| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$52,609.90 |
$4,200.00 |
$9,630.00 |
$20,000.00 |
$9,630.00 |
$7,750.00 |
$42,000.00 |
$12,090.00 |
$27,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,389 | CY |
$10.00 |
$7.50 |
$8.00 |
$15.00 |
$8.00 |
$7.50 |
$9.00 |
$14.20 |
$10.00 |
| 3 | 202(F) 0110 |
EMBANKMENTS | 413 | CY |
$10.00 |
$7.96 |
$6.00 |
$15.00 |
$6.00 |
$12.00 |
$9.00 |
$31.40 |
$10.00 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 130 | CY |
$7.50 |
$4.33 |
$16.50 |
$50.00 |
$16.50 |
$36.00 |
$40.00 |
$108.50 |
$30.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,650 | LF |
$1.90 |
$2.35 |
$2.00 |
$2.15 |
$2.00 |
$2.20 |
$2.00 |
$2.10 |
$3.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,950 | SY |
$2.90 |
$4.73 |
$4.00 |
$4.25 |
$4.00 |
$4.40 |
$4.00 |
$4.20 |
$3.00 |
| 7 | 307(D) 4230 |
LIME | 12 | TON |
$185.00 |
$185.00 |
$175.00 |
$200.00 |
$175.00 |
$192.50 |
$235.00 |
$217.00 |
$500.00 |
| 8 | 307(I) 4280 |
LIME MODIFIED SUBGRADE | 705 | SY |
$4.00 |
$15.60 |
$15.00 |
$15.00 |
$15.00 |
$16.50 |
$6.00 |
$33.10 |
$35.00 |
| 9 | 407(B) 0250 |
TACK COAT | 213 | GAL |
$4.90 |
$4.71 |
$4.65 |
$2.50 |
$4.65 |
$5.10 |
$6.00 |
$5.30 |
$8.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 717 | TON |
$98.10 |
$73.95 |
$72.50 |
$63.00 |
$72.50 |
$80.00 |
$120.00 |
$72.30 |
$80.00 |
| 11 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 239 | TON |
$140.40 |
$100.41 |
$98.50 |
$79.00 |
$98.50 |
$109.00 |
$130.00 |
$110.50 |
$95.00 |
| 12 | 509(B) 1328 |
CLASS A CONCRETE | 3.4 | CY |
$757.70 |
$425.00 |
$1,200.00 |
$682.00 |
$426.00 |
$750.00 |
$500.00 |
$1,402.00 |
$1,000.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 189 | CY |
$331.50 |
$325.00 |
$350.00 |
$315.00 |
$421.00 |
$322.50 |
$250.00 |
$200.00 |
$400.00 |
| 14 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 23.28 | SY |
$75.20 |
$73.00 |
$326.97 |
$76.00 |
$243.00 |
$150.00 |
$85.00 |
$210.50 |
$125.00 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 22 | LF |
$38.40 |
$29.00 |
$33.00 |
$89.00 |
$33.00 |
$34.00 |
$40.00 |
$104.00 |
$50.00 |
| 16 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,288.60 |
$850.00 |
$1,200.00 |
$985.00 |
$2,133.00 |
$1,200.00 |
$1,000.00 |
$1,385.00 |
$1,200.00 |
| 17 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 40 | LF |
$5.00 |
$12.00 |
$4.00 |
$12.00 |
$4.00 |
$12.00 |
$5.00 |
$10.40 |
$90.00 |
| 18 | 619(C) 0924 |
SAWING PAVEMENT | 64 | LF |
$7.30 |
$8.50 |
$10.00 |
$5.00 |
$50.00 |
$14.50 |
$5.00 |
$5.90 |
$40.00 |
| 19 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 3,739.81 | CY |
$8.10 |
$8.50 |
$8.25 |
$16.00 |
$8.25 |
$7.75 |
$13.00 |
$10.50 |
$10.00 |
| 20 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 151.94 | CY |
$27.60 |
$12.00 |
$5.00 |
$30.00 |
$27.00 |
$22.25 |
$35.00 |
$25.90 |
$10.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 365.88 | CY |
$475.20 |
$400.00 |
$388.10 |
$345.00 |
$455.00 |
$495.00 |
$538.00 |
$506.00 |
$500.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 55,798.63 | LB |
$1.00 |
$0.9100 |
$0.8500 |
$0.7100 |
$0.8000 |
$0.8100 |
$1.10 |
$1.05 |
$1.40 |
| 23 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$49,094.10 |
$6,500.00 |
$6,020.58 |
$26,500.00 |
$6,020.58 |
$9,000.00 |
$12,000.00 |
$12,765.00 |
$38,000.00 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$17.00 |
$17.40 |
$17.00 |
$18.10 |
$17.00 |
$22.00 |
$20.00 |
$17.70 |
$26.00 |
| 25 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,080.00 |
$2,040.00 |
$2,175.00 |
$2,040.00 |
$2,640.00 |
$2,400.00 |
$2,129.00 |
$2,600.00 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$27.60 |
$35.00 |
$30.00 |
$32.00 |
$30.00 |
$25.00 |
$35.50 |
$31.30 |
$25.00 |
| 27 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 16 | LF |
$15.00 |
$10.00 |
$9.00 |
$9.60 |
$9.00 |
$12.00 |
$10.65 |
$9.40 |
$25.00 |
| 28 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,600 | LF |
$1.50 |
$1.25 |
$1.20 |
$1.30 |
$1.20 |
$1.32 |
$1.45 |
$1.25 |
$1.70 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,384.80 |
$3,000.00 |
$1,800.00 |
$1,920.00 |
$1,800.00 |
$3,000.00 |
$3,300.00 |
$1,879.00 |
$8,000.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$31,026.00 |
$4,400.00 |
$5,500.00 |
$8,950.00 |
$5,500.00 |
$5,000.00 |
$4,800.00 |
$5,741.00 |
$12,000.00 |
| 31 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,330.40 |
$2,750.00 |
$2,500.00 |
$8,320.00 |
$2,800.00 |
$1,800.00 |
$4,000.00 |
$2,938.00 |
$2,000.00 |
| 32 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$67,525.80 |
$26,260.00 |
$38,035.01 |
$26,810.03 |
$43,400.00 |
$34,750.00 |
$19,500.00 |
$77,732.94 |
$50,000.00 |