Bid tab 170006

Let Jan 19, 2017 · Division 2 · Bryan Sign up free

‹ Jan 2017 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-3710/BRYAN ROAD ): OVER LITTLE BLUE RIVER, 1.2 MILES SOUTH OF SH-78 NEAR DURANT. PROJECT LENGTH = 0.227 MILE

Let date
Thursday, January 19, 2017
Contract
170006
J/P numbers
31305(04)
District
Division 2
County
Bryan
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-3710/BRYAN ROAD ): OVER LITTLE BLUE RIVER, 1.2 MILES SOUTH OF SH-78 NEAR DURANT. PROJECT LENGTH = 0.227 MILE
Project number
CIRB-207C(055)RB

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$782,247
1 HUB Construction, Inc. Low bidder $648,552 -17.1%
2 RRY SERVICES LLC $693,060 -11.4% +6.9%
3 Treas Construction Inc $727,429 -7.0% +12.2%
4 K & R BUILDERS, INC. $766,886 -2.0% +18.2%
5 C3 Construction, Inc. $782,251 +0.0% +20.6%
6 EARTH BUILDERS, L.P. $1,021,985 +30.6% +57.6%
7 SEMA CONSTRUCTION, INC. $1,056,053 +35.0% +62.8%

Bid tab: unit prices 42 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HUB Constructio…#2 RRY SERVICES LLC#3 Treas Construct…#4 K & R BUILDERS,…#5 C3 Construction…#6 EARTH BUILDERS,…#7 SEMA CONSTRUCTI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $17,624.35 $8,000.00 $4,000.00 $7,725.00 $10,500.00 $16,903.68 $30,000.00 $58,400.00
2202(H) 0185 EARTHWORK1LSUM $43,842.36 $43,000.00 $45,000.00 $47,380.00 $52,000.00 $50,172.95 $130,000.00 $153,996.05
3221(C) 2801 TEMPORARY SILT FENCE2,260LF $1.74 $2.81 $2.00 $1.64 $2.20 $2.24 $3.00 $1.70
4221(F) 0100 TEMPORARY SILT DIKE80LF $8.86 $8.13 $14.00 $7.36 $15.40 $10.07 $15.00 $7.50
5230(A) 2806 SOLID SLAB SODDING1,460SY $2.86 $2.38 $7.00 $5.15 $8.40 $7.04 $10.00 $8.50
6303(A) 2100 AGGREGATE BASE TYPE A664CY $56.43 $43.00 $48.00 $45.87 $54.43 $22.26 $80.00 $41.00
7402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E123TON $38.94 $25.00 $45.00 $25.76 $28.72 $22.26 $50.00 $93.00
8407(B) 0250 TACK COAT273GAL $4.94 $11.62 $1.80 $10.30 $11.00 $2.54 $10.00 $5.00
9408 5774 PRIME COAT1,567GAL $5.02 $5.23 $2.70 $4.64 $4.50 $3.80 $10.00 $4.10
10411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)636TON $101.74 $110.00 $73.10 $103.00 $115.00 $102.97 $135.00 $83.00
11411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)422TON $120.64 $130.00 $84.30 $129.78 $141.00 $118.75 $120.00 $83.00
12613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH56LF $35.80 $20.77 $35.00 $24.77 $48.00 $40.99 $55.00 $110.00
13613(P) 7025 21" X 15" GALV. STEEL CULVERT END SECTION ARCH4EA $650.00 $91.81 $300.00 $295.40 $300.00 $138.05 $2,000.00 $440.00
14623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE100LF $21.90 $19.10 $16.00 $16.48 $19.20 $28.17 $25.00 $17.00
15623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,778.90 $1,524.09 $1,355.00 $1,395.65 $1,626.00 $2,465.12 $2,500.00 $1,400.00
16623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,295.56 $2,109.44 $2,200.00 $2,266.00 $2,640.00 $3,099.01 $3,000.00 $2,300.00
17624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)1,041LF $4.66 $6.00 $4.85 $4.99 $6.00 $7.04 $8.00 $5.00
18629(E) 5048 REMOVE AND RESET MAILBOX1EA $184.75 $100.00 $125.00 $206.00 $405.00 $84.52 $300.00 $520.00
19501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON210CY $17.14 $11.12 $25.00 $15.45 $9.25 $13.38 $25.00 $22.00
20501(G) 6309 CLSM BACKFILL108CY $153.89 $124.99 $155.00 $190.80 $160.00 $207.07 $150.00 $160.00
21503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)418.67LF $245.93 $230.00 $250.00 $215.98 $214.00 $254.63 $250.00 $260.00
22504(A) 1304 APPROACH SLAB141.6SY $181.60 $159.72 $200.00 $166.86 $205.00 $197.84 $150.00 $160.00
23504(B) 1305 SAW-CUT GROOVING447.5SY $7.06 $7.00 $6.00 $7.21 $7.70 $8.45 $12.00 $6.50
24504(D) 6239 CONCRETE RAIL (TR3)276.4LF $82.66 $68.14 $85.00 $71.61 $74.50 $86.28 $100.00 $64.00
25506(A) 1322 STRUCTURAL STEEL760LB $2.57 $1.85 $2.75 $3.28 $3.00 $3.10 $3.00 $2.60
26507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY4EA $932.84 $625.65 $875.00 $859.02 $975.00 $1,014.22 $1,000.00 $970.00
27507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY4EA $965.35 $625.65 $875.00 $859.02 $975.00 $1,014.22 $1,000.00 $960.00
28509(A) 1326 CLASS AA CONCRETE104CY $701.34 $601.82 $635.00 $703.96 $637.50 $564.65 $680.00 $1,100.00
29509(B) 1328 CLASS A CONCRETE79.8CY $828.64 $615.00 $650.00 $703.96 $665.00 $720.52 $650.00 $840.00
30511(A) 1332 REINFORCING STEEL32,960LB $1.00 $1.02 $0.9000 $1.02 $0.8900 $0.9700 $1.80 $0.7500
31514(A) 6010 PILES, FURNISHED (HP 10X42)89.64LF $40.39 $34.91 $40.00 $29.17 $56.00 $32.24 $25.00 $33.00
32514(A) 6011 PILES, FURNISHED (HP 12X53)246.81LF $41.58 $40.31 $50.00 $36.44 $63.00 $39.30 $35.00 $41.00
33514(B) 6292 PILES, DRIVEN (HP 10X42)89.64LF $13.57 $15.72 $10.00 $20.60 $24.00 $45.08 $35.00 $31.00
34514(B) 6294 PILES, DRIVEN (HP 12X53)246.81LF $16.16 $13.70 $10.00 $20.60 $27.00 $45.08 $35.00 $53.00
35514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
36601(B) 1353 TYPE I-A PLAIN RIPRAP908.64TON $43.81 $33.98 $43.00 $38.46 $38.69 $35.57 $42.00 $46.00
37601(I) 6312 FILTER FABRIC (RIPRAP)1,121.78SY $2.29 $2.32 $1.30 $13.39 $5.50 $2.47 $2.00 $3.30
38619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,685.85 $10,000.00 $10,000.00 $9,270.00 $14,750.00 $18,312.32 $45,000.00 $94,200.00
39880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,556.69 $2,200.00 $2,266.00 $3,500.00 $3,099.01 $5,000.00 $3,300.00
40642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $12,636.02 $5,229.69 $8,360.00 $8,034.00 $10,500.00 $11,973.44 $20,000.00 $16,800.00
41220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,121.08 $2,000.00 $1,250.00 $2,832.50 $3,000.00 $23,453.86 $5,000.00 $5,400.00
42641 1399 MOBILIZATION1LSUM $57,080.47 $15,000.00 $60,000.00 $47,658.51 $50,500.00 $57,754.25 $70,000.00 $78,000.00