| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$12,000.00 |
$18,900.00 |
$20,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$19,450.00 |
$30,000.00 |
$37,000.00 |
$61,673.85 |
$50,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,385 | LF |
$2.50 |
$1.25 |
$1.35 |
$1.18 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$8.00 |
$8.65 |
$8.00 |
$8.29 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 11,980 | SY |
$1.50 |
$1.28 |
$1.28 |
$1.21 |
$1.50 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 5 | AC |
$450.00 |
$30.00 |
$50.00 |
$26.25 |
$250.00 |
| 7 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,425 | SY |
$7.00 |
$7.50 |
$6.40 |
$6.09 |
$9.00 |
| 8 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 704 | TON |
$70.00 |
$77.00 |
$79.00 |
$72.19 |
$80.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 372 | TON |
$80.00 |
$90.00 |
$91.15 |
$83.21 |
$98.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$350.00 |
$275.00 |
$240.27 |
$400.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 30 | LF |
$40.00 |
$40.00 |
$29.00 |
$42.00 |
$75.00 |
| 12 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$200.00 |
$250.00 |
$472.50 |
$1,500.00 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$3,800.00 |
$5,250.00 |
$10,000.00 |
| 14 | 619(C) 0924 |
SAWING PAVEMENT | 192 | LF |
$5.00 |
$5.00 |
$7.50 |
$5.25 |
$6.00 |
| 15 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10.36 | SF |
$20.00 |
$22.00 |
$25.00 |
$21.00 |
$24.00 |
| 16 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 26 | LF |
$12.00 |
$11.00 |
$15.00 |
$10.50 |
$14.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 260 | CY |
$18.00 |
$15.00 |
$8.75 |
$22.00 |
$25.00 |
| 18 | 501(F) 6352 |
GRANULAR BACKFILL | 170 | CY |
$60.00 |
$75.00 |
$65.00 |
$80.67 |
$70.00 |
| 19 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 538.67 | LF |
$300.00 |
$310.00 |
$295.00 |
$307.31 |
$300.00 |
| 20 | 504(B) 1305 |
SAW-CUT GROOVING | 432.7 | SY |
$5.00 |
$3.80 |
$4.50 |
$4.18 |
$9.00 |
| 21 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$75.00 |
$85.00 |
$73.00 |
$91.27 |
$100.00 |
| 22 | 506(A) 1322 |
STRUCTURAL STEEL | 1,420 | LB |
$3.00 |
$3.00 |
$4.50 |
$3.40 |
$6.00 |
| 23 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$900.00 |
$1,000.00 |
$1,300.00 |
$1,463.79 |
$1,600.00 |
| 24 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$900.00 |
$1,000.00 |
$1,300.00 |
$1,463.79 |
$1,600.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 150.6 | CY |
$450.00 |
$600.00 |
$650.00 |
$704.48 |
$520.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 106.2 | CY |
$500.00 |
$600.00 |
$675.00 |
$646.34 |
$500.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 48,310 | LB |
$1.00 |
$0.7000 |
$0.9000 |
$0.9100 |
$1.20 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 216 | LF |
$30.00 |
$25.00 |
$28.00 |
$32.28 |
$30.00 |
| 29 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 874 | LF |
$40.00 |
$30.00 |
$32.20 |
$38.83 |
$40.00 |
| 30 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 216 | LF |
$15.00 |
$15.00 |
$12.00 |
$22.00 |
$35.00 |
| 31 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 874 | LF |
$15.00 |
$15.00 |
$13.80 |
$22.00 |
$35.00 |
| 32 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,170 | TON |
$40.00 |
$38.00 |
$38.47 |
$41.07 |
$45.00 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 322 | TON |
$30.00 |
$29.00 |
$29.56 |
$32.89 |
$32.00 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$25.00 |
$25.00 |
$30.00 |
$31.09 |
$20.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 65 | LF |
$25.00 |
$25.00 |
$30.00 |
$24.77 |
$20.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$20,000.00 |
$16,500.00 |
$40,000.00 |
| 38 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 55 | LF |
$15.00 |
$27.50 |
$25.00 |
$24.75 |
$28.00 |
| 39 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,550.00 |
$1,600.00 |
$1,595.00 |
$1,800.00 |
| 40 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,300.00 |
$2,090.00 |
$1,700.00 |
$1,705.00 |
$2,400.00 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$2,800.00 |
$1,980.00 |
$3,500.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$14,226.00 |
$5,950.00 |
$6,500.00 |
$6,615.00 |
$15,000.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,000.00 |
$2,625.00 |
$5,000.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$61,280.00 |
$40,000.00 |
$44,000.00 |
$66,763.06 |
$70,000.00 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,215 | LF |
$5.00 |
$4.56 |
$4.60 |
$4.36 |
$7.00 |