221Let jobs
$590,141,469Total low bids
$599,181,483Total estimates
-1.5%Low bids vs estimates
Feb 2023 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 2, 2023 | 0007-03-108F 2023(093) | Eastland Brownwood |
RESURFACE ROADWAYIH 20 · | $2,196,191 | $2,010,120 | VSS INTERNATIONAL, INC. | -8.5% | 2 |
| Feb 2, 2023 | 0919-00-084F 2023(447) | Cass Atlanta |
PAVEMENT MARKINGSVA · | $2,112,491 | $1,889,110 | STRIPE-A-ZONE, LLC | -10.6% | 3 |
| Feb 2, 2023 | 0597-04-005STP 2023(392)HES | San Augustine Lufkin |
HAZARD ELIMINATION & SAFETYFM 2923 · | $1,787,802 | $1,771,725 | PINTO CONSTRUCTION CO., INC. | -0.9% | 2 |
| Feb 2, 2023 | 0918-47-347STP 2023(440)HESG | Dallas Dallas |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $1,807,305 | $1,765,418 | GARRET SHIELDS INFRASTRUCTURE | -2.3% | 4 |
| Feb 2, 2023 | 6427-50-001RMC - 642750001 | Hidalgo Pharr |
TRAFFIC SIGNAL MAINTENANCEIH 2 · | $1,859,142 | $1,653,231 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -11.1% | 3 |
| Feb 2, 2023 | 0916-29-014BR 2017(097) | Live Oak Corpus Christi |
REPLACE BRIDGE AND APPROACHESCR · | $1,603,811 | $1,589,267 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -0.9% | 2 |
| Feb 2, 2023 | 0915-00-253C 915-00-253 | Bexar San Antonio |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,498,036 | $1,505,726 | E-Z BEL CONSTRUCTION, LLC | +0.5% | 3 |
| Feb 2, 2023 | 6432-30-001RMC - 643230001 | Lubbock Lubbock |
TRAFFIC CONTROL SERVICESIH 27 · | $2,256,300 | $1,485,576 | BARRICADES UNLIMITED | -34.2% | 3 |
| Feb 2, 2023 | 1452-01-018STP 2023(479)HES | Lamar Paris |
HAZARD ELIMINATION & SAFETYFM 1507 · | $1,863,498 | $1,480,238 | HIGHWAY 19 CONSTRUCTION LLC | -20.6% | 2 |
| Feb 2, 2023 | 6429-12-001RMC - 642912001 | Fayette Yoakum |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $1,961,050 | $1,382,687 | GARRET SHIELDS INFRASTRUCTURE | -29.5% | 5 |
| Feb 2, 2023 | 0839-04-013BR 2023(465) | De Witt Yoakum |
BRIDGE REPLACEMENTFM 951 · | $1,450,461 | $1,281,562 | E-Z BEL CONSTRUCTION, LLC | -11.6% | 5 |
| Feb 2, 2023 | 6420-75-001RMC - 642075001 | Tom Green San Angelo |
TRAFFIC CONTROL SERVICESSH 208 · | $1,374,300 | $1,253,756 | ROSS SA ENTERPRISE LLC | -8.8% | 4 |
| Feb 2, 2023 | 6424-82-001RMC - 642482001 | Kaufman Dallas |
VEGETATION MANAGEMENTUS 175 · | $1,321,760 | $1,242,886 | JASCO | -6.0% | 3 |
| Feb 2, 2023 | 6420-57-001RMC - 642057001 | Tom Green San Angelo |
HYDRAULIC CEMENT CONCRETEUS 67 · | $868,793 | $1,180,570 | 3LW CIVIL LLC | +35.9% | 2 |
| Feb 2, 2023 | 0914-00-475C 914-00-475 | Travis Austin |
PREVENTIVE MAINTENANCEVA · | $1,402,790 | $1,109,149 | STRIPE-A-ZONE, LLC | -20.9% | 3 |
| Feb 2, 2023 | 6432-32-001RMC - 643232001 | Hale Lubbock |
TRAFFIC CONTROL SERVICESIH 27 · | $1,295,050 | $1,040,386 | FC TRAFFIC CONTROL, INC. | -19.7% | 3 |
| Feb 2, 2023 | 1167-01-011C 1167-1-11 | Uvalde San Antonio |
RESURFACE ROADWAYFM 1052 · | $1,102,680 | $1,021,333 | LONE STAR PAVING COMPANY | -7.4% | 3 |
| Feb 2, 2023 | 6430-36-001RMC - 643036001 | Brown Brownwood |
MILL AND INLAYSH 279 · | $1,070,027 | $916,604 | BLACKSMITH VENTURES LLC | -14.3% | 1 |
| Feb 2, 2023 | 6414-36-001RMC - 641436001 | Washington Bryan |
ROADWAY ENTRANCE & WALL, LIGHTING & LANDSCAPINGPR 12 · | $630,049 | $899,167 | TEXAS MATERIALS GROUP, INC. | +42.7% | 2 |
| Feb 2, 2023 | 6405-34-001RMC - 640534001 | Travis Austin |
INSTALLATION OF TRAFFIC SIGNALSIH 35 · | $750,301 | $898,125 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +19.7% | 2 |
| Feb 2, 2023 | 6431-30-001MMC - 643130001 | Bell Waco |
HOT MIXUS 190 · | $822,500 | $820,000 | BIG CREEK CONSTRUCTION, LTD. | -0.3% | 4 |
| Feb 2, 2023 | 6424-84-001RMC - 642484001 | Rockwall Dallas |
VEGETATION MANAGEMENTIH 30 · | $787,700 | $755,832 | GARRET SHIELDS INFRASTRUCTURE | -4.0% | 3 |
| Feb 2, 2023 | 0901-19-219C 901-19-219 | Grayson Paris |
BRIDGE MAINTENANCEVA · | $691,366 | $744,555 | HIGHWAY 19 CONSTRUCTION LLC | +7.7% | 7 |
| Feb 2, 2023 | 6430-75-001MMC - 643075001 | Franklin Paris |
DENSE GRADED HOT MIXUS 67 · | $688,000 | $712,000 | RK HALL, LLC | +3.5% | 2 |
| Feb 2, 2023 | 6400-73-001RMC - 640073001 | Comanche Brownwood |
MILL AND INLAYUS 67 · | $576,407 | $648,911 | BLACKSMITH VENTURES LLC | +12.6% | 1 |
| Feb 2, 2023 | 6430-50-001RMC - 643050001 | Midland Odessa |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)IH 20 · | $591,750 | $576,500 | MIJELUM, L.L.C. | -2.6% | 6 |
| Feb 2, 2023 | 6410-83-001RMC - 641083001 | Gonzales Yoakum |
MOWING HIGHWAY RIGHT OF WAYUS 183 · | $425,908 | $551,100 | MTS BRUSH HOGGING DOZER AND LAWN LLC | +29.4% | 3 |
| Feb 2, 2023 | 6405-30-001RMC - 640530001 | Williamson Austin |
MOWING HIGHWAY RIGHT OF WAYSH 195 · | $364,996 | $510,828 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | +40.0% | 4 |
| Feb 2, 2023 | 6410-80-001RMC - 641080001 | Lavaca Yoakum |
MOWING HIGHWAY RIGHT OF WAYUS 77 · | $344,540 | $461,076 | MTS BRUSH HOGGING DOZER AND LAWN LLC | +33.8% | 2 |
| Feb 2, 2023 | 6410-85-001RMC - 641085001 | De Witt Yoakum |
MOWING HIGHWAY RIGHT OF WAYUS 87 · | $344,648 | $460,944 | MTS BRUSH HOGGING DOZER AND LAWN LLC | +33.7% | 3 |
| Feb 2, 2023 | 6430-30-001MMC - 643030001 | Midland Odessa |
HOT MIXIH 20 · | $410,750 | $451,750 | TOUCHSTONE RESOURCES, LLC | +10.0% | 1 |
| Feb 2, 2023 | 6381-75-001MMC - 638175001 | Wharton Yoakum |
LRAUS 59 · | $446,400 | $444,525 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.4% | 2 |
| Feb 2, 2023 | 6431-28-001RMC - 643128001 | Ector Odessa |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)IH 20 · | $446,000 | $421,925 | VIZCAINO, L.P. | -5.4% | 6 |
| Feb 2, 2023 | 6430-69-001MMC - 643069001 | Wharton Yoakum |
EMULSIONUS 59 · | $394,500 | $390,723 | MARTIN RESOURCE MANAGEMENT CORPORATION | -1.0% | 2 |
| Feb 2, 2023 | 6427-67-001MMC - 642767001 | Wharton Yoakum |
AGGREGATEUS 59 · | $366,800 | $366,500 | QUALITY HOT MIX, INC. | -0.1% | 2 |
| Feb 2, 2023 | 6425-88-001RMC - 642588001 | Hunt Paris |
DITCH CLEANING AND RESHAPINGUS 69 · | $384,570 | $364,225 | TEXAS DRAINAGE INC. | -5.3% | 3 |
| Feb 2, 2023 | 1006-01-080C 1006-1-80 | Harris Houston |
INTERSECTION IMPROVEMENTFM 529 · | $300,601 | $355,217 | MAIN LANE INDUSTRIES LTD. | +18.2% | 3 |
| Feb 2, 2023 | 6421-33-001RMC - 642133001 | Wichita Wichita Falls |
MOWING HIGHWAY RIGHT OF WAYUS 287 · | $331,444 | $298,575 | MTS BRUSH HOGGING DOZER AND LAWN LLC | -9.9% | 2 |
| Feb 2, 2023 | 6424-48-001RMC - 642448001 | Collin Dallas |
MOWING HIGHWAY RIGHT OF WAYUS 75 · | $299,985 | $279,048 | GARRET SHIELDS INFRASTRUCTURE | -7.0% | 2 |
| Feb 2, 2023 | 0917-00-067BR 2023(417) | Brazos Bryan |
BRIDGE MAINTENANCEVA · | $183,912 | $244,435 | TALBRAN ENTERPRISES LLC | +32.9% | 4 |
| Feb 1, 2023 | 0003-05-055C 3-5-55 | Reeves Odessa |
HIGHWAY IMPROVEMENTIH 20 · | $60,513,367 | $56,142,249 | FNF CONSTRUCTION, INC. | -7.2% | 3 |
| Feb 1, 2023 | 0018-06-212C 18-6-212 | Webb Laredo |
RESURFACE ROADWAYIH 35 · | $31,488,481 | $29,750,033 | ANDERSON COLUMBIA CO., INC. | -5.5% | 3 |
| Feb 1, 2023 | 1064-01-032C 1064-1-32 | Hidalgo Pharr |
WIDEN ROAD - ADD LANESFM 676 · | $18,534,567 | $15,880,158 | TEXAS CORDIA CONSTRUCTION, LLC | -14.3% | 7 |
| Feb 1, 2023 | 0535-05-037C 535-5-37 | Gonzales Yoakum |
SURFACING/ROADWAY RESTORATIONIH 10 · | $12,180,001 | $12,470,411 | HUNTER INDUSTRIES, LTD. | +2.4% | 3 |
| Feb 1, 2023 | 1339-02-028BR 2023(457) | Lipscomb Amarillo |
BRIDGE REPLACEMENTFM 1454 · | $10,968,221 | $10,425,012 | COPPELL CONSTRUCTION CO., INC. | -5.0% | 5 |
| Feb 1, 2023 | 0393-01-101F 2023(453) | Gregg Tyler |
RESURFACE ROADWAYSH 149 · | $9,059,129 | $9,370,472 | MADDEN CONTRACTING COMPANY, LLC. | +3.4% | 2 |
| Feb 1, 2023 | 0231-02-066C 231-2-66 | Coryell Waco |
MILL AND INLAYIH 14 · | $10,266,461 | $9,294,253 | TEXAS MATERIALS GROUP, INC. | -9.5% | 3 |
| Feb 1, 2023 | 0174-04-040F 2023(409) | Fannin Paris |
REHABILITATE EXISTING ROADWAYFM 100 · | $10,653,892 | $9,250,012 | A. K. GILLIS & SONS, LLC | -13.2% | 4 |
| Feb 1, 2023 | 0218-03-087C 218-3-87 | Cass Atlanta |
REHABILITATE EXISTING FOUR LANE ROADWAYUS 59 · | $9,212,636 | $9,089,429 | RK HALL, LLC | -1.3% | 2 |
| Feb 1, 2023 | 0610-02-064STP 2022(803)TP | Franklin Paris |
CONSTRUCT REST AREAIH 30 · | $7,568,904 | $8,869,679 | LONGVIEW BRIDGE AND ROAD, LTD. | +17.2% | 5 |
| Feb 1, 2023 | 1553-02-008C 1553-2-8 | Live Oak Corpus Christi |
REHABILITATE EXISTING ROADWAYFM 1545 · | $8,491,912 | $7,861,814 | CK NEWBERRY, LLC | -7.4% | 5 |
| Feb 1, 2023 | 0366-02-094C 366-2-94 | Guadalupe San Antonio |
RESURFACE ROADWAYSH 123 · | $12,521,321 | $7,325,978 | HUNTER INDUSTRIES, LTD. | -41.5% | 4 |
| Feb 1, 2023 | 6428-52-001RMC - 642852001 | Tarrant Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 30 · | $5,333,176 | $6,102,773 | FOUTSCO PAVING COMPANY, LLC | +14.4% | 5 |
| Feb 1, 2023 | 0320-04-029C 320-4-29 | Williamson Austin |
PREVENTIVE MAINTENANCEUS 79 · | $5,910,823 | $5,596,125 | HUNTER INDUSTRIES, LTD. | -5.3% | 3 |
| Feb 1, 2023 | 2523-02-071C 2523-2-71 | Brazoria Houston |
SURFACING/ROADWAY RESTORATIONFM 2004 · | $4,939,738 | $4,976,855 | JAMES CONSTRUCTION GROUP, LLC | +0.8% | 3 |
| Feb 1, 2023 | 0028-14-116BR 2022(535) | Orange Beaumont |
BRIDGE MAINTENANCEIH 10 · | $6,832,289 | $4,742,241 | GIBSON & ASSOCIATES, INC. | -30.6% | 4 |
| Feb 1, 2023 | 2075-01-058C 2075-1-58 | Smith Tyler |
RESURFACE ROADWAYSL 323 · | $3,764,244 | $4,548,987 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +20.8% | 2 |
| Feb 1, 2023 | 1416-03-018C 1416-3-18 | Montgomery Houston |
HOT MIX OVERLAYFM 1486 · | $4,881,989 | $4,541,532 | JAMES CONSTRUCTION GROUP, LLC | -7.0% | 7 |
| Feb 1, 2023 | 0092-02-141BR 2023(441) | Dallas Dallas |
BRIDGE MAINTENANCEIH 45 · | $3,919,617 | $4,336,408 | STRUCTURAL INTEGRITY GROUP LLC | +10.6% | 4 |
| Feb 1, 2023 | 6404-39-001RMC - 640439001 | Harris Houston |
TOTAL MAINTENANCEIH 45 · | $3,721,110 | $4,333,798 | ROY JORGENSEN ASSOCIATES, INC. | +16.5% | 3 |
| Feb 1, 2023 | 0912-72-406BR 2020(124) | Harris Houston |
BRIDGE REPLACEMENTCS · | $4,337,204 | $4,303,858 | ARANDA BROTHERS CONSTRUCTION CO., INC. | -0.8% | 9 |
| Feb 1, 2023 | 0924-00-110F 2023(474) | El Paso El Paso |
PREVENTIVE MAINTENANCEVA · | $4,071,954 | $3,850,596 | PMI PAVEMENT MARKING, LLC | -5.4% | 4 |
| Feb 1, 2023 | 0911-00-095C 911-00-95 | Angelina Lufkin |
HIGHWAY IMPROVEMENTVA · | $3,604,870 | $3,368,123 | CENTERLINE TECHNOLOGIES, LLC | -6.6% | 5 |
| Feb 1, 2023 | 6431-88-001MMC - 643188001 | Cherokee Tyler |
HOT MIXUS 69 · | $3,143,500 | $3,236,840 | LONGVIEW ASPHALT, INC. | +3.0% | 1 |
| Feb 1, 2023 | 6405-42-001RMC - 640542001 | Travis Austin |
METAL BEAM GUARD FENCE REPAIRIH 35 · | $4,594,500 | $3,044,832 | BK FIELD OPERATIONS LLC | -33.7% | 2 |
| Feb 1, 2023 | 0442-02-169BR 2023(442) | Dallas Dallas |
BRIDGE MAINTENANCEIH 35E · | $2,126,692 | $2,531,499 | IBCTX, LLC | +19.0% | 3 |
| Feb 1, 2023 | 6431-60-001MMC - 643160001 | Smith Tyler |
HOT MIXUS 69 · | $2,278,080 | $2,527,200 | TEXAS MATERIALS GROUP, INC. | +10.9% | 1 |
| Feb 1, 2023 | 0912-72-558BR 2022(517) | Brazoria Houston |
BRIDGE REPLACEMENTCS · | $2,586,489 | $2,503,744 | ARANDA BROTHERS CONSTRUCTION CO., INC. | -3.2% | 6 |
| Feb 1, 2023 | 0146-07-033F 2023(460) | Wilbarger Wichita Falls |
REPLACE GUARDRAILUS 70 · | $2,305,003 | $2,143,240 | GARRET SHIELDS INFRASTRUCTURE | -7.0% | 5 |
| Feb 1, 2023 | 0265-02-045C 265-2-45 | Travis Austin |
RESURFACE ROADWAYSH 71 · | $2,643,225 | $2,068,354 | LONE STAR PAVING COMPANY | -21.7% | 4 |
| Feb 1, 2023 | 0923-00-069F 2023(448) | Brown Brownwood |
PREVENTIVE MAINTENANCEVA · | $1,438,775 | $1,992,104 | L&L COMPANY | +38.5% | 7 |
| Feb 1, 2023 | 6396-98-001MMC - 639698001 | Tarrant Fort Worth |
HOT MIXIH 35W · | $1,730,000 | $1,678,900 | AUSTIN ASPHALT, INC. | -3.0% | 4 |
| Feb 1, 2023 | 1537-01-017BR 2023(476) | Lee Austin |
BRIDGE REPLACEMENTFM 1624 · | $1,511,248 | $1,524,020 | SB CONTRACTORS LLC | +0.8% | 6 |
| Feb 1, 2023 | 6424-80-001RMC - 642480001 | Kaufman Dallas |
VEGETATION MANAGEMENTIH 20 · | $1,564,210 | $1,475,750 | CROSS PLUS CONSTRUCTION, LLC | -5.7% | 3 |
| Feb 1, 2023 | 2034-01-013BR 2023(436) | Scurry Abilene |
BRIDGE REPLACEMENTFM 1298 · | $1,402,625 | $1,393,947 | COPPELL CONSTRUCTION CO., INC. | -0.6% | 4 |
| Feb 1, 2023 | 6424-67-001RMC - 642467001 | Montgomery Houston |
SWEEPING AND DEBRIS REMOVALIH 45 · | $1,204,850 | $1,391,492 | PROFESSIONAL TRAFFIC CONTROL LLC | +15.5% | 4 |
| Feb 1, 2023 | 0905-00-116C 905-00-116 | Lubbock Lubbock |
RAISED PAVEMENT MARKERSVA · | $1,483,985 | $1,311,802 | BRYDL CONTRACTING, LLC | -11.6% | 5 |
| Feb 1, 2023 | 0079-05-062STP 2023(143)HES | Erath Fort Worth |
INSTALL ILLUMINATIONUS 67 · | $1,216,893 | $1,284,729 | MASSANA CONSTRUCTION INC. | +5.6% | 6 |
| Feb 1, 2023 | 6432-26-001RMC - 643226001 | Terry Lubbock |
TRAFFIC CONTROL SERVICESUS 62 · | $1,245,050 | $1,154,459 | FC TRAFFIC CONTROL, INC. | -7.3% | 2 |
| Feb 1, 2023 | 6429-14-001RMC - 642914001 | El Paso El Paso |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $1,221,390 | $1,096,193 | E. G. L. CONSTRUCTION, INC. | -10.3% | 4 |
| Feb 1, 2023 | 1812-02-026F 2023(469) | Chambers Beaumont |
REHABILITATE EXISTING ROADWAYFM 1942 · | $1,034,962 | $1,093,301 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +5.6% | 3 |
| Feb 1, 2023 | 0035-04-039BR 2023(404) | Concho San Angelo |
BRIDGE MAINTENANCEUS 83 · | $1,282,793 | $1,084,438 | 3LW CIVIL LLC | -15.5% | 5 |
| Feb 1, 2023 | 6431-36-001MMC - 643136001 | Hamilton Waco |
HOT MIXUS 281 · | $1,017,400 | $1,071,200 | BIG CREEK CONSTRUCTION, LTD. | +5.3% | 3 |
| Feb 1, 2023 | 6423-66-001RMC - 642366001 | Jefferson Beaumont |
SWEEPING AND DEBRIS REMOVALUS 69 · | $1,017,515 | $969,739 | SWEEPING CORPORATION OF AMERICA, LLC | -4.7% | 2 |
| Feb 1, 2023 | 0910-08-080C 910-8-80 | Anderson Tyler |
STATE PARK IMPROVEMENTSVA · | $1,057,250 | $958,749 | BAKER & COMPANY CONSTRUCTION, LLC | -9.3% | 6 |
| Feb 1, 2023 | 6408-53-001RMC - 640853001 | Brazoria Houston |
EROSION REPAIRFM 521 · | $1,121,359 | $928,042 | ENVIRONMENTAL ALLIES, INC. | -17.2% | 5 |
| Feb 1, 2023 | 0914-22-076BR 2021(666) | Caldwell Austin |
BRIDGE REPLACEMENTCR · | $741,610 | $777,849 | SB CONTRACTORS LLC | +4.9% | 5 |
| Feb 1, 2023 | 6410-87-001RMC - 641087001 | Gonzales Yoakum |
MOWING HIGHWAY RIGHT OF WAYIH 10 · | $468,544 | $757,724 | P-VILLE, INCORPORATED | +61.7% | 1 |
| Feb 1, 2023 | 6410-89-001RMC - 641089001 | Victoria Yoakum |
MOWING HIGHWAY RIGHT OF WAYUS 59 · | $485,126 | $754,831 | R&M INCORPORATED | +55.6% | 1 |
| Feb 1, 2023 | 6428-98-001RMC - 642898001 | Victoria Yoakum |
METAL BEAM GUARD FENCE REPAIRUS 59 · | $1,106,625 | $754,615 | JCW CONSTRUCTION, LLC | -31.8% | 5 |
| Feb 1, 2023 | 6410-82-001RMC - 641082001 | Fayette Yoakum |
MOWING HIGHWAY RIGHT OF WAYSH 71 · | $497,124 | $727,274 | P-VILLE, INCORPORATED | +46.3% | 1 |
| Feb 1, 2023 | 6428-70-001MMC - 642870001 | Fannin Paris |
DENSE GRADED HOT MIXUS 69 · | $704,000 | $704,000 | RK HALL, LLC | 0.0% | 3 |
| Feb 1, 2023 | 6422-91-001MMC - 642291001 | Brazos Bryan |
AGGREGATESH 6 · | $620,000 | $671,600 | ARCOSA LWS, LLC | +8.3% | 1 |
| Feb 1, 2023 | 6410-99-001RMC - 641099001 | Wharton Yoakum |
MOWING HIGHWAY RIGHT OF WAYFM 102 · | $472,900 | $641,252 | P-VILLE, INCORPORATED | +35.6% | 4 |
| Feb 1, 2023 | 6419-91-001RMC - 641991001 | Tarrant Fort Worth |
SKID RESTORATION (NON-REHAB)IH 35W · | $976,160 | $639,942 | SKIDABRADER GROUP LLC | -34.4% | 1 |
| Feb 1, 2023 | 6430-08-001MMC - 643008001 | Matagorda Yoakum |
HOT-MIX COLD-LAIDSH 35 · | $618,000 | $606,000 | QUALITY HOT MIX, INC. | -1.9% | 5 |
| Feb 1, 2023 | 6422-45-001RMC - 642245001 | Brazoria Houston |
MOWING HIGHWAY RIGHT OF WAYFM 521 · | $678,728 | $566,295 | RELIANT SAND AND CONSTRUCTION, INC. | -16.6% | 4 |
| Feb 1, 2023 | 6430-26-001RMC - 643026001 | Walker Bryan |
METAL BEAM GUARD FENCE REPAIRSH 30 · | $583,280 | $548,925 | GARRET SHIELDS INFRASTRUCTURE | -5.9% | 4 |
| Feb 1, 2023 | 6428-36-001RMC - 642836001 | Wichita Wichita Falls |
DEBRIS REMOVALUS 82 · | $409,950 | $531,600 | GARRET SHIELDS INFRASTRUCTURE | +29.7% | 1 |
| Feb 1, 2023 | 0422-03-084C 422-3-84 | Johnson Fort Worth |
DRAINAGE IMPROVEMENTSUS 67 · | $577,615 | $524,587 | WESSON CONSTRUCTION SERVICES, LLC | -9.2% | 9 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.