| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$11,600.00 |
$10,385.00 |
$3,000.00 |
$35,000.00 |
$10,000.00 |
$18,000.00 |
$12,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,311 | CY |
$12.00 |
$11.75 |
$9.00 |
$9.50 |
$11.00 |
$8.00 |
$17.00 |
$14.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,718 | LF |
$2.00 |
$1.49 |
$1.50 |
$1.49 |
$1.50 |
$1.50 |
$2.25 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$10.00 |
$8.95 |
$10.00 |
$8.95 |
$9.00 |
$8.00 |
$9.00 |
$13.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 8,700 | SY |
$2.30 |
$1.34 |
$2.65 |
$1.34 |
$1.70 |
$1.75 |
$2.55 |
$3.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 810 | CY |
$50.00 |
$36.79 |
$42.25 |
$49.00 |
$40.00 |
$41.00 |
$47.50 |
$60.00 |
| 7 | 325 5271 |
SEPARATOR FABRIC | 3,158 | SY |
$1.70 |
$2.50 |
$1.50 |
$1.10 |
$2.10 |
$1.50 |
$2.00 |
$2.50 |
| 8 | 407(B) 0250 |
TACK COAT | 238 | GAL |
$4.70 |
$3.50 |
$4.00 |
$3.50 |
$3.00 |
$4.00 |
$3.85 |
$4.00 |
| 9 | 408 5774 |
PRIME COAT | 2,105 | GAL |
$5.90 |
$5.00 |
$2.00 |
$5.00 |
$1.00 |
$6.00 |
$5.65 |
$5.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 676 | TON |
$86.00 |
$71.50 |
$80.00 |
$71.50 |
$65.00 |
$98.00 |
$82.25 |
$95.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 350 | TON |
$102.00 |
$96.00 |
$93.00 |
$96.00 |
$85.00 |
$120.00 |
$110.50 |
$95.00 |
| 12 | 611(K) 5987 |
(PL)RPL DROP INLET GRATES-CDI RCP DES. 1 | 1 | EA |
$1,500.00 |
$2,125.60 |
$2,600.00 |
$2,200.00 |
$6,500.00 |
$4,500.00 |
$200.00 |
$8,600.00 |
| 13 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 60 | LF |
$57.00 |
$46.15 |
$58.50 |
$65.00 |
$50.00 |
$48.00 |
$62.00 |
$90.00 |
| 14 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 236 | LF |
$43.00 |
$28.20 |
$84.00 |
$45.00 |
$45.00 |
$30.00 |
$35.00 |
$65.00 |
| 15 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,010.00 |
$1,500.00 |
$1,600.00 |
$1,500.00 |
$62.00 |
$1,300.00 |
$400.00 |
$1,100.00 |
| 16 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 16.44 | CY |
$52.00 |
$42.24 |
$56.25 |
$65.00 |
$75.00 |
$34.00 |
$47.00 |
$60.00 |
| 17 | 613(V) 1180 |
TRENCH EXCAVATION | 23 | CY |
$14.00 |
$15.00 |
$18.00 |
$10.00 |
$40.00 |
$20.00 |
$15.00 |
$14.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$4,000.00 |
$6,400.00 |
$5,000.00 |
$25,000.00 |
$10,000.00 |
$20,000.00 |
$6,900.00 |
| 19 | 626(A) 1257 |
MONUMENTS | 1 | EA |
$500.00 |
$1,000.00 |
$804.00 |
$100.00 |
$2,500.00 |
$1,500.00 |
$6,500.00 |
$1,400.00 |
| 20 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$113.00 |
$250.00 |
$125.00 |
$300.00 |
$50.00 |
$150.00 |
$250.00 |
$500.00 |
| 21 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 123 | CY |
$10.00 |
$11.60 |
$12.00 |
$10.00 |
$25.00 |
$20.00 |
$35.00 |
$14.00 |
| 22 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 80 | CY |
$23.00 |
$20.00 |
$18.75 |
$25.00 |
$60.00 |
$15.00 |
$65.00 |
$14.00 |
| 23 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 49 | CY |
$13.00 |
$50.40 |
$13.25 |
$50.00 |
$72.00 |
$12.00 |
$40.00 |
$60.00 |
| 24 | 501(F) 6352 |
GRANULAR BACKFILL | 74 | CY |
$63.00 |
$53.75 |
$52.50 |
$65.00 |
$45.00 |
$45.00 |
$47.50 |
$60.00 |
| 25 | 504(B) 1305 |
SAW-CUT GROOVING | 135 | SY |
$9.90 |
$10.00 |
$17.25 |
$10.00 |
$15.00 |
$8.00 |
$14.30 |
$50.00 |
| 26 | 508 6359 |
PRECAST ARCH CULVERT | 44 | LF |
$4,400.00 |
$3,429.00 |
$4,867.00 |
$4,700.00 |
$4,800.00 |
$4,775.00 |
$3,750.00 |
$5,800.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 117 | CY |
$492.00 |
$417.00 |
$500.00 |
$650.00 |
$515.00 |
$550.00 |
$660.00 |
$600.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 11,210 | LB |
$1.00 |
$1.00 |
$1.00 |
$0.8500 |
$0.8000 |
$0.9000 |
$2.00 |
$1.40 |
| 29 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,545 | LB |
$1.20 |
$1.50 |
$1.50 |
$1.40 |
$1.05 |
$2.30 |
$5.00 |
$1.80 |
| 30 | 516(A) 6090 |
DRILLED SHAFTS 24" DIAMETER | 207 | LF |
$270.00 |
$150.00 |
$301.00 |
$225.00 |
$240.00 |
$205.00 |
$110.00 |
$330.00 |
| 31 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 518 | TON |
$35.00 |
$30.00 |
$32.00 |
$40.00 |
$38.00 |
$34.00 |
$44.00 |
$45.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 259 | TON |
$29.00 |
$22.00 |
$25.00 |
$30.00 |
$30.00 |
$28.00 |
$45.00 |
$30.00 |
| 33 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,036 | SY |
$3.00 |
$2.50 |
$4.50 |
$1.35 |
$18.00 |
$3.00 |
$2.00 |
$3.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$9,500.00 |
$13,500.00 |
$5,000.00 |
$20,000.00 |
$15,000.00 |
$17,500.00 |
$47,000.00 |
| 35 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 22 | SF |
$24.00 |
$14.00 |
$18.75 |
$14.00 |
$14.50 |
$16.00 |
$15.50 |
$30.00 |
| 36 | 851(C) 8324 |
2" SQUARE TUBE POST | 61 | LF |
$9.60 |
$8.00 |
$10.75 |
$8.00 |
$20.00 |
$10.00 |
$8.80 |
$11.00 |
| 37 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,800 | LF |
$0.9000 |
$1.00 |
$1.35 |
$1.00 |
$1.05 |
$1.10 |
$1.25 |
$0.8000 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,800.00 |
$2,412.00 |
$1,800.00 |
$1,805.00 |
$5,000.00 |
$2,500.00 |
$7,800.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,500.00 |
$3,886.00 |
$5,900.00 |
$8,200.00 |
$20,000.00 |
$15,000.00 |
$9,000.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$5,000.00 |
$3,350.00 |
$1,250.00 |
$1,508.00 |
$15,000.00 |
$20,000.00 |
$2,900.00 |
| 41 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$37,739.96 |
$18,291.00 |
$60,000.00 |
$50,000.00 |
$80,000.00 |
$60,000.00 |
$90,000.00 |