Bid tab 170109

Let Feb 16, 2017 · Division 6 · Woods Sign up free

‹ Feb 2017 results

GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-237): FROM 5 MILES NORTH OF US -64, EXTEND NORTH NEAR ALVA . PROJECT LENGTH = 2.964 MILES

Let date
Thursday, February 16, 2017
Contract
170109
J/P numbers
30492(04)
District
Division 6
County
Woods
Highway
Limits
GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-237): FROM 5 MILES NORTH OF US -64, EXTEND NORTH NEAR ALVA . PROJECT LENGTH = 2.964 MILES
Project number
STP-276C(025)CI

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,563,209
1 Venture Corporation dba VCO Paving Low bidder $2,444,096 -4.6%
2 J & R SAND COMPANY, INC. $2,774,090 +8.2% +13.5%
3 TOM HUDSON PAVING, INC. $2,852,835 +11.3% +16.7%
4 THE CUMMINS CONSTRUCTION CO., INC. $2,871,347 +12.0% +17.5%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Venture Corpora…#2 J & R SAND COMP…#3 TOM HUDSON PAVI…#4 THE CUMMINS CON…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $35,000.00 $30,000.00 $56,576.23 $41,200.00
2202(A) 0183 UNCLASSIFIED EXCAVATION22,381CY $6.50 $7.50 $7.00 $9.12 $10.15
3221(C) 2801 TEMPORARY SILT FENCE10,050LF $2.00 $1.11 $1.11 $1.19 $1.85
4221(F) 0100 TEMPORARY SILT DIKE1,106LF $8.00 $6.00 $6.00 $6.42 $13.35
5230(A) 2806 SOLID SLAB SODDING43,471SY $1.50 $1.15 $1.15 $1.23 $1.40
6233(A) 2817 VEGETATIVE MULCHING8.98AC $250.00 $150.00 $150.00 $160.50 $205.00
7303(A) 2100 AGGREGATE BASE TYPE A9,349CY $62.00 $75.00 $84.00 $88.28 $70.00
8402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E486TON $50.00 $50.00 $50.00 $61.91 $37.45
9407(B) 0250 TACK COAT2,030GAL $2.40 $1.75 $2.50 $2.14 $3.35
10408 5774 PRIME COAT10,643GAL $3.00 $2.00 $3.00 $3.74 $3.25
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)9,303TON $80.00 $62.00 $85.00 $72.86 $80.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)4,478TON $90.00 $72.00 $92.00 $71.74 $86.35
13501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON104CY $20.00 $25.00 $20.00 $26.30 $21.65
14501(G) 6315 CLSM BACKFILL113CY $250.00 $275.00 $250.00 $148.42 $215.25
15509(B) 0321 CLASS A CONCRETE64CY $600.00 $625.00 $600.00 $748.41 $1,231.00
16509(D) 0325 CLASS C CONCRETE40CY $350.00 $375.00 $350.00 $449.51 $396.60
17511(A) 0332 REINFORCING STEEL1,702LB $1.00 $1.00 $1.00 $1.53 $0.8500
18613(A) 0492 24" R.C.PIPE CLASS III310LF $72.00 $72.00 $72.00 $99.83 $77.25
19613(A) 0495 42" R.C.PIPE CLASS III66LF $165.00 $165.00 $165.00 $204.02 $154.50
20613(A) 0496 48" R.C.PIPE CLASS III224LF $170.00 $200.00 $200.00 $200.77 $180.25
21613(A) 4434 73" X 45" R.C.PIPE ARCH CLASS A-III66LF $390.00 $390.00 $390.00 $374.42 $412.00
22613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III116LF $142.00 $142.00 $142.00 $159.97 $144.20
23613(B) 0689 18" CORR. GALV. STEEL PIPE345LF $32.00 $32.00 $32.00 $53.38 $30.90
24613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $650.00 $250.00 $250.00 $397.49 $206.00
25613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND4EA $2,350.00 $2,350.00 $2,350.00 $2,657.91 $4,120.00
26619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $30,000.00 $25,000.00 $48,002.15 $41,200.00
27619(B) 4728 REMOVAL OF ASPHALT PAVEMENT350SY $15.00 $15.00 $15.00 $11.04 $6.25
28619(C) 0924 SAWING PAVEMENT44LF $5.00 $3.00 $4.00 $15.15 $12.55
29623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE200LF $17.50 $20.00 $15.95 $17.07 $31.05
30623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)8EA $1,600.00 $2,250.00 $1,595.00 $1,706.69 $1,740.00
31623(G) 8571 GUARDRAIL END TREATMENT (GET)8EA $2,500.00 $2,300.00 $2,275.00 $2,434.31 $2,823.95
32629(E) 5048 REMOVE AND RESET MAILBOX1EA $200.00 $250.00 $250.00 $92.90 $104.50
33850(A) 8110 SHEET ALUMINUM SIGNS20.36SF $36.00 $15.00 $15.00 $16.05 $15.45
34856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)28,794LF $0.4500 $0.6500 $0.6500 $0.7000 $0.6500
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $20,000.00 $5,000.00 $5,000.00 $5,350.12 $5,150.00
36642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $25,000.00 $19,500.00 $55,924.05 $20,085.00
37220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,000.00 $21,000.00 $10,000.00 $39,471.82 $7,837.50
38641 1552 MOBILIZATION1LSUM $127,000.00 $145,000.00 $125,000.00 $158,656.61 $254,455.00