| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,165 | CY |
$10.00 |
$10.00 |
$13.17 |
$20.15 |
$9.70 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 15 | CY |
$15.00 |
$80.00 |
$60.00 |
$35.40 |
$117.60 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,250.00 |
$2,000.00 |
$3,808.22 |
$7,895.00 |
$2,733.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 150 | LF |
$1.15 |
$6.00 |
$7.20 |
$7.30 |
$10.80 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$5.00 |
$15.00 |
$18.00 |
$18.25 |
$14.70 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,208 | SY |
$2.50 |
$4.50 |
$4.98 |
$5.56 |
$5.80 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.46 | AC |
$50.00 |
$500.00 |
$600.00 |
$608.30 |
$691.70 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 277 | CY |
$40.00 |
$40.00 |
$50.31 |
$100.06 |
$80.30 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 1,227 | SY |
$6.00 |
$8.00 |
$8.14 |
$11.61 |
$8.30 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 1,583 | SY |
$1.50 |
$2.00 |
$1.52 |
$1.92 |
$2.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 438 | TON |
$30.00 |
$30.00 |
$24.22 |
$31.62 |
$33.90 |
| 12 | 408 5774 |
PRIME COAT | 916 | GAL |
$4.00 |
$3.50 |
$4.82 |
$3.94 |
$5.20 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 275 | TON |
$75.00 |
$98.00 |
$109.79 |
$112.87 |
$179.90 |
| 14 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 869 | SY |
$35.00 |
$35.00 |
$44.88 |
$45.13 |
$65.80 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 290 | CY |
$150.00 |
$153.00 |
$152.94 |
$198.42 |
$262.30 |
| 16 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 350 | LF |
$12.00 |
$10.75 |
$13.57 |
$16.80 |
$44.30 |
| 17 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 51 | SY |
$60.00 |
$80.00 |
$72.38 |
$122.60 |
$181.50 |
| 18 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 37 | SY |
$30.00 |
$65.00 |
$47.36 |
$155.80 |
$97.20 |
| 19 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 48 | LF |
$100.00 |
$85.00 |
$112.15 |
$125.80 |
$118.30 |
| 20 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$2,500.00 |
$1,576.44 |
$2,413.97 |
$1,763.80 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$2,991.26 |
$5,601.65 |
$1,383.40 |
| 22 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 492 | SY |
$20.00 |
$6.00 |
$12.66 |
$9.15 |
$21.80 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 439 | SY |
$5.00 |
$6.00 |
$9.46 |
$10.91 |
$10.50 |
| 24 | 619(B) 4791 |
REMOVAL OF CURB | 350 | LF |
$3.00 |
$5.00 |
$8.55 |
$3.62 |
$25.20 |
| 25 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 53 | SY |
$5.00 |
$5.00 |
$14.11 |
$12.06 |
$28.50 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 959 | LF |
$4.00 |
$3.00 |
$4.48 |
$7.99 |
$2.60 |
| 27 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,200 | LF |
$0.2500 |
$0.6000 |
$1.20 |
$0.6100 |
$1.40 |
| 28 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 135 | SD |
$8.00 |
$5.15 |
$6.00 |
$6.08 |
$7.00 |
| 29 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 700 | LF |
$24.00 |
$14.00 |
$15.54 |
$16.79 |
$18.00 |
| 30 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 45 | SD |
$3.00 |
$2.00 |
$7.20 |
$1.22 |
$8.30 |
| 31 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 675 | SD |
$0.3000 |
$1.00 |
$0.0600 |
$1.22 |
$0.1000 |
| 32 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 630 | SD |
$0.6000 |
$1.00 |
$0.1800 |
$1.22 |
$0.3000 |
| 33 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 675 | SD |
$1.20 |
$1.00 |
$0.1800 |
$1.22 |
$0.3000 |
| 34 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 405 | SD |
$1.00 |
$4.50 |
$0.3600 |
$4.87 |
$0.5000 |
| 35 | 880(C) 8848 |
WING BARRICADES | 90 | SD |
$1.50 |
$15.00 |
$9.60 |
$12.17 |
$11.10 |
| 36 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 675 | SD |
$0.4000 |
$2.00 |
$0.7200 |
$2.43 |
$0.9000 |
| 37 | 880(F) 8878 |
DRUMS | 675 | SD |
$0.2500 |
$1.10 |
$2.40 |
$1.22 |
$2.80 |
| 38 | 880(G) 8890 |
CHANNELIZER CONES | 1,800 | SD |
$0.4000 |
$0.7500 |
$2.40 |
$0.6100 |
$2.80 |
| 39 | 880(I) 8902 |
FLAGGER | 45 | SD |
$116.00 |
$110.00 |
$192.00 |
$409.98 |
$1,909.60 |
| 40 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 360 | HOUR |
$65.00 |
$5.00 |
$74.40 |
$68.33 |
$124.50 |
| 41 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 104 | SD |
$13.00 |
$25.00 |
$14.40 |
$30.42 |
$16.60 |
| 42 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$69.00 |
$50.00 |
$48.00 |
$60.83 |
$55.40 |
| 43 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$378.00 |
$250.00 |
$210.00 |
$304.15 |
$242.10 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 44 | SF |
$21.00 |
$20.00 |
$33.60 |
$24.33 |
$38.80 |
| 45 | 851(C) 8324 |
2" SQUARE TUBE POST | 84 | LF |
$10.00 |
$13.00 |
$8.40 |
$14.60 |
$9.70 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 10,000 | LF |
$0.4500 |
$0.9000 |
$1.08 |
$1.05 |
$1.30 |
| 47 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 1,000 | LF |
$0.7000 |
$1.50 |
$1.14 |
$1.82 |
$1.40 |
| 48 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,000 | LF |
$1.40 |
$2.25 |
$3.60 |
$2.43 |
$4.20 |
| 49 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 12 | LF |
$6.00 |
$25.00 |
$9.60 |
$30.42 |
$11.10 |
| 50 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 10 | EA |
$158.00 |
$125.00 |
$360.00 |
$152.08 |
$415.00 |
| 51 | 880(G) 8900 |
TUBE CHANNELIZERS | 31 | EA |
$57.00 |
$100.00 |
$117.60 |
$91.25 |
$135.60 |
| 52 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 150 | LF |
$20.00 |
$30.00 |
$33.60 |
$34.07 |
$38.80 |
| 53 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 79 | LF |
$7.00 |
$12.00 |
$14.40 |
$14.60 |
$16.60 |
| 54 | 805(B) 8728 |
(PL)RESET OF PULL BOX | 1 | EA |
$560.00 |
$2,500.00 |
$1,176.00 |
$1,192.28 |
$1,355.70 |
| 55 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 460 | LF |
$2.50 |
$5.25 |
$5.40 |
$5.47 |
$6.30 |
| 56 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$1,500.00 |
$2,000.00 |
$2,351.94 |
$3,265.74 |
$20,750.00 |
| 57 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$17,460.00 |
$15,000.00 |
$29,339.68 |
$45,979.74 |
$33,532.50 |
| 58 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 80 | SY |
$100.00 |
$85.00 |
$111.34 |
$292.25 |
$139.10 |
| 59 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 27 | CY |
$150.00 |
$153.00 |
$158.33 |
$276.92 |
$262.30 |