining wall repair. Work includes replacement of cast-in-place segment, replacement of curb and gutter, sidewalk, adjustment of drainage parkway/ landscaped areas restoration. Located on IL 25, North of IL 64 (at 404 North 5th Avenue) within the City of St. Charles, in Kane County. | — | Executed | Areatha Construction Co., Inc. $675,550 · | ||
| Jan 17, 2025 | 61J91 | KaneDistrict 1 | Resurfacing and traffic signal modifications at various intersections on Indian Trail from Edgelawn Drive to Highland Avenue in Aurora | — | Executed | Geneva Construction Company $4,562,538 · | ||
| Jan 17, 2025 | 61K68 | KaneDistrict 1 | HMA resurfacing, curb and gutter, sidewalks, ADA ramps, traffic signals, lighting and pavement markings on Dundee Avenue between Enterprise Street and Page Street in Elgin. | — | Executed | Martam Construction Incorporated $9,964,717 · | ||
| Jan 17, 2025 | 61K98 | KaneDistrict 1 | Construciton of PPC Sidewalks, ADA Ramps, pavement markings and landscaping at various locations in Batavia. | — | Executed | Triggi Construction, Inc. $414,112 · | ||
| Jan 17, 2025 | 61L03 | KaneDistrict 1 | Installation of Recessed Reflective Pavement Markers and pavement marking at various locations in Kane County. | — | Executed | Precision Pavement Markings Inc. $545,288 · | ||
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. | — | Executed | R. W. Dunteman Company $30,162,688 · | ||
| Mar 7, 2025 | 61L26 | KaneDistrict 1 | Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. | — | Rejected | |||
| Apr 25, 2025 | 61K26 | KaneDistrict 1 | Replace the bridge carrying TR 2110 over the CN Railroad, 0.5 mile north of Bowes Road. | — | Executed | Rausch Infrastructure, LLC $3,894,087 · | ||
| Apr 25, 2025 | 62J72 | KaneDistrict 1 | (5,107-Ft) Designed Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along ILL 31/ ILL 56 (State Street) from I-88 to North River Road within the Village of North Aurora | — | Executed | Geneva Construction Company LLC. $1,373,951 · | ||
| Apr 25, 2025 | 62V37 | KaneDistrict 1 | (2.08-Mile). Smart HMA surface removal and overlay, pavement widening, ADA curb ramp improvements, APS improvements, pavement widening, pavement markings, This project is located along IL 64 (Main Street) and begins just west of 13th Avenue and extends in an easterly direction to Kautz Road/Smith Road. This project is located within the City of St. Charles in Kane County. | — | Executed | Plote Construction, Inc. $3,811,382 · | ||
| Apr 25, 2025 | 62W69 | KaneDistrict 1 | Pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and re (3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County. | — | Executed | Geneva Construction Company LLC. $4,184,234 · | ||
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. | — | Executed | Schroeder Asphalt Services, Inc. $1,348,856 · | ||
| Jun 13, 2025 | 61L59 | KaneDistrict 1 | HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments. | — | Executed | Curran Contracting Company $308,598 · | ||
| Jun 13, 2025 | 61L60 | KaneDistrict 1 | HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration. | — | Executed | Plote Construction, Inc. $1,197,423 · | ||
| Jun 13, 2025 | 62X33 | KaneDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County. | — | Rejected | Builders Paving, LLC $4,414,888 · | ||
| Jun 13, 2025 | 62X59 | KaneDistrict 1 | (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County. | — | Executed | Plote Construction, Inc. $2,838,180 · | ||
| Jun 13, 2025 | 62X61 | KaneDistrict 1 | Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County. | — | Executed | Peter Baker & Son Co. $922,469 · | ||
| Jun 13, 2025 | 62X67 | KaneDistrict 1 | Asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County. | — | Executed | Curran Contracting Company $2,654,662 · | ||
| Jun 13, 2025 | 62X69 | KaneDistrict 1 | (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We | — | Executed | Geneva Construction Company LLC. $2,713,457 · | ||
| Jun 13, 2025 | 62Y02 | CookKaneDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. | — | Executed | Capital Industrial Services, LLC $499,333 · | ||
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. | — | Executed | Plote Construction, Inc. $5,096,305 · | ||
| Aug 1, 2025 | 61L61 | KaneDistrict 1 | Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. | — | Executed | Builders Paving, LLC $448,788 · | ||
| Aug 1, 2025 | 61L67 | KaneDistrict 1 | Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. | — | Executed | D. Construction, Inc. $472,933 · | ||
| Aug 1, 2025 | 62X45 | CookKaneKendallDistrict 1 | Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. | — | Executed | Mosley Construction 1, LLC $1,455,444 · | ||
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. | — | Executed | Martam Construction Incorporated $11,987,774 · | ||
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. | — | Executed | Triggi Construction, Inc. $354,811 · | ||
| Sep 19, 2025 | 62K78 | KaneDistrict 1 | Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char | — | Executed | Plote Construction, Inc. $4,318,000 · | ||
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. | — | Executed | Everlast Blacktop Inc. $763,936 · | ||
| Jan 16, 2026 | 61L56 | KaneDistrict 1 | Resurfacing Molitor Road from Elizebeth Lane to Felton Road, Diehl Road from Felton Road to Eola Road, Molitor Road from Diehl Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $2,502,456 · | ||
| Jan 16, 2026 | 61L95 | KaneDistrict 1 | Resurfacing various routes and locations in Aurora. | — | Executed | Geneva Construction Company LLC. $3,133,675 · | ||
| Jan 16, 2026 | 61M02 | KaneDistrict 1 | Traffic signals improvements at various locations on Kimball Street between Grove Avenue to Dundee Avenue in Elgin. | — | Executed | H & H Electric Co. $584,382 · | ||
| Feb 27, 2026 | 61L39 | KaneDistrict 1 | Pavement widening and traffic signal improvements from Orchard Rd. to Randall Rd. in North Aurora. | — | Executed | Geneva Construction Company LLC. $2,691,498 · | ||
| Feb 27, 2026 | 61L66 | KaneDistrict 1 | Resurfacing Barrington Avenue from IL 68 to Van Buren Street in the village of East Dundee. | — | Executed | Schroeder Asphalt Services, Inc. $393,716 · | ||
| Feb 27, 2026 | 62V43 | KaneDistrict 1 | Pavement patching, HMA overlay of p (1.54-Mile) Project consists of pavement patching, HMA overlay of p.c.c pavement, resurfacing with polymerized hot-mix asphalt surface course, binder course and curb and gutter replacement, thermoplastic pavement marking located in the Village of Huntley and Rutland Township in Kane County. | — | Executed | Builders Paving, LLC $2,670,318 · | ||
| Apr 24, 2026 | 61M11 | KaneDistrict 1 | Construct an HMA path adjacent to South Edgelawn Drive at the BNSF Railroad tracks between Jericho Road and Kingsway Drive. | — | Executed | Alliance Contractors, Inc. $214,945 · | ||
| Apr 24, 2026 | 61M17 | KaneDistrict 1 | Reconstruction of TR 245 (Boyer Road) from Longmeadow Parkway to County Line Road in the Village of Algonquin. Work includes HMA pavement, sidewalk, pipe and culverts. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $3,694,062 · | ||
| Apr 24, 2026 | 61M33 | KaneDistrict 1 | Construction of a single-lane roundabout intersection at the intersection of Highland Ave. and Lyle Ave. in the City of Elgin. Work includes HMA pavement reconstruction, curb and gutter, sidewalks, storm sewer, lighting and other required work. | — | Rejected | |||
| Jun 12, 2026 | 61L30 | KaneDistrict 1 | Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills. | — | Executed | Builders Paving, LLC $2,893,888 · | ||
| Jun 12, 2026 | 61M10 | KaneDistrict 1 | Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora. | — | Rejected | K-Five Construction Corporation $5,028,975 · | ||
| Jun 12, 2026 | 61M42 | KaneDistrict 1 | Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove. | — | Executed | D. Construction, Inc. $654,874 · | ||
| Jun 12, 2026 | 61M43 | KaneDistrict 1 | Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove. | — | Executed | D. Construction, Inc. $692,262 · | ||
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee. | — | Executed | Geske and Sons, Inc. $754,807 · | ||
| Jun 12, 2026 | 62M71 | KaneKendallDistrict 1 | Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l | — | Executed | D. Construction, Inc. $52,733,996 · | ||
| Jun 12, 2026 | 62V08 | CookDuPageKaneDistrict 1 | Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. | — | Executed | D. Construction, Inc. $1,863,322 · | ||
| Jun 12, 2026 | 62V78 | DuPageKaneDistrict 1 | (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties. | — | Executed | Mosley Construction 1, LLC $850,529 · | ||
| Jun 12, 2026 | 80B23 | KaneDistrict 1 | Pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County. | — | Executed | Plote Construction, Inc. $3,171,166 · | ||
| Jul 31, 2026 | 61M13 | KaneDistrict 1 | Demolition of existing 18-span bridge and construction of three PPC beam single span bridges carrying Kirk Rd. over Reed Rd., UPRR and White's Creek. | — | Executed | Dunnet Bay Construction Company $36,611,206 · | ||
| Sep 18, 2026 | 61M67 | KaneDistrict 1 | HMA resurfacing on various routes in Aurora. Includes recessed pavement markings, sidewalk, curb and gutter. | — | Awarded | |||
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | HMA resurfacing n Douglas Avenue/Douglas Road from US 30 to Ashland Avenue in Montgomery. Includes curb and gutter, sidewalk, drainage improvements, and detector loop replacement. | — | Executed | D. Construction, Inc. $1,466,728 · |
101–174 of 174‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.