| 1 | 100-6007 |
PREP ROW (TREE)(GREATER THAN 24" DIA) | 2 | EA |
$2,480.00 |
$6,300.00 |
$5,088.08 |
| 2 | 100-6015 |
PREPARING ROW (HAND CLEARING) | 0.17 | AC |
$10,700.00 |
$40,000.00 |
$5,985.94 |
| 3 | 104-6028 |
REMOVING CONC (MISC) | 13 | SY |
$400.00 |
$220.00 |
$442.96 |
| 4 | 105-6002 |
REMOVING STAB BASE AND ASPH PAV (2") | 324 | SY |
$8.00 |
$28.00 |
$18.48 |
| 5 | 110-6001 |
EXCAVATION (ROADWAY) | 206 | CY |
$15.00 |
$50.00 |
$70.25 |
| 6 | 132-6001 |
EMBANKMENT (FINAL)(ORD COMP)(TY A) | 101 | CY |
$8.00 |
$110.00 |
$90.73 |
| 7 | 161-6009 |
EROSION CONTROL COMPOST | 3 | CY |
$19.00 |
$750.00 |
$63.45 |
| 8 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 1,089 | SY |
$0.1200 |
$1.50 |
$0.2900 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 5.04 | MG |
$25.00 |
$600.00 |
$101.76 |
| 10 | 170-6001 |
IRRIGATION SYSTEM | 1 | LS |
$27,400.00 |
$12,000.00 |
$11,630.76 |
| 11 | 180-6001 |
WILDFLOWER SEEDING | 0.14 | AC |
$1,200.00 |
$5,000.00 |
$1,029.64 |
| 12 | 192-6002 |
PLANT MATERIAL (1-GAL) | 110 | EA |
$20.00 |
$14.00 |
$12.99 |
| 13 | 192-6004 |
PLANT MATERIAL (5-GAL) | 29 | EA |
$30.00 |
$39.00 |
$30.23 |
| 14 | 192-6014 |
PLANT SOIL MIX | 29 | CY |
$70.00 |
$190.00 |
$69.44 |
| 15 | 192-6084 |
PLANT MATERIAL (200 GAL) (TREE) | 4 | EA |
$3,000.00 |
$4,000.00 |
$3,238.41 |
| 16 | 193-6001 |
PLANT MAINTENANCE | 6 | MO |
$500.00 |
$500.00 |
$1,556.36 |
| 17 | 247-6230 |
FL BS (CMP IN PLACE)(TY A GR 1-2)(8") | 692 | SY |
$16.00 |
$70.00 |
$31.12 |
| 18 | 275-6001 |
CEMENT | 8 | TON |
$245.00 |
$300.00 |
$235.90 |
| 19 | 275-6003 |
CEMENT TREAT (NEW BASE) (6") | 30 | SY |
$4.00 |
$150.00 |
$175.49 |
| 20 | 275-6011 |
CEMENT TREAT(EXIST MATL)(8") | 715 | SY |
$5.00 |
$14.00 |
$29.45 |
| 21 | 310-6012 |
PRIME COAT (RC-250) | 173 | GAL |
$7.00 |
$16.00 |
$23.94 |
| 22 | 316-6403 |
AGGR (TY-B GR-5 OR TY-L GR-5) | 11 | CY |
$156.00 |
$750.00 |
$179.58 |
| 23 | 432-6001 |
RIPRAP (CONC)(4 IN) | 0.15 | CY |
$700.00 |
$6,400.00 |
$109,689.13 |
| 24 | 464-6005 |
RC PIPE (CL III)(24 IN) | 130 | LF |
$100.00 |
$137.00 |
$72.74 |
| 25 | 467-6394 |
SET (TY II) (24 IN) (RCP) (6: 1) (C) | 2 | EA |
$1,500.00 |
$2,700.00 |
$1,710.22 |
| 26 | 481-6023 |
PIPE (PVC) (SCH 80) (6 IN) | 30 | LF |
$50.00 |
$125.00 |
$95.36 |
| 27 | 496-6032 |
REMOV STR (ROCKWALL) | 3 | EA |
$1,000.00 |
$4,500.00 |
$1,316.91 |
| 28 | 496-6043 |
REMOV STR (SMALL FENCE) | 332 | LF |
$6.00 |
$4.80 |
$15.15 |
| 29 | 496-6045 |
REMOV STR (FLAG POLE) | 1 | EA |
$10.00 |
$1,000.00 |
$299.30 |
| 30 | 496-6050 |
REMOV STR (DRIVEWAY CULVERT) | 1 | EA |
$600.00 |
$2,300.00 |
$2,753.55 |
| 31 | 500-6001 |
MOBILIZATION | 1 | LS |
$64,241.46 |
$85,000.00 |
$248,181.33 |
| 32 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$5,000.00 |
$2,800.00 |
$7,562.10 |
| 33 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 425 | LF |
$4.00 |
$5.00 |
$2.39 |
| 34 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 425 | LF |
$2.00 |
$2.00 |
$2.63 |
| 35 | 528-6002 |
COLORED TEXTURED CONC (6") | 118 | SY |
$110.00 |
$300.00 |
$456.54 |
| 36 | 529-6007 |
CONC CURB & GUTTER (TY I) | 331 | LF |
$165.00 |
$85.00 |
$108.64 |
| 37 | 618-6013 |
CONDT (PVC) (SCH 40) (1/2") | 300 | LF |
$8.43 |
$10.00 |
$18.48 |
| 38 | 618-6019 |
CONDT (PVC) (SCH 40) (1 1/4") | 160 | LF |
$24.75 |
$15.00 |
$22.24 |
| 39 | 620-6004 |
ELEC CONDR (NO.12) INSULATED | 2,235 | LF |
$1.03 |
$1.00 |
$1.84 |
| 40 | 624-6001 |
GROUND BOX TY A (122311) | 4 | EA |
$916.55 |
$1,300.00 |
$719.43 |
| 41 | 628-6115 |
ELC SRV TY D 120/240 060(NS)AL(E)PS(U) | 1 | EA |
$5,393.53 |
$5,500.00 |
$13,441.36 |
| 42 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 1 | EA |
$708.00 |
$900.00 |
$863.93 |
| 43 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 2 | EA |
$770.00 |
$700.00 |
$1,119.38 |
| 44 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 26 | LF |
$12.00 |
$15.00 |
$10.09 |
| 45 | 666-6138 |
REFL PAV MRK TY I (Y)8"(SLD)(100MIL) | 330 | LF |
$2.00 |
$5.00 |
$10.09 |
| 46 | 760-6001 |
DITCH CLEANING AND RESHAPING (FOOT) | 60 | LF |
$5.00 |
$60.00 |
$76.36 |
| 47 | 1002-6002 |
LANDSCAPE AMENITY (TY 1) | 1 | EA |
$149,800.00 |
$140,000.00 |
$355,978.77 |
| 48 | 1002-6003 |
LANDSCAPE AMENITY (TY 2) | 2 | EA |
$21,200.00 |
$50,000.00 |
$98,117.01 |
| 49 | 1002-6004 |
LANDSCAPE AMENITY (TY 3) | 2 | EA |
$2,400.00 |
$12,000.00 |
$5,713.62 |
| 50 | 1002-6005 |
LANDSCAPE AMENITY (TY 4) | 19 | EA |
$1,000.00 |
$1,200.00 |
$2,153.13 |
| 51 | 1002-6006 |
LANDSCAPE AMENITY (TY 5) | 92 | EA |
$200.00 |
$700.00 |
$550.45 |
| 52 | 1002-6007 |
LANDSCAPE AMENITY (TY 6) | 4 | EA |
$2,400.00 |
$1,500.00 |
$1,549.24 |
| 53 | 1002-6008 |
LANDSCAPE AMENITY (TY 7) | 2 | EA |
$600.00 |
$2,400.00 |
$888.89 |
| 54 | 1004-6001 |
TREE PROTECTION | 7 | EA |
$900.00 |
$400.00 |
$502.15 |
| 55 | 3076-6035 |
D-GR HMA TY-D PG64-22 | 152 | TON |
$231.00 |
$190.00 |
$199.33 |
| 56 | 3076-6052 |
D-GR HMA TY-D SAC-A PG76-28 | 330 | TON |
$94.00 |
$200.00 |
$263.38 |
| 57 | 3076-6054 |
D-GR HMA TY-F PG64-22 | 73 | TON |
$134.00 |
$210.00 |
$251.41 |
| 58 | 3084-6001 |
BONDING COURSE | 136 | GAL |
$6.00 |
$10.00 |
$10.18 |
| 59 | 6185-6002 |
TMA (STATIONARY) | 30 | DAY |
$225.00 |
$200.00 |
$549.03 |