| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$7,000.00 |
$8,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,822.23 | CY |
$8.64 |
$6.50 |
$9.50 |
| 3 | 210 0121 |
OBLITERATING ABANDONED ROAD | 637.71 | LF |
$8.20 |
$5.00 |
$8.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,002.7 | LF |
$1.50 |
$6.00 |
$8.49 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 68 | LF |
$6.00 |
$7.00 |
$19.44 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,655.19 | SY |
$3.50 |
$3.00 |
$6.98 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 301 | TON |
$58.25 |
$40.00 |
$26.00 |
| 8 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,575.38 |
$2,000.00 |
$1,900.00 |
| 9 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,753.78 |
$1,900.00 |
$1,712.50 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 158.8 | CY |
$10.00 |
$15.00 |
$25.00 |
| 11 | 501(G) 6309 |
CLSM BACKFILL | 55.6 | CY |
$159.70 |
$140.00 |
$165.00 |
| 12 | 504(B) 1305 |
SAW-CUT GROOVING | 404.7 | SY |
$7.00 |
$9.00 |
$7.60 |
| 13 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$240.00 |
$207.00 |
$280.00 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 382.02 | LF |
$70.00 |
$77.00 |
$85.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 14,989 | LB |
$1.79 |
$4.50 |
$3.50 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,089.85 |
$900.00 |
$950.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$900.00 |
$950.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 121.3 | CY |
$300.00 |
$625.00 |
$625.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 103.7 | CY |
$595.23 |
$625.00 |
$625.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 45,755.86 | LB |
$0.9000 |
$1.05 |
$1.00 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 248.74 | LF |
$31.54 |
$35.00 |
$35.00 |
| 22 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 597.45 | LF |
$40.11 |
$38.00 |
$45.00 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 248.74 | LF |
$15.23 |
$12.00 |
$5.00 |
| 24 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 597.45 | LF |
$12.35 |
$12.00 |
$5.00 |
| 25 | 514(K) 6260 |
(PL)PILOT HOLES | 804.19 | LF |
$96.99 |
$60.56 |
$75.00 |
| 26 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 27 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 221.36 | LF |
$630.00 |
$800.00 |
$625.00 |
| 28 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$30,000.00 |
$55,000.00 |
$55,000.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,077.66 | TON |
$45.00 |
$36.00 |
$49.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 359.22 | TON |
$36.00 |
$27.00 |
$37.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$8,500.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$2,885.45 |
$2,400.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$9,500.00 |
$9,600.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$68,752.00 |
$60,000.00 |
$67,000.00 |