101Let jobs
$425,850,380Total low bids
$432,241,296Total estimates
-1.5%Low bids vs estimates
Feb 2020 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 19, 2020 | 6343-57-001BPM - 634357001 | Karnes Corpus Christi |
CONCRETE STRUCTURE REPAIRFM 791 · | $293,245 | $836,534 | RELMCO, INC. | +185.3% | 6 |
| Feb 19, 2020 | 6343-59-001BPM - 634359001 | Refugio Corpus Christi |
BRIDGE PREVENTATIVE MAINTENANCESH 35 · | $291,818 | $189,060 | SJ&J CONSTRUCTION, LLC | -35.2% | 7 |
| Feb 7, 2020 | 0463-06-028STP 2020(573) | Winkler Odessa |
ROADWAY REHABILITATIONSH 302 · | $59,930,087 | $63,338,505 | FNF CONSTRUCTION, INC. | +5.7% | 4 |
| Feb 7, 2020 | 6336-08-001RMC - 633608001 | Travis Austin |
PERFORMANCE BASED CONTRACTSH 130 · | $27,449,730 | $22,626,610 | ROY JORGENSEN ASSOCIATES, INC. | -17.6% | 4 |
| Feb 7, 2020 | 6344-05-001RMC - 634405001 | Liberty Beaumont |
STABILIZE BANK OF TRINITY RIVERFM 787 · | $14,810,762 | $15,552,096 | TEXAS MATERIALS GROUP, INC. | +5.0% | 6 |
| Feb 7, 2020 | 0446-03-047BR 2019(096) | Colorado Yoakum |
REPLACE BRIDGE AND APPROACHESUS 90A · | $11,245,966 | $12,487,777 | ZACHRY CONSTRUCTION CORPORATION | +11.0% | 2 |
| Feb 7, 2020 | 0005-02-118NH 2020(570) | Midland Odessa |
ROADWAY REHABILITATIONBI 20-E · | $14,628,167 | $12,018,225 | REECE ALBERT, INC. | -17.8% | 5 |
| Feb 7, 2020 | 0495-03-063NH 2020(301) | Van Zandt Tyler |
PLANING, PAVEMENT REPAIR, OCST, OV, MBGF, PV MKIH 20 · | $6,817,962 | $6,622,009 | AUSTIN BRIDGE & ROAD SERVICES, LP | -2.9% | 2 |
| Feb 7, 2020 | 0658-01-044STP 2020(557)MM | Bexar San Antonio |
EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SWFM 1535 · | $5,732,853 | $5,683,754 | J3 COMPANY, LLC | -0.9% | 7 |
| Feb 7, 2020 | 0120-05-026STP 2020(564) | Hamilton Waco |
REHAB & WIDEN ROADWAYFM 218 · | $4,906,992 | $5,387,759 | BIG CREEK CONSTRUCTION, LTD. | +9.8% | 5 |
| Feb 7, 2020 | 0902-00-167STP 2020(582) | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALVA · | $4,999,994 | $4,660,000 | DURABLE SPECIALTIES, INC. | -6.8% | 2 |
| Feb 7, 2020 | 0913-09-089BR 1702(587) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $3,424,358 | $3,985,642 | TREVWAY, INC. | +16.4% | 3 |
| Feb 7, 2020 | 2150-02-009SSW 215-2-9 | Webb Laredo |
BASE,GRADE,ACP,PAV MARKFM 1472 · | $2,458,000 | $3,148,791 | ANDERSON COLUMBIA CO., INC. | +28.1% | 6 |
| Feb 7, 2020 | 0550-02-049STP 2020(581) | Erath Fort Worth |
RESURFACE ROADWAYFM 8 · | $3,528,459 | $3,111,772 | NORTHEASTERN PAVERS, LLC | -11.8% | 3 |
| Feb 7, 2020 | 0367-01-070NH 2020(641) | Chambers Beaumont |
OV-OVERLAYSH 124 · | $2,843,823 | $2,844,750 | ANGEL BROTHERS HOLDINGS CORP. | +0.0% | 3 |
| Feb 7, 2020 | 0924-00-142STP 2020(535) | El Paso El Paso |
FY 2020 STRIPING PROJECTVA · | $2,965,381 | $2,744,921 | CENTERLINE TECHNOLOGIES, LLC | -7.4% | 4 |
| Feb 7, 2020 | 0113-02-065NH 2020(541) | Gillespie Austin |
OVERLAYUS 290 · | $3,104,717 | $2,725,725 | LONE STAR PAVING COMPANY | -12.2% | 8 |
| Feb 7, 2020 | 0101-05-036NH 2020(533) | San Patricio Corpus Christi |
OVERLAY OF EXISTING ROADWAYUS 181 · | $2,449,236 | $2,555,979 | BAY LTD. | +4.4% | 3 |
| Feb 7, 2020 | 0055-01-029STP 2020(530)HES | Mills Brownwood |
PROFILE CENTER & EDGELINE AND THERMO STRIPINGUS 84 · | $2,792,837 | $2,363,261 | DOUBLE A CONTRACTING, L.P. | -15.4% | 8 |
| Feb 7, 2020 | 0558-07-019STP 2020(645) | Glasscock San Angelo |
SEAL COATRM 33 · | $2,441,118 | $2,255,155 | BRANNAN PAVING CO., LTD. | -7.6% | 3 |
| Feb 7, 2020 | 0177-03-103NH 2020(591) | Liberty Beaumont |
OV-OVERLAYUS 59 · | $2,742,971 | $2,133,678 | SMITH & COMPANY | -22.2% | 5 |
| Feb 7, 2020 | 6353-58-001RMC - 635358001 | Fayette Yoakum |
METAL BEAM GUARDFENCE REPAIR (ON CALL)IH 10 · | $2,586,600 | $1,973,450 | ELITE CASTLE RESOURCES LLC | -23.7% | 3 |
| Feb 7, 2020 | 6353-78-001RMC - 635378001 | Hopkins Paris |
FULL DEPTH CONCRETE REPAIRIH 30 · | $2,003,692 | $1,777,711 | GHB EQUIPMENT COMPANY, L.L.C. | -11.3% | 5 |
| Feb 7, 2020 | 0543-01-065STP 2020(595) | Waller Houston |
PLANING, SEAL COAT, ACP OVERLAY AND TEXTURINGFM 359 · | $1,753,720 | $1,597,357 | ANGEL BROTHERS HOLDINGS CORP. | -8.9% | 5 |
| Feb 7, 2020 | 0520-08-068STP 2020(561) | Anderson Tyler |
PLANING, PVT REPAIR, OCST, ACP, MBGF & PV MKSH 155 · | $2,276,343 | $1,534,653 | REYNOLDS & KAY, LTD. | -32.6% | 5 |
| Feb 7, 2020 | 0918-47-179STP 2020(580)HES | Dallas Dallas |
INSTALLATION OF TRAFFIC SIGNALSCS · | $1,579,756 | $1,480,000 | DURABLE SPECIALTIES, INC. | -6.3% | 3 |
| Feb 7, 2020 | 2021-01-013STP 2020(559) | Comal San Antonio |
REHABILITATE EXISTING ROADWAYFM 1044 · | $1,669,288 | $1,447,351 | ANGEL BROTHERS HOLDINGS CORP. | -13.3% | 7 |
| Feb 7, 2020 | 0905-00-107STP 2020(569) | Lubbock Lubbock |
TRAFFIC CONTROL DEVICESVA · | $1,175,541 | $1,385,650 | BRYDL CONTRACTING, INC. | +17.9% | 3 |
| Feb 7, 2020 | 6354-20-001RMC - 635420001 | Zavala Laredo |
SPOT BASE REPAIRFM 393 · | $1,424,893 | $1,349,226 | ANDERSON COLUMBIA CO., INC. | -5.3% | 4 |
| Feb 7, 2020 | 0904-00-188STP 2020(551) | Potter Amarillo |
IMPROVE TRAFFIC SIGNALSVA · | $1,254,778 | $1,274,692 | SIEMENS MOBILITY, INC. | +1.6% | 2 |
| Feb 7, 2020 | 6315-49-001RMC - 631549001 | Tarrant Fort Worth |
MULTIPOLYMER STRIPING,RPM'S & ELIMINATIONSH 360 · | $1,693,939 | $1,246,955 | TOTAL HIGHWAY MAINTENANCE, LLC | -26.4% | 2 |
| Feb 7, 2020 | 6355-20-001RMC - 635520001 | Trinity Lufkin |
ON-CALL TRAFFIC CONTROL SERVICESSH 19 · | $1,073,055 | $1,156,905 | AREA WIDE PROTECTIVE, INC. | +7.8% | 2 |
| Feb 7, 2020 | 6353-60-001RMC - 635360001 | Wharton Yoakum |
METAL BEAM GUARDFENCE REPAIR (ON CALL)US 59 · | $1,344,400 | $1,148,040 | K-BAR SERVICES, INC. | -14.6% | 4 |
| Feb 7, 2020 | 6346-34-001RMC - 634634001 | Harris Houston |
BEARING PAD REPLACEMENT, BRIDGE JOINT REPAIR, MISCIH 69 · | $1,153,197 | $1,121,901 | RAGLE CONSTRUCTION, INC. | -2.7% | 6 |
| Feb 7, 2020 | 6349-60-001RMC - 634960001 | Harris Houston |
MNT OF ILLUMINATION SYSIH 610 · | $1,165,565 | $969,087 | LINDSEY ELECTRIC, L.P. | -16.9% | 7 |
| Feb 7, 2020 | 6349-59-001RMC - 634959001 | Harris Houston |
PREV MNT OF SGNL EQUIPIH 610 · | $1,264,010 | $935,089 | LINDSEY ELECTRIC, L.P. | -26.0% | 8 |
| Feb 7, 2020 | 6351-92-001RMC - 635192001 | Ector Odessa |
MISCELLANEOUS CONCRETEIH 20 · | $797,389 | $890,701 | DCI CONTRACTING, INC. | +11.7% | 2 |
| Feb 7, 2020 | 6353-59-001RMC - 635359001 | Victoria Yoakum |
METAL BEAM GUARDFENCE REPAIR (ON CALL)US 59 · | $1,415,250 | $823,974 | ELITE CASTLE RESOURCES LLC | -41.8% | 4 |
| Feb 7, 2020 | 6351-32-001RMC - 635132001 | Johnson Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 35W · | $820,089 | $750,411 | TEXAS MATERIALS GROUP, INC. | -8.5% | 5 |
| Feb 7, 2020 | 6352-82-001BPM - 635282001 | Wheeler Childress |
BRIDGE PREVENTATIVE MAINTENANCEIH 40 · | $707,146 | $697,998 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -1.3% | 8 |
| Feb 7, 2020 | 6334-50-001BPM - 633450001 | Fayette Yoakum |
EROSION REPAIRSIH 10 · | $742,850 | $650,377 | TALBRAN ENTERPRISES LLC | -12.4% | 6 |
| Feb 7, 2020 | 6353-03-001RMC - 635303001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)IH 69 · | $385,225 | $563,436 | PMI PAVEMENT MARKING, LLC | +46.3% | 2 |
| Feb 7, 2020 | 0203-01-060STP 2020(566)HES | Hunt Paris |
INSTALL CONTINUOUS TURN LANEUS 69 · | $278,291 | $444,442 | EAST TEXAS BRIDGE, INC. | +59.7% | 1 |
| Feb 7, 2020 | 0204-05-040NH 2020(555) | Milam Bryan |
INSTALL TWO-WAY LEFT TURN LANEUS 79 · | $323,399 | $376,466 | KNIFE RIVER CORPORATION - SOUTH | +16.4% | 6 |
| Feb 7, 2020 | 6351-16-001RMC - 635116001 | Tarrant Fort Worth |
CALLOUT STRIIPING, RPMS AND PREFABIH 820 · | $347,837 | $334,710 | TRP CONSTRUCTION GROUP, LLC | -3.8% | 3 |
| Feb 7, 2020 | 6347-88-001RMC - 634788001 | Webb Laredo |
TIRE RUBBER DEBRIS REMOVAL ON ROADWAYSIH 35 · | $307,116 | $276,565 | ALTUS CONSTRUCTION LLC | -9.9% | 3 |
| Feb 7, 2020 | 6349-43-001RMC - 634943001 | Bell Waco |
LIFT STATION REPLACEMENTIH 35 · | $150,982 | $250,000 | SJ&J CONSTRUCTION, LLC | +65.6% | 1 |
| Feb 7, 2020 | 6344-15-001RMC - 634415001 | Erath Fort Worth |
REFLECTORIZED PAVEMENT MARKINGS AND MARKERSUS 377 · | $323,241 | $174,796 | D. I. J. CONSTRUCTION, INC. | -45.9% | 5 |
| Feb 7, 2020 | 0914-00-436STP 2020(588) | Travis Austin |
INSTALLATION OF CURVE WARNING SIGNSVA · | $152,570 | $148,810 | TRP CONSTRUCTION GROUP, LLC | -2.5% | 3 |
| Feb 7, 2020 | 0914-00-437STP 2020(590) | Travis Austin |
TRAFFIC CONTROL DEVICESVA · | $111,640 | $117,922 | STRIPE-A-ZONE, INC. | +5.6% | 4 |
| Feb 7, 2020 | 0914-00-438C 914-00-438 | Travis Austin |
TRAFFIC CONTROL DEVICESVA · | $86,250 | $72,573 | TRP CONSTRUCTION GROUP, LLC | -15.9% | 4 |
| Feb 6, 2020 | 0275-01-199NH 2020(549) | Potter Amarillo |
B-2 PHASE II: RECONSTRUCT IH 40 2ND LEVEL MAINLANEIH 40 · | $47,476,789 | $50,032,708 | ALLEN BUTLER CONSTRUCTION, INC. | +5.4% | 3 |
| Feb 6, 2020 | 0228-05-066NH 2020(571) | Andrews Odessa |
ROADWAY RECONSTRUCTIONUS 385 · | $43,930,131 | $49,841,453 | FNF CONSTRUCTION, INC. | +13.5% | 4 |
| Feb 6, 2020 | 0228-06-090NH 2020(572) | Ector Odessa |
ROADWAY REHABILITATIONUS 385 · | $10,455,311 | $11,688,883 | REECE ALBERT, INC. | +11.8% | 4 |
| Feb 6, 2020 | 0039-17-198NH 2020(562) | Hidalgo Pharr |
OVERLAYIH 2 · | $9,059,721 | $9,929,405 | ANDERSON COLUMBIA CO., INC. | +9.6% | 2 |
| Feb 6, 2020 | 0902-50-129STP 2020(687) | Johnson Fort Worth |
PREVENTIVE MAINTENANCEVA · | $13,424,527 | $9,368,282 | NORTHEASTERN PAVERS, LLC | -30.2% | 7 |
| Feb 6, 2020 | 0336-07-071NH 2020(520) | San Augustine Lufkin |
REHABILITATE EXISTING ROADSH 103 · | $8,418,375 | $8,461,461 | MOORE BROTHERS CONSTRUCTION COMPANY | +0.5% | 1 |
| Feb 6, 2020 | 0022-09-053NH 2020(539) | Val Verde Laredo |
ACP, PAV MRKS, PLANINGUS 90 · | $9,064,225 | $8,302,881 | ANDERSON COLUMBIA CO., INC. | -8.4% | 2 |
| Feb 6, 2020 | 0167-01-128NH 2020(602) | El Paso El Paso |
PREVENTIVE MAINTENANCEUS 54 · | $9,162,847 | $7,012,064 | J.D. ABRAMS, L.P. | -23.5% | 4 |
| Feb 6, 2020 | 1575-05-022STP 2020(538) | Harrison Atlanta |
CEMENT TREAT BASE, ACP AND PAV MRKSSL 390 · | $4,700,137 | $5,981,442 | MADDEN CONTRACTING COMPANY, LLC. | +27.3% | 3 |
| Feb 6, 2020 | 2149-01-010C 2149-1-10 | Howard Abilene |
EXCAVATION, EMBANKMENT, FLEX BASE, STRUCTURES ANDFM 2230 · | $6,187,879 | $5,693,175 | TIERRA LEASE SERVICE, LLC | -8.0% | 6 |
| Feb 6, 2020 | 0050-05-067STP 2020(593) | Waller Houston |
SURFACING/ROADWAY RESTORATIONBU 290H · | $5,691,832 | $5,433,537 | JAMES CONSTRUCTION GROUP, L.L.C. | -4.5% | 5 |
| Feb 6, 2020 | 0391-04-027STP 1802(484) | Clay Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHSH 148 · | $4,968,612 | $4,202,297 | JAGOE-PUBLIC COMPANY | -15.4% | 6 |
| Feb 6, 2020 | 0905-00-094STP 2020(568) | Lubbock Lubbock |
FY 2020 STRIPINGVA · | $4,007,828 | $3,964,416 | VIZCAINO, L.P. | -1.1% | 7 |
| Feb 6, 2020 | 6349-83-001RMC - 634983001 | Galveston Houston |
FY20 DREDGE BOLIVAR FERRY LANDINGSH 87 · | $3,622,000 | $3,245,000 | CALLAN MARINE LTD | -10.4% | 2 |
| Feb 6, 2020 | 0183-04-053STP 2020(565) | Coryell Waco |
ASPHALTIC CONCRETE OVERLAYSH 36 · | $3,097,761 | $2,987,724 | BIG CREEK CONSTRUCTION, LTD. | -3.6% | 4 |
| Feb 6, 2020 | 0265-06-033NH 2020(543) | Bastrop Austin |
OVERLAYSH 71 · | $2,714,762 | $2,787,167 | BIG CREEK CONSTRUCTION, LTD. | +2.7% | 6 |
| Feb 6, 2020 | 0095-06-073STP 2020(560)HES | Van Zandt Tyler |
IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAILUS 80 · | $2,971,188 | $2,544,981 | BAKER & COMPANY CONSTRUCTION, LLC | -14.3% | 9 |
| Feb 6, 2020 | 0113-13-177NH 2020(542) | Travis Austin |
MILL, SEAL & THIN OV FRONTAGE ROADSUS 290 · | $2,051,619 | $1,998,096 | AUSTIN MATERIALS, LLC | -2.6% | 4 |
| Feb 6, 2020 | 0271-09-023STP 2020(594) | Waller Houston |
ADD 5 FT SHLDR, PLANING, LEVEL-UP AND 1.5 IN PFCUS 90 · | $2,161,424 | $1,784,542 | JAMES CONSTRUCTION GROUP, L.L.C. | -17.4% | 5 |
| Feb 6, 2020 | 0912-00-578STP 2020(597) | Harris Houston |
CONSTRUCTION OF TRAFFIC SIGNAL WORKVA · | $2,191,481 | $1,780,190 | VACA UNDERGROUND UTILITIES INC | -18.8% | 6 |
| Feb 6, 2020 | 0915-00-198STP 2020(558) | Bexar San Antonio |
DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FYVA · | $1,489,765 | $1,588,565 | THE LEVY COMPANY, INC. | +6.6% | 1 |
| Feb 6, 2020 | 6350-81-001RMC - 635081001 | Brown Brownwood |
MILL & INLAY (CALL-OUT)US 84 · | $1,983,783 | $1,576,677 | TEXAS MATERIALS GROUP, INC. | -20.5% | 5 |
| Feb 6, 2020 | 6353-84-001RMC - 635384001 | Caldwell Austin |
FULL DEPTH REPAIR AND SEAL COATFM 2001 · | $1,767,035 | $1,550,817 | LONE STAR PAVING COMPANY | -12.2% | 7 |
| Feb 6, 2020 | 6352-50-001RMC - 635250001 | Grayson Paris |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 69 · | $1,806,586 | $1,493,870 | A. K. GILLIS & SONS, INC. | -17.3% | 5 |
| Feb 6, 2020 | 0913-26-062BR 2018(904) | Colorado Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,335,782 | $1,385,690 | TREVWAY, INC. | +3.7% | 4 |
| Feb 6, 2020 | 0015-13-416NH 2020(586) | Travis Austin |
OVERLAYIH 35 · | $1,371,966 | $1,367,724 | AUSTIN MATERIALS, LLC | -0.3% | 4 |
| Feb 6, 2020 | 1422-01-009BR 2020(534) | Karnes Corpus Christi |
REPLACE BRIDGE AND APPROACHESFM 1354 · | $1,364,091 | $1,326,778 | HILL COUNTRY BRIDGE, INC. | -2.7% | 11 |
| Feb 6, 2020 | 0253-03-073NH 2020(556) | Comal San Antonio |
LANDSCAPE PLANTING AND IRRIGATIONUS 281 · | $1,468,369 | $1,299,000 | APEX LANDSCAPE & IRRIGATION, LLC | -11.5% | 6 |
| Feb 6, 2020 | 1606-01-035STP 2020(584) | Wise Fort Worth |
RESURFACE ROADWAYFM 1658 · | $1,120,910 | $1,052,232 | JAGOE-PUBLIC COMPANY | -6.1% | 3 |
| Feb 6, 2020 | 6343-63-001RMC - 634363001 | Brown Brownwood |
REPAIR,REPLACE AND/OR UPGRADE METAL BEAM GUARD FENUS 377 · | $1,209,271 | $965,442 | T&L CLEANING SERVICES LLC | -20.2% | 3 |
| Feb 6, 2020 | 1149-01-028STP 2020(547) | Travis Austin |
LEVEL UP, FDR AND OVERLAYFM 812 · | $1,102,943 | $931,784 | AUSTIN MATERIALS, LLC | -15.5% | 6 |
| Feb 6, 2020 | 6352-25-001RMC - 635225001 | Harris Houston |
FULL DEPTH CONC & ASPHALT REPAIRSH 249 · | $868,308 | $899,734 | MAIN LANE INDUSTRIES LTD. | +3.6% | 2 |
| Feb 6, 2020 | 6341-08-001RMC - 634108001 | Live Oak Corpus Christi |
NOVACHIPUS 59 · | $1,015,650 | $851,450 | ANGEL BROTHERS HOLDINGS CORP. | -16.2% | 3 |
| Feb 6, 2020 | 6354-49-001RMC - 635449001 | Wichita Wichita Falls |
ON-CALL CONCRETE AND PAVEMENT REPAIRUS 287 · | $829,350 | $839,711 | WINDING ROAD CONSTRUCTION, INC. | +1.2% | 2 |
| Feb 6, 2020 | 6339-17-001BPM - 633917001 | Taylor Abilene |
MISCELLANEOUS BRIDGE REPAIRIH 20 · | $856,371 | $798,994 | JAMES CONSTRUCTION GROUP, L.L.C. | -6.7% | 11 |
| Feb 6, 2020 | 6354-40-001RMC - 635440001 | Ellis Dallas |
ON-CALL TRAFFIC CONTROL SERVICESIH 45 · | $415,390 | $730,725 | TOTAL HIGHWAY MAINTENANCE, LLC | +75.9% | 2 |
| Feb 6, 2020 | 6352-26-001RMC - 635226001 | Harris Houston |
CLEANING AND SWEEPING HIGHWAYSIH 69 · | $885,292 | $722,402 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -18.4% | 3 |
| Feb 6, 2020 | 6355-30-001RMC - 635530001 | Archer Wichita Falls |
HOT-IN-PLACE RECYCLING OF ASPHALTUS 82 · | $798,221 | $712,560 | DUSTROL, INC. | -10.7% | 1 |
| Feb 6, 2020 | 6353-34-001RMC - 635334001 | El Paso El Paso |
ROADWAY SPALL & FULL DEPTH REPAIR ON CONCRETE PAVIH 10 · | $685,600 | $678,000 | LESNA CONSTRUCTION, INC. | -1.1% | 2 |
| Feb 6, 2020 | 6354-48-001RMC - 635448001 | Ellis Dallas |
VEGETATION MANAGEMENTIH 35E · | $547,766 | $547,590 | SHALOM SERVICES CORPORATION | 0.0% | 4 |
| Feb 6, 2020 | 6349-71-001RMC - 634971001 | Rusk Tyler |
TREE REMOVALSH 42 · | $513,150 | $489,250 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -4.7% | 4 |
| Feb 6, 2020 | 6355-17-001RMC - 635517001 | Tom Green San Angelo |
CLEANING AND SWEEPING OF HIGHWAYSUS 67 · | $367,980 | $454,068 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +23.4% | 1 |
| Feb 6, 2020 | 6351-44-001RMC - 635144001 | Montgomery Houston |
GUARDRAIL REPAIRIH 45 · | $445,958 | $439,490 | ROY JORGENSEN ASSOCIATES, INC. | -1.5% | 2 |
| Feb 6, 2020 | 6354-18-001RMC - 635418001 | Bell Waco |
CLEANING AND SWEEPINGUS 190 · | $550,598 | $411,184 | EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC | -25.3% | 3 |
| Feb 6, 2020 | 6353-33-001RMC - 635333001 | El Paso El Paso |
BARRICADES, SIGNS AND TRAFFIC CONTROLIH 10 · | $416,250 | $373,710 | LESNA CONSTRUCTION, INC. | -10.2% | 3 |
| Feb 6, 2020 | 6356-80-001RMC - 635680001 | Brewster El Paso |
MOWING HIGHWAY RIGHT-OF-WAYUS 90 · | $442,500 | $330,501 | L&L COMPANY | -25.3% | 2 |
| Feb 6, 2020 | 6351-03-001RMC - 635103001 | Wichita Wichita Falls |
FRICTIONAL ASPHALT SURFACE PRESERVATION TRTMTUS 281 · | $314,266 | $305,843 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | -2.7% | 1 |
| Feb 6, 2020 | 0211-10-046STP 2020(563)HES | Colorado Yoakum |
INSTALL LED FLASHING CHEVRON(CURVE)FM 155 · | $190,600 | $173,450 | VACA UNDERGROUND UTILITIES INC | -9.0% | 6 |
| Feb 6, 2020 | 1003-01-096STP 2020(598)HES | Brazoria Houston |
INSTALL LED FLASHING CHEVRONS (CURVE)FM 523 · | $305,797 | $150,250 | VACA UNDERGROUND UTILITIES INC | -50.9% | 6 |
1–100 of 101Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.