116Let jobs
$263,273,621Total low bids
$310,384,460Total estimates
-15.2%Low bids vs estimates
Feb 2018 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 28, 2018 | 6327-68-001RMC - 632768001 | Angelina Lufkin |
MOWING RIGHT-OF-WAY AND LITTER REMOVALUS 59 · | $203,904 | $280,012 | ACE CONTRACTORS, INC. | +37.3% | 3 |
| Feb 28, 2018 | 6327-58-001RMC - 632758001 | Nacogdoches Lufkin |
MOWING RIGHT-OF-WAY AND LITTER REMOVALUS 59 · | $212,956 | $199,638 | SG COMPANY | -6.3% | 3 |
| Feb 28, 2018 | 6327-59-001RMC - 632759001 | San Augustine Lufkin |
MOWING RIGHT-OF-WAY AND LITTER REMOVALSH 147 · | $135,207 | $177,839 | P-VILLE, INCORPORATED | +31.5% | 2 |
| Feb 28, 2018 | 6327-57-001RMC - 632757001 | Trinity Lufkin |
MOWING RIGHT-OF-WAY AND LITTER REMOVALSH 94 · | $117,491 | $110,477 | DON YATES, INC. | -6.0% | 4 |
| Feb 23, 2018 | 6320-81-001RMC - 632081001 | Matagorda Yoakum |
INSTALLATION OF TRAFFIC SIGNALSH 35 · | $191,119 | $170,273 | THIRD COAST SERVICES LLC | -10.9% | 3 |
| Feb 22, 2018 | 6321-75-001RMC - 632175001 | Culberson El Paso |
MOWING HIGHWAY RIGHT OF WAYIH 10 · | $264,900 | $301,201 | L&L COMPANY | +13.7% | 1 |
| Feb 21, 2018 | 6325-35-001RMC - 632535001 | Bowie Atlanta |
INSTALLATION OF OVERHEAD SIGN SUPPORTSIH 30 · | $82,829 | $103,696 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +25.2% | 3 |
| Feb 21, 2018 | 6324-99-001RMC - 632499001 | Potter Amarillo |
INSTALLATION OF RAISED PAVEMENT MARKERSUS 287 · | $80,499 | $76,383 | BRYDL CONTRACTING, INC. | -5.1% | 5 |
| Feb 20, 2018 | 6326-85-001RMC - 632685001 | Travis Austin |
REFLECTORIZED PAVEMENT MARKINGS/MARKERSUS 290 · | $289,840 | $263,975 | REPUBLIC TRAFFIC SAFETY, INC. | -8.9% | 4 |
| Feb 15, 2018 | 6325-39-001RMC - 632539001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)IH 69 · | $252,327 | $225,445 | PMI PAVEMENT MARKING, INC. | -10.7% | 5 |
| Feb 15, 2018 | 6326-28-001RMC - 632628001 | Baylor Wichita Falls |
RIGHT OF WAY MOWINGUS 183 · | $184,832 | $201,010 | CROSS PLUS CONSTRUCTION, LLC | +8.8% | 3 |
| Feb 15, 2018 | 6326-67-001RMC - 632667001 | Harris Houston |
ASPHALT AND POTHOLE REPAIRSH 6 · | $182,900 | $181,750 | FORDE CONSTRUCTION COMPANY, INC. | -0.6% | 2 |
| Feb 15, 2018 | 6326-74-001RMC - 632674001 | Brazoria Houston |
VARIOUS BRIDGES IN BRAZORIA COUNTYSH 35 · | $118,865 | $110,308 | NEW BRAUNFELS CONTRACTING, LLC | -7.2% | 8 |
| Feb 13, 2018 | 6315-35-001RMC - 631535001 | Tarrant Fort Worth |
CALL-OUT STRIPING & PREFAB HANDWORKIH 820 · | $256,525 | $218,354 | TRP CONSTRUCTION GROUP, LLC | -14.9% | 4 |
| Feb 13, 2018 | 6326-86-001RMC - 632686001 | Bell Waco |
BRIDGE AND CULVERT REPAIRSUS 190 · | $144,419 | $162,978 | CROSS PLUS CONSTRUCTION, LLC | +12.9% | 5 |
| Feb 13, 2018 | 6324-16-001RMC - 632416001 | Bell Waco |
MEASURING RETROREFLECTIVITY DISTRICTWIDESH 317 · | $33,482 | $35,446 | STRIPE-A-ZONE, INC. | +5.9% | 5 |
| Feb 6, 2018 | 6326-87-001RMC - 632687001 | Anderson Tyler |
BRIDGE PREVENTIVE MAINTENANCEUS 287 · | $226,575 | $232,133 | RED BARON BUILDING COMPANY, L.L.C. | +2.5% | 10 |
| Feb 6, 2018 | 6318-12-001BPM - 631812001 | Gregg Tyler |
BRIDGE PREVENTIVE MAINTENANCESH 42 · | $262,080 | $210,592 | CHAMPION INFRASTRUCTURE, LLC | -19.6% | 11 |
| Feb 6, 2018 | 6319-93-001RMC - 631993001 | Freestone Bryan |
ROADSIDE MOWINGSH 75 · | $154,494 | $180,932 | LAWRENCE W. SIMS | +17.1% | 3 |
| Feb 6, 2018 | 6327-61-001RMC - 632761001 | Winkler Odessa |
ROADSIDE MOWINGSH 302 · | $136,436 | $172,028 | CM COMPANY | +26.1% | 2 |
| Feb 6, 2018 | 6318-13-001BPM - 631813001 | Gregg Tyler |
BRIDGE PREVENTIVE MAINTENANCEUS 259 · | $196,635 | $167,860 | RED BARON BUILDING COMPANY, L.L.C. | -14.6% | 12 |
| Feb 6, 2018 | 6318-11-001BPM - 631811001 | Anderson Tyler |
BRIDGE PREVENTIVE MAINTENANCESH 19 · | $146,502 | $129,538 | L.C. JORDAN & SON | -11.6% | 9 |
| Feb 2, 2018 | 0169-05-042NH 2013(614) | Carson Amarillo |
REHAB EXISTING ROADWAYUS 60 · | $12,655,032 | $10,873,603 | RK HALL, LLC | -14.1% | 6 |
| Feb 2, 2018 | 0088-05-091NH 2018(506) | Victoria Yoakum |
ACP OVERLAYUS 59 · | $8,977,357 | $9,267,867 | HUNTER INDUSTRIES, LTD. | +3.2% | 2 |
| Feb 2, 2018 | 0499-03-058STP 2018(565)HES | Orange Beaumont |
INST CONT TURN LANE & RUMBLE STRIPSSH 12 · | $7,685,430 | $6,632,538 | OLDCASTLE MATERIALS TEXAS, INC. | -13.7% | 4 |
| Feb 2, 2018 | 0157-02-047NH 2018(624) | Knox Childress |
ASPHALTIC CONCRETE PAVEMENT OVERLAYUS 277 · | $6,922,868 | $6,559,485 | ZACK BURKETT CO. | -5.2% | 4 |
| Feb 2, 2018 | 0035-07-043STP 2018(679) | Kimble San Angelo |
ADD PASSING LANESUS 83 · | $6,070,341 | $5,713,900 | ALLEN KELLER COMPANY | -5.9% | 5 |
| Feb 2, 2018 | 0408-02-046BR 2018(508) | Austin Yoakum |
REPLACE BRIDGE AND APPROACHESSH 159 · | $4,363,073 | $3,793,060 | ANGEL BROTHERS HOLDINGS CORP. | -13.1% | 10 |
| Feb 2, 2018 | 0127-02-141STP 2018(542) | Eastland Brownwood |
ADD PASSING LANESUS 183 · | $4,198,880 | $3,673,746 | RAY FARIS, INC. | -12.5% | 6 |
| Feb 2, 2018 | 1309-01-033NH 2018(538) | Jack Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKUS 380 · | $4,137,119 | $3,522,043 | THE LANE CONSTRUCTION CORPORATION | -14.9% | 9 |
| Feb 2, 2018 | 0774-03-014STP 2018(544) | Hamilton Waco |
WDN, GR, SURF, ADD SHLDRSFM 1602 · | $3,674,163 | $3,288,709 | OLDCASTLE MATERIALS TEXAS, INC. | -10.5% | 7 |
| Feb 2, 2018 | 0143-03-044NH 2018(530) | Wilson San Antonio |
REHABITITATE EXISTING ROADWAYUS 87 · | $4,005,997 | $2,913,595 | HUNTER INDUSTRIES, LTD. | -27.3% | 9 |
| Feb 2, 2018 | 0164-03-053NH 2018(514) | Henderson Tyler |
BS RPR,PLNG,SUPRPVE,OCST,PFC,MBGF,SGNS,PV MKSH 31 · | $3,432,034 | $2,687,805 | BIG CREEK CONSTRUCTION, LTD. | -21.7% | 7 |
| Feb 2, 2018 | 0521-05-145NH 2018(533) | Bexar San Antonio |
OVERLAY & PAVEMENT MARKING ON FRONTAGE ROADIH 410 · | $3,125,053 | $2,494,814 | ANGEL BROTHERS HOLDINGS CORP. | -20.2% | 8 |
| Feb 2, 2018 | 0495-07-075NH 2018(516) | Gregg Tyler |
TBPFC & ACP SURF,PLNG,MBGF,SHLD TXT,PV MKIH 20 · | $2,937,496 | $2,447,524 | MADDEN CONTRACTING COMPANY, LLC. | -16.7% | 2 |
| Feb 2, 2018 | 0976-01-039NH 2018(562) | Harris Houston |
BS REP,MILL,O/L,STRIPING,CURB/SIDEWALK REPL W/TSFM 865 · | $3,371,469 | $2,411,706 | ANGEL BROTHERS HOLDINGS CORP. | -28.5% | 2 |
| Feb 2, 2018 | 0769-01-028STP 2018(512) | Lamar Paris |
REHABILITATION OF EXISTING ROADFM 197 · | $2,758,638 | $2,376,096 | FRITCHER CONSTRUCTION SERVICES | -13.9% | 6 |
| Feb 2, 2018 | 2405-01-012STP 2018(558) | Clay Wichita Falls |
REHABILITATION OF EXISTING ROADFM 2393 · | $2,648,384 | $2,307,479 | A. L. HELMCAMP, INC. | -12.9% | 5 |
| Feb 2, 2018 | 0850-04-027STP 2018(534) | Wilson San Antonio |
MILL, OVERLAY, PAV MARKS, RECON FM 3432 INTFM 775 · | $3,493,740 | $2,096,268 | HUNTER INDUSTRIES, LTD. | -40.0% | 9 |
| Feb 2, 2018 | 0798-01-025BR 2018(223) | Roberts |
REPLACE EXISTING BRIDGE AND APPROACHESFM 282 · | $2,395,205 | $2,093,932 | STATELINE CONSTRUCTION, LLC | -12.6% | 8 |
| Feb 2, 2018 | 0008-03-107NH 2018(537) | Parker Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKIH 20 · | $2,748,303 | $2,047,763 | NORTHEASTERN PAVERS, INC. | -25.5% | 8 |
| Feb 2, 2018 | 6326-45-001RMC - 632645001 | Frio San Antonio |
PAV MARKINGS & MRKRS CENTERLINE TEXTUREIH 35 · | $1,992,582 | $1,813,511 | PAVEMENT MARKINGS INC. | -9.0% | 4 |
| Feb 2, 2018 | 0909-00-049STP 2018(546) | McLennan Waco |
CNSTR CURB RMPSVA · | $2,089,094 | $1,647,633 | TI-ZACK CONCRETE, INC. | -21.1% | 6 |
| Feb 2, 2018 | 0005-06-120NH 2018(548) | Howard Abilene |
INSTALL PAVEMENT MARKINGSIH 20 · | $1,865,714 | $1,637,145 | FLAT LINE, INC. | -12.3% | 6 |
| Feb 2, 2018 | 0915-00-181STP 2018(318) | Bexar San Antonio |
DISTRICTWIDE TRAFFIC CONTROL DEVICEVA · | $1,464,396 | $1,424,652 | THE LEVY COMPANY, INC. | -2.7% | 3 |
| Feb 2, 2018 | 1200-01-027STP 2018(599) | Williamson Austin |
ONE COURSE SURFACE TREATMENTFM 973 · | $1,213,301 | $1,408,398 | HUNTER INDUSTRIES, LTD. | +16.1% | 6 |
| Feb 2, 2018 | 6325-04-001RMC - 632504001 | Gregg Tyler |
MILL AND INLAYSL 281 · | $1,590,547 | $1,295,635 | EAST TEXAS BRIDGE, INC. | -18.5% | 4 |
| Feb 2, 2018 | 0834-04-024STP 2017(896)HES | McLennan Waco |
SFTY TR FX OBJSFM 308 · | $1,332,902 | $1,258,844 | CDM HOLDINGS, LLC | -5.6% | 8 |
| Feb 2, 2018 | 0114-20-011STP 2018(529) | Travis Austin |
MILL AND INLAYSL 212 · | $1,396,812 | $1,158,086 | LONE STAR PAVING COMPANY | -17.1% | 5 |
| Feb 2, 2018 | 0039-12-058STP 2018(523)HES | Cameron Pharr |
INSTALL INTERSECT. FLASHING BEACONS, SAFETY LIGHTSBU 77-X · | $1,217,817 | $1,094,325 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -10.1% | 4 |
| Feb 2, 2018 | 6322-91-001RMC - 632291001 | Orange Beaumont |
OVERLAY ROADWAYSH 62 · | $1,250,054 | $999,987 | OLDCASTLE MATERIALS TEXAS, INC. | -20.0% | 5 |
| Feb 2, 2018 | 3330-01-010STP 2018(559) | McLennan Waco |
SEAL/OVLYFM 3223 · | $1,141,780 | $845,728 | KNIFE RIVER CORPORATION - SOUTH | -25.9% | 4 |
| Feb 2, 2018 | 0048-03-091STP 2018(541) | Ellis Dallas |
BASE REPAIR AND OVERLAYUS 77 · | $1,201,395 | $829,774 | KNIFE RIVER CORPORATION - SOUTH | -30.9% | 8 |
| Feb 2, 2018 | 1258-02-037STP 2018(564) | Fort Bend Houston |
BASE REPAIR AND OVERLAYFM 1093 · | $950,790 | $781,727 | JAMES CONSTRUCTION GROUP, L.L.C. | -17.8% | 4 |
| Feb 2, 2018 | 6327-63-001RMC - 632763001 | Wichita Wichita Falls |
ONCALL CONCRETE PAVEMENT REPAIRUS 82 · | $776,440 | $777,111 | WINDING ROAD CONSTRUCTION, INC. | +0.1% | 3 |
| Feb 2, 2018 | 6324-25-001RMC - 632425001 | Denton Dallas |
VEGETATION MANAGEMENTIH 35W · | $778,050 | $768,536 | CROSS PLUS CONSTRUCTION, LLC | -1.2% | 2 |
| Feb 2, 2018 | 6309-77-001RMC - 630977001 | Harris Houston |
BRIDGE REPAIRSIH 610 · | $392,173 | $738,450 | ISI CONTRACTING, INC. | +88.3% | 3 |
| Feb 2, 2018 | 0053-12-064STP 2018(550)HESG | Nolan Abilene |
HIGH FRICTION SURFACE TREATMENT (CUUS 84 · | $941,768 | $597,597 | THE TRUESDELL CORPORATION | -36.5% | 7 |
| Feb 2, 2018 | 6324-98-001BPM - 632498001 | Childress Childress |
2018 BPM PROJECTUS 287 · | $609,882 | $553,766 | CDM HOLDINGS, LLC | -9.2% | 10 |
| Feb 2, 2018 | 6323-25-001RMC - 632325001 | Dallas Dallas |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 30 · | $571,082 | $514,508 | PMI PAVEMENT MARKING, INC. | -9.9% | 4 |
| Feb 2, 2018 | 0904-00-180STP 2018(521) | Potter Amarillo |
THERMOPLASTIC STRIPINGVA · | $635,882 | $482,197 | L&L COMPANY | -24.2% | 7 |
| Feb 2, 2018 | 6325-70-001RMC - 632570001 | Starr Pharr |
CLEANING AND SWEEPING OF HIGHWAYSUS 83 · | $562,590 | $450,285 | CTX SPECIAL SERVICES CO LLC | -20.0% | 4 |
| Feb 2, 2018 | 6323-89-001RMC - 632389001 | Navarro Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAYFM 639 · | $1,050,107 | $397,396 | KNIFE RIVER CORPORATION - SOUTH | -62.2% | 6 |
| Feb 2, 2018 | 6298-24-001RMC - 629824001 | Mills Brownwood |
MILLING ASPHALT PAVEMENT TO IMPROVE RIDE/DRAINAGESH 16 · | $519,664 | $385,345 | DUSTROL, INC. | -25.8% | 4 |
| Feb 2, 2018 | 2350-01-059NH 2018(567) | Victoria Yoakum |
CONSTRUCT TRAFFIC SIGNALUS 77 · | $321,280 | $335,633 | THIRD COAST SERVICES LLC | +4.5% | 4 |
| Feb 2, 2018 | 6325-73-001RMC - 632573001 | Hunt Paris |
INSTALL TRAFFIC SIGNALFM 1570 · | $326,840 | $327,380 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | +0.2% | 3 |
| Feb 2, 2018 | 6318-48-001BPM - 631848001 | Harris Houston |
REPLACE/RESET BEARING PADSIH 45 · | $614,196 | $325,600 | SCR CIVIL CONSTRUCTION, LLC | -47.0% | 4 |
| Feb 2, 2018 | 6324-88-001RMC - 632488001 | Wise Fort Worth |
THERMOPLASTIC STRIPING AND HANDWORKUS 81 · | $366,363 | $309,193 | FLAT LINE, INC. | -15.6% | 4 |
| Feb 2, 2018 | 0109-06-041STP 2018(681)HES | Houston Lufkin |
MILLED EDGELINE/CENTERLINE RUMBLE STRIPSSH 19 · | $351,902 | $294,820 | STRIPE-A-ZONE, INC. | -16.2% | 4 |
| Feb 2, 2018 | 6325-63-001RMC - 632563001 | Hays Austin |
REPLACE CULVERT STRUCTURESH 21 · | $339,883 | $260,107 | DAN WILLIAMS COMPANY | -23.5% | 10 |
| Feb 2, 2018 | 6326-11-001RMC - 632611001 | Galveston Houston |
REFLECTIVE PAVEMENT MARKERS (GRAPHICS)SH 146 · | $305,344 | $247,184 | PMI PAVEMENT MARKING, INC. | -19.0% | 6 |
| Feb 2, 2018 | 0200-01-089STP 2018(520)HES | Angelina Lufkin |
INSTALL TRAFFIC SIGNALUS 69 · | $159,645 | $164,665 | THIRD COAST SERVICES LLC | +3.1% | 3 |
| Feb 2, 2018 | 0374-05-027BR 2018(524) | Hudspeth El Paso |
BOX CULVERT STRUCTURAL REPAIRUS 62 · | $70,981 | $54,568 | E. G. L. CONSTRUCTION, INC. | -23.1% | 6 |
| Feb 1, 2018 | 2266-02-086NH 2018(456) | Tarrant Fort Worth |
WIDEN & RECONSTRUCT 6 TO 8 LANESSH 360 · | $60,122,553 | $53,391,000 | FLUOR HEAVY CIVIL, LLC | -11.2% | 7 |
| Feb 1, 2018 | 0055-08-099NH 2018(346) | McLennan Waco |
GR, STRS & SURFUS 84 · | $27,609,767 | $20,587,595 | BIG CREEK CONSTRUCTION, LTD. | -25.4% | 8 |
| Feb 1, 2018 | 0548-05-049STP 2018(680) | Andrews Odessa |
RECONSTRUCT AND WIDENSH 176 · | $13,655,435 | $11,368,798 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -16.7% | 7 |
| Feb 1, 2018 | 0142-05-080STP 2013(719) | Kerr San Antonio |
WIDEN RDWY TO PROVIDE PASS LN & OPERATIONAL IMPROVSH 27 · | $12,170,490 | $8,690,980 | ANGEL BROTHERS HOLDINGS CORP. | -28.6% | 8 |
| Feb 1, 2018 | 1385-02-024NH 2018(517) | Gregg Tyler |
BS RPR,OCST,PFC,HMAC,STRS,PV MKSH 300 · | $7,852,366 | $6,613,692 | MADDEN CONTRACTING COMPANY, LLC. | -15.8% | 4 |
| Feb 1, 2018 | 0211-02-026NH 2018(531) | Lee Austin |
LEVEL-UP, FULL DEPTH REPAIR AND TOMUS 77 · | $7,209,200 | $5,387,886 | BIG CREEK CONSTRUCTION, LTD. | -25.3% | 7 |
| Feb 1, 2018 | 0593-01-120STP 2018(566)HES | Liberty Beaumont |
INSTALL TURN LANE, PASSING LANES & RUMBLE STRIPSSH 321 · | $6,053,524 | $5,234,742 | ANGEL BROTHERS HOLDINGS CORP. | -13.5% | 4 |
| Feb 1, 2018 | 6324-93-001RMC - 632493001 | Lamar Paris |
ON CALL MILL & INLAYUS 82 · | $5,039,828 | $4,350,178 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | -13.7% | 2 |
| Feb 1, 2018 | 0053-12-065NH 2018(551) | Nolan Abilene |
ROADWAY REHABILITATION / ARMORINGUS 84 · | $3,418,805 | $3,160,245 | REECE ALBERT, INC. | -7.6% | 8 |
| Feb 1, 2018 | 0905-00-073STP 2018(560) | Lubbock Lubbock |
PAVEMENT MARKERSVA · | $4,019,820 | $2,938,105 | L&L COMPANY | -26.9% | 5 |
| Feb 1, 2018 | 0435-01-073STP 2018(511) | Lamar Paris |
REHABILITATION OF EXISTING ROADFM 38 · | $2,235,988 | $2,447,925 | A. K. GILLIS & SONS, INC. | +9.5% | 4 |
| Feb 1, 2018 | 0377-01-048STP 2018(515) | Gregg Tyler |
PLNG,CAM,HARST,SUPRPVE,BRG RL,MBGF,PV MKSH 135 · | $2,707,390 | $2,405,352 | MADDEN CONTRACTING COMPANY, LLC. | -11.2% | 4 |
| Feb 1, 2018 | 0901-00-054STP 2018(513) | Lamar Paris |
CONSTRUCT CURB RAMPSVA · | $2,483,646 | $2,370,334 | TI-ZACK CONCRETE, INC. | -4.6% | 8 |
| Feb 1, 2018 | 0045-01-061NH 2018(556) | Cooke Wichita Falls |
PAVEMENT REPAIR, SEAL AND PFC OVERLAY (EB ONLY)US 82 · | $2,159,327 | $2,124,212 | JAGOE-PUBLIC COMPANY | -1.6% | 7 |
| Feb 1, 2018 | 1012-03-018BR 2018(683) | Collin Dallas |
REPLACE BRIDGE AND APPROACHESFM 981 · | $2,694,986 | $1,885,537 | L & N BRIDGE, LLC | -30.0% | 18 |
| Feb 1, 2018 | 0059-03-020STP 2018(519) | Shelby Lufkin |
OVERLAY WITH PFCSH 7 · | $2,052,709 | $1,821,664 | MOORE BROTHERS CONSTRUCTION COMPANY | -11.3% | 3 |
| Feb 1, 2018 | 0006-11-022STP 2018(554)HESG | Callahan Abilene |
PROFILE EDGELINE MARKINGSFM 18 · | $2,250,625 | $1,810,775 | SURFACE PREPARATION TECHNOLOGIES, LLC | -19.5% | 4 |
| Feb 1, 2018 | 0173-03-040STP 2018(536) | Kaufman Dallas |
HMAC OV AND SPOT BASE REPAIRSH 34 · | $2,154,454 | $1,757,484 | IOC COMPANY LLC | -18.4% | 8 |
| Feb 1, 2018 | 0192-03-017NH 2018(561) | Brazoria Houston |
PAVMT REPAIR AND ACP OVERLAYSH 6 · | $1,859,206 | $1,534,309 | ANGEL BROTHERS HOLDINGS CORP. | -17.5% | 3 |
| Feb 1, 2018 | 0904-13-024BR 1702(577) | Gray Amarillo |
REPLACE BRIDGE AND APPROACHESCR · | $1,501,586 | $1,525,326 | STATELINE CONSTRUCTION, LLC | +1.6% | 6 |
| Feb 1, 2018 | 6323-38-001RMC - 632338001 | Dallas Dallas |
GUARD FENCE & CABLE REPAIRSL 12 · | $1,603,110 | $1,441,010 | FIREMAN EXCAVATING, INC. | -10.1% | 3 |
| Feb 1, 2018 | 6325-66-001RMC - 632566001 | Hunt Paris |
SITE SPECIFIC TY I STRIPINGIH 30 · | $1,275,437 | $1,259,149 | STRIPE-A-ZONE, INC. | -1.3% | 4 |
| Feb 1, 2018 | 0042-06-071NH 2018(543) | Donley Childress |
MISCELLANEOUS WORKUS 287 · | $996,586 | $1,185,395 | GILVIN-TERRILL, LTD. | +18.9% | 5 |
| Feb 1, 2018 | 0239-02-037STP 2018(557) | Montague Wichita Falls |
PAVEMENT REPAIR AND OVERLAYSH 59 · | $1,183,139 | $1,182,794 | THE LANE CONSTRUCTION CORPORATION | 0.0% | 5 |
| Feb 1, 2018 | 6323-03-001RMC - 632303001 | Brazos Bryan |
FLAGGING AND TRAFFIC CONTROLSH 6 · | $2,140,281 | $1,078,339 | AREA WIDE PROTECTIVE, INC. | -49.6% | 4 |
| Feb 1, 2018 | 1594-02-012BR 2018(547) | Coryell Waco |
REPLACE BRIDGE AND APPROACHESFM 1783 · | $1,116,439 | $1,048,921 | KNIFE RIVER CORPORATION - SOUTH | -6.0% | 8 |
| Feb 1, 2018 | 6320-56-001RMC - 632056001 | Liberty Beaumont |
MILL AND OVERLAYSL 227 · | $1,165,084 | $1,042,371 | ANGEL BROTHERS HOLDINGS CORP. | -10.5% | 5 |
1–100 of 116Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.