Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 64P41 | BureauWhitesideDistrict 2 | Cold Milling, Pavement Patching, and Hot-Mix Asphalt Resurfacing on IL 40 from 0.4 mile north of I-88 to IL 92. | — | Rejected | Martin & Company Excavating $6,978,085 · | ||
| Jan 19, 2024 | 66967 | BureauDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,548,799 · | ||
| Mar 8, 2024 | 66M88 | BureauDistrict 3 | Crack routing and sealing, and pavement marking This project is located on FAP 646 (IL 40), it begins south of the BNSF Railroad at the south city limits of Buda and ends at the Stark County line. The work consists of crack routing and sealing, and pavement marking. | — | Executed | Complete Asphalt Service Co. $42,302 · | ||
| Mar 8, 2024 | 66M96 | BureauDistrict 3 | HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers This project is located on FAS 248 (Tiskilwa Spur), it begins 0.7 mile north of Lovers Lane Road and ends 0.3 mile south of 1075N Road. The work consists of HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers. | — | Executed | Advanced Asphalt Company $3,072,639 · | ||
| Mar 8, 2024 | 87811 | BureauDistrict 3 | HMA resurfacing, curb and gutter, and traffic signals on South Main Street in Princeton. | — | Executed | Advanced Asphalt Company $845,557 · | ||
| Mar 8, 2024 | 87842 | BureauDistrict 3 | Sidewalk construction along various streets in Ladd. | — | Executed | Gensini Excavating, Inc. $282,441 · | ||
| Apr 26, 2024 | 66N53 | BureauDistrict 3 | Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. | — | Executed | Gensini Excavating, Inc. $431,733 · | ||
| Apr 26, 2024 | 66N93 | BureauDistrict 3 | Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. | — | Executed | ERA-Valdivia Contractors, Inc. $548,417 · | ||
| Apr 26, 2024 | 87815 | BureauDistrict 3 | Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle. | — | Executed | Curnyn Construction Co. $499,288 · | ||
| Apr 26, 2024 | 87824 | BureauDistrict 3 | Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92. | — | Executed | Advanced Asphalt Company $949,527 · | ||
| Jun 14, 2024 | 66K66 | BureauDistrict 3 | Arispie Township superstructure replacement of SN 006-0053 and SN006-0054 and bridge replacement of SN 006-0051 and SN 006-0052. SN 006-0051 and SN 006-0052 carry I 180 over Bureau Creek and SN 006-0053 and SN 006-0054 carry I 180 over CH 23 (Bottom Road). | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $24,206,955 · | ||
| Jun 14, 2024 | 66P15 | BureauPutnamDistrict 3 | 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. | — | Executed | Advanced Asphalt Company $1,857,288 · | ||
| Jun 14, 2024 | 66P23 | BureauDistrict 3 | Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) i This project consists of Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) in Bureau County. | — | Executed | Denler, Inc. $185,981 · | ||
| Jun 14, 2024 | 66P27 | BureauDistrict 3 | Class B Pavement Patching on F.A.I. Route 80 (I-80) beginning at M.M. 45.0, 0.1 miles east of IL Route 40 and ending at M.M. 59.6, 0.47 miles east of US Route 34. | — | Executed | G. M. Sipes Construction, Inc. $798,437 · | ||
| Jun 14, 2024 | 66P28 | BureauDistrict 3 | This project is located at Structure_No. 006-0057 (EB) carrying F.A.I. Route 180 (I-180), Roadway "F" and structure No. 006-0058 (WB) carrying_F.A.I. Route 180 (I-180), Roadway "E" over IL Route 29 and the IAIS Railroad approximately 2.0 miles southwest of Bureau Junction. Removal of PCC slope wall/riprap placement. | — | Executed | Phoenix Corporation of the Quad Cities $405,752 · | ||
| Jun 14, 2024 | 87816 | BureauDistrict 3 | Replace the bridge carring TR 85 over Masters Creek, 3 miles southest of Ohio. | — | Executed | Curnyn Construction Co. $539,871 · | ||
| Jun 14, 2024 | 87817 | BureauDistrict 3 | Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington. | — | Executed | Sjostrom & Sons, Inc. $436,742 · | ||
| Aug 2, 2024 | 66K82 | BureauLaSalleDistrict 3 | Milling and resurfacing (designed overlay), structure repairs, patching, pavement marking, and raised reflective markers on FAI 80 (I-80) from 1 mile west of IL 89 to 0.7 mile west of IL 251. | — | Executed | Advanced Asphalt Company $21,687,508 · | ||
| Nov 8, 2024 | 66P61 | BureauDistrict 3 | Removing deteriorated wingwalls and partial barrel removal, clearing and grubbing adjacent slopes and installation of gabion baskets and slope mattress at SN 006-2543_carrying IL 29 over a stream 0.8 miles west of the US 6 and IL 89 intersection. | — | Executed | D. Construction, Inc. $238,332 · |
1–19 of 19
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.