| 1 | 100-6002 |
PREPARING ROW | 218 | STA |
$665.00 |
$180.00 |
$180.00 |
$1,354.00 |
|
| 2 | 105-6008 |
REMOVING STAB BASE AND ASPH PAV (6") | 21,516 | SY |
$4.30 |
$1.27 |
$10.00 |
$11.50 |
|
| 3 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 90 | STA |
$200.00 |
$234.58 |
$250.00 |
$336.00 |
|
| 4 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 20 | CY |
$26.00 |
$183.75 |
$50.00 |
$75.00 |
|
| 5 | 134-6001 |
BACKFILL (TY A) | 219 | STA |
$200.00 |
$337.41 |
$450.00 |
$402.00 |
|
| 6 | 152-6001 |
ROAD GRADER WORK (ORD COMP) | 219 | STA |
$225.00 |
$241.00 |
$250.00 |
$456.00 |
|
| 7 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 38,687 | SY |
$0.1100 |
$0.0400 |
$0.0400 |
$0.0400 |
|
| 8 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 38,687 | SY |
$0.1300 |
$0.0600 |
$0.0600 |
$0.0600 |
|
| 9 | 164-6015 |
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) | 77,373 | SY |
$0.2500 |
$0.2000 |
$0.2000 |
$0.2000 |
|
| 10 | 168-6001 |
VEGETATIVE WATERING | 1,393 | MG |
$11.25 |
$3.85 |
$10.00 |
$22.00 |
|
| 11 | 216-6001 |
PROOF ROLLING | 21.75 | HR |
$60.00 |
$107.24 |
$50.00 |
$75.00 |
|
| 12 | 247-6096 |
FL BS (CMP IN PLC)(TY D GR 4) | 250 | TON |
$100.00 |
$45.95 |
$100.00 |
$35.00 |
|
| 13 | 247-6248 |
FL BS (CMP IN PL)(TY D GR 4)(8") | 23,360 | SY |
$11.05 |
$10.77 |
$12.65 |
$20.15 |
|
| 14 | 310-6012 |
PRIME COAT (RC-250) | 6,540 | GAL |
$4.45 |
$4.49 |
$4.50 |
$12.00 |
|
| 15 | 316-6017 |
ASPH (AC-20-5TR) | 36,855 | GAL |
$4.20 |
$3.70 |
$3.50 |
$6.00 |
|
| 16 | 316-6126 |
AGGR(TY-PB GR-4 SAC-A) | 496 | CY |
$106.00 |
$148.36 |
$150.00 |
$185.00 |
|
| 17 | 316-6173 |
AGGR(TY-B GR-3 SAC-B) | 321 | CY |
$95.00 |
$108.54 |
$130.00 |
$155.00 |
|
| 18 | 316-6177 |
AGGR(TY-B GR-5 SAC-B) | 165 | CY |
$93.50 |
$140.02 |
$100.00 |
$155.00 |
|
| 19 | 340-6011 |
D-GR HMA(SQ) TY-B PG64-22 | 4,341 | TON |
$87.00 |
$106.59 |
$120.00 |
$79.00 |
|
| 20 | 340-6175 |
D-GR HMA(SQ) TY-F SAC-A PG64-22 | 1,210 | TON |
$115.00 |
$171.49 |
$160.00 |
$94.00 |
|
| 21 | 351-6017 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(20") | 2,000 | SY |
$65.00 |
$135.32 |
$160.00 |
$163.59 |
|
| 22 | 354-6030 |
PLANE ASPH CONC PAV(0" TO 8") | 9,330 | SY |
$4.75 |
$3.03 |
$10.00 |
$5.10 |
|
| 23 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 26 | CY |
$215.00 |
$96.38 |
$180.00 |
$220.00 |
|
| 24 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 161 | CY |
$480.00 |
$400.00 |
$400.00 |
$275.00 |
|
| 25 | 500-6001 |
MOBILIZATION | 1 | LS |
$196,866.45 |
$256,700.00 |
$250,000.00 |
$178,000.00 |
|
| 26 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$5,000.00 |
$3,800.00 |
$2,500.00 |
$7,499.08 |
|
| 27 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 480 | LF |
$26.00 |
$35.00 |
$35.00 |
$35.00 |
|
| 28 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 480 | LF |
$9.25 |
$8.00 |
$8.00 |
$8.00 |
|
| 29 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 6,315 | LF |
$2.80 |
$2.50 |
$2.50 |
$2.50 |
|
| 30 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 6,315 | LF |
$1.10 |
$1.00 |
$1.00 |
$1.00 |
|
| 31 | 530-6005 |
DRIVEWAYS (ACP) | 863 | SY |
$30.00 |
$31.75 |
$35.00 |
$57.00 |
|
| 32 | 530-6008 |
TURNOUTS (ACP) | 740 | SY |
$45.00 |
$82.49 |
$75.00 |
$59.00 |
|
| 33 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 800 | LF |
$24.00 |
$17.00 |
$17.00 |
$17.00 |
|
| 34 | 540-6009 |
MTL BEAM GD FEN TRANS (T6) | 8 | EA |
$1,300.00 |
$525.00 |
$525.00 |
$535.00 |
|
| 35 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,050 | LF |
$3.50 |
$2.00 |
$2.00 |
$2.00 |
|
| 36 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 10 | EA |
$180.00 |
$200.00 |
$200.00 |
$200.00 |
|
| 37 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 10 | EA |
$2,350.00 |
$2,050.00 |
$2,500.00 |
$2,050.00 |
|
| 38 | 544-6002 |
GUARDRAIL END TREATMENT (MOVE & RESET) | 2 | EA |
$1,000.00 |
$1,100.00 |
$1,100.00 |
$1,100.00 |
|
| 39 | 560-6014 |
MAILBOX INSTALL-S (TWG-POST) TY 4 | 18 | EA |
$285.00 |
$245.00 |
$250.00 |
$212.00 |
|
| 40 | 560-6022 |
MAILBOX INSTALL-D (TWG-POST) TY 4 | 1 | EA |
$300.00 |
$280.00 |
$300.00 |
$302.00 |
|
| 41 | 560-6023 |
MAILBOX INSTALL-M (TWG-POST) TY 4 | 3 | EA |
$375.00 |
$425.00 |
$500.00 |
$550.00 |
|
| 42 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 3 | EA |
$450.00 |
$675.00 |
$700.00 |
$622.00 |
|
| 43 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 1 | EA |
$580.00 |
$825.00 |
$800.00 |
$747.00 |
|
| 44 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 1 | EA |
$710.00 |
$375.00 |
$900.00 |
$1,002.00 |
|
| 45 | 644-6076 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$75.00 |
$360.00 |
$400.00 |
$3,000.00 |
|
| 46 | 658-6016 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | 36 | EA |
$50.00 |
$24.00 |
$40.00 |
$24.00 |
|
| 47 | 662-6032 |
WK ZN PAV MRK NON-REMOV (Y)4"(BRK) | 2,600 | LF |
$0.2000 |
$0.2500 |
$0.4000 |
$0.2500 |
|
| 48 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 30,402 | LF |
$0.2000 |
$0.2500 |
$0.4000 |
$0.2500 |
|
| 49 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,428.1 | EA |
$1.00 |
$2.11 |
$1.00 |
$3.00 |
|
| 50 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 432 | LF |
$0.7500 |
$0.8100 |
$1.00 |
$0.8100 |
|
| 51 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 249 | LF |
$5.50 |
$5.90 |
$6.00 |
$5.90 |
|
| 52 | 666-6102 |
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) | 19 | EA |
$30.00 |
$65.00 |
$42.00 |
$65.00 |
|
| 53 | 666-6342 |
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) | 44,118 | LF |
$0.5500 |
$0.6400 |
$1.00 |
$0.6400 |
|
| 54 | 666-6344 |
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) | 2,600 | LF |
$0.5500 |
$0.8000 |
$1.50 |
$0.8000 |
|
| 55 | 666-6345 |
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) | 30,402 | LF |
$0.5500 |
$0.6400 |
$1.00 |
$0.6400 |
|
| 56 | 672-6007 |
REFL PAV MRKR TY I-C | 22 | EA |
$2.75 |
$5.00 |
$3.60 |
$5.00 |
|
| 57 | 672-6009 |
REFL PAV MRKR TY II-A-A | 566 | EA |
$3.00 |
$3.00 |
$4.00 |
$3.00 |
|
| 58 | 5001-6002 |
GEOGRID BASE REINFORCEMENT (TY II) | 23,360 | SY |
$1.58 |
$2.76 |
$2.00 |
$2.52 |
|