| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$11,880.00 |
$5,000.00 |
$5,000.00 |
$10,212.50 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,388 | CY |
$12.00 |
$6.50 |
$9.88 |
$9.50 |
$8.00 |
$6.19 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$20.00 |
$20.00 |
$16.20 |
$15.00 |
$8.00 |
$22.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$4,000.00 |
$5,940.00 |
$7,000.00 |
$2,800.00 |
$7,392.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 150 | LF |
$2.00 |
$5.00 |
$10.68 |
$2.50 |
$9.89 |
$13.60 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 21 | CY |
$100.00 |
$100.00 |
$100.00 |
$40.00 |
$125.00 |
$96.25 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 63 | CY |
$110.00 |
$100.00 |
$110.00 |
$40.00 |
$125.00 |
$96.25 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 4,226 | SY |
$3.50 |
$3.00 |
$5.28 |
$5.50 |
$4.89 |
$6.72 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.87 | AC |
$800.00 |
$500.00 |
$5,238.00 |
$5,000.00 |
$4,850.00 |
$6,668.75 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 737.06 | CY |
$65.00 |
$70.00 |
$64.80 |
$58.00 |
$80.00 |
$37.82 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,550.46 | TON |
$30.00 |
$23.00 |
$32.40 |
$38.00 |
$40.00 |
$37.82 |
| 12 | 408 5774 |
PRIME COAT | 1,501.14 | GAL |
$5.75 |
$4.00 |
$8.64 |
$7.25 |
$10.00 |
$8.94 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$600.00 |
$350.00 |
$275.00 |
$430.00 |
$350.00 |
$344.14 |
| 14 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 56 | LF |
$130.00 |
$85.00 |
$124.20 |
$110.00 |
$105.00 |
$211.12 |
| 15 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,000.00 |
$700.00 |
$2,538.00 |
$2,500.00 |
$1,800.00 |
$3,217.50 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$4,320.00 |
$5,000.00 |
$4,000.00 |
$17,125.00 |
| 17 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,392 | LF |
$6.00 |
$8.00 |
$9.07 |
$6.50 |
$9.00 |
$7.70 |
| 18 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,460 | CY |
$12.00 |
$6.00 |
$5.00 |
$8.00 |
$8.00 |
$6.19 |
| 19 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 142 | CY |
$35.00 |
$18.00 |
$30.00 |
$17.00 |
$5.00 |
$30.25 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 225 | CY |
$650.00 |
$435.00 |
$490.50 |
$490.00 |
$646.74 |
$714.52 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 41,040 | LB |
$1.00 |
$1.20 |
$0.9700 |
$1.05 |
$0.9000 |
$0.7300 |
| 22 | 601(E) 1359 |
TYPE II-A SPECIAL PLAIN RIPRAP | 240 | TON |
$60.00 |
$50.00 |
$50.00 |
$55.00 |
$55.00 |
$13.87 |
| 23 | 601(F) 1361 |
TYPE II-A FILTER BLANKET | 55 | TON |
$60.00 |
$30.00 |
$45.00 |
$50.00 |
$38.00 |
$14.06 |
| 24 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$5,000.00 |
$15,000.00 |
$6,000.00 |
$25,375.00 |
| 25 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12 | SF |
$50.00 |
$23.70 |
$21.60 |
$25.00 |
$20.00 |
$27.50 |
| 26 | 851(C) 8324 |
2" SQUARE TUBE POST | 40 | LF |
$10.00 |
$11.86 |
$10.80 |
$15.00 |
$10.00 |
$13.75 |
| 27 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$50.00 |
$29.65 |
$8.64 |
$30.00 |
$25.00 |
$34.38 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,600.00 |
$1.08 |
$3,000.00 |
$2,250.00 |
$3,093.75 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$4,500.00 |
$6,048.00 |
$8,500.00 |
$7,700.00 |
$10,587.50 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$3,000.00 |
$3,500.00 |
$3,000.00 |
$2,500.00 |
$11,687.50 |
| 31 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$53,000.00 |
$33,000.00 |
$47,500.00 |
$48,000.00 |
$73,550.39 |
$49,118.75 |