GRADE,DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (ENOS ROAD): FROM 4.0 MILES SOUTH OF SH-32, EXTEND SOUTH NEAR KINGSTON . PROJECT LENGTH = 3.039 MILES

Let date
Thursday, February 15, 2018
Contract
180052
J/P numbers
29986(04)
District
Division 2
County
Marshall
Highway
Limits
GRADE,DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (ENOS ROAD): FROM 4.0 MILES SOUTH OF SH-32, EXTEND SOUTH NEAR KINGSTON . PROJECT LENGTH = 3.039 MILES
Project number
CIRB-248C(034)RB

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,821,129
1 THE CUMMINS CONSTRUCTION CO., INC. Low bidder $2,563,205 -9.1%
2 OVERLAND CORPORATION $2,628,278 -6.8% +2.5%
3 Silver Star Construction Company, Inc. $2,962,255 +5.0% +15.6%

Bid tab: unit prices 37 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 THE CUMMINS CON…#2 OVERLAND CORPOR…#3 Silver Star Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $28,136.19 $23,000.00 $87,000.00 $23,500.00
2202(A) 0183 UNCLASSIFIED EXCAVATION28,047CY $8.77 $10.43 $15.95 $11.35
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $38,295.86 $33,637.50 $40,750.00 $36,000.00
4221(C) 2801 TEMPORARY SILT FENCE15,821LF $1.26 $3.03 $1.35 $3.50
5221(F) 0100 TEMPORARY SILT DIKE800LF $7.95 $15.88 $9.50 $18.00
6230(A) 2806 SOLID SLAB SODDING14,080SY $1.62 $6.83 $2.10 $7.80
7232(B) 2814 SEEDING METHOD B12.38AC $400.00 $6,500.00 $400.00 $7,430.00
8233(A) 2817 VEGETATIVE MULCHING15.28AC $384.43 $3,700.00 $955.00 $4,200.00
9234(A) 2824 FERTILIZING (10-20-10)1.41TON $541.56 $1,503.00 $530.00 $1,600.00
10303(A) 2100 AGGREGATE BASE TYPE A9,170CY $48.69 $50.00 $46.00 $54.50
11325 5271 SEPARATOR FABRIC17,718SY $1.48 $0.7500 $1.60 $0.9500
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,907TON $26.83 $25.50 $29.95 $27.50
13407(B) 0250 TACK COAT7,628GAL $3.44 $2.50 $0.0100 $2.50
14408 5774 PRIME COAT13,756GAL $3.95 $3.75 $0.0100 $3.00
15411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)8,448TON $71.29 $55.00 $63.90 $73.00
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)5,951TON $78.08 $67.25 $73.55 $87.50
17412 5267 COLD MILLING PAVEMENT500SY $13.52 $8.15 $15.00 $30.00
18601(A) 0297 TYPE I PLAIN RIPRAP185TON $52.69 $38.70 $52.15 $42.00
19611(G) 6002 INLET (SMD-TYPE 2)1EA $2,758.90 $3,400.00 $4,100.00 $3,690.00
20613(B) 0689 18" CORR. GALV. STEEL PIPE973LF $32.28 $24.00 $52.00 $26.00
21613(B) 0690 24" CORR. GALV. STEEL PIPE149LF $42.19 $31.00 $40.00 $33.00
22613(EE) 5610 (SP) 18" CORRUGATED POLYPROPYLENE PIPE152LF $38.67 $32.00 $59.00 $34.00
23613(EE) 5620 (SP) 24" CORRUGATED POLYPROPYLENE PIPE566LF $195.00 $47.00 $69.00 $51.00
24619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $24,924.99 $9,500.00 $25,000.00 $10,000.00
25629(A) 4958 MAILBOX INSTALLATION-SINGLE15EA $87.12 $70.00 $70.00 $100.00
26629(B) 4959 MAILBOX INSTALLATION-MULTIPLE3EA $160.13 $165.00 $165.00 $215.00
27629(C) 4960 MAILBOX21EA $43.44 $38.00 $40.00 $55.00
28509(A) 1326 CLASS AA CONCRETE125CY $685.70 $625.00 $617.50 $815.00
29511(A) 1332 REINFORCING STEEL23,594LB $1.04 $1.50 $1.40 $0.5500
30850(A) 8110 SHEET ALUMINUM SIGNS329.75SF $17.34 $12.00 $12.70 $15.00
31851(C) 8324 2" SQUARE TUBE POST385.88LF $9.40 $15.00 $15.90 $9.00
32853 9039 DELINEATORS(TYPE 2, CODE 3)26EA $24.52 $23.00 $24.50 $34.00
33854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)63,632LF $0.1100 $0.1000 $0.1100 $0.1400
34880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $11,005.03 $5,350.00 $6,000.00 $10,342.45
35642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $36,708.36 $68,700.00 $20,000.00 $48,700.00
36220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,945.79 $15,000.00 $2,000.00 $8,500.00
37641 1552 MOBILIZATION1LSUM $369,112.37 $131,500.00 $150,000.00 $147,500.00