| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$17,624.35 |
$8,000.00 |
$4,000.00 |
$7,725.00 |
$10,500.00 |
$16,903.68 |
$30,000.00 |
$58,400.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$43,842.36 |
$43,000.00 |
$45,000.00 |
$47,380.00 |
$52,000.00 |
$50,172.95 |
$130,000.00 |
$153,996.05 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,260 | LF |
$1.74 |
$2.81 |
$2.00 |
$1.64 |
$2.20 |
$2.24 |
$3.00 |
$1.70 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 80 | LF |
$8.86 |
$8.13 |
$14.00 |
$7.36 |
$15.40 |
$10.07 |
$15.00 |
$7.50 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,460 | SY |
$2.86 |
$2.38 |
$7.00 |
$5.15 |
$8.40 |
$7.04 |
$10.00 |
$8.50 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 664 | CY |
$56.43 |
$43.00 |
$48.00 |
$45.87 |
$54.43 |
$22.26 |
$80.00 |
$41.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 123 | TON |
$38.94 |
$25.00 |
$45.00 |
$25.76 |
$28.72 |
$22.26 |
$50.00 |
$93.00 |
| 8 | 407(B) 0250 |
TACK COAT | 273 | GAL |
$4.94 |
$11.62 |
$1.80 |
$10.30 |
$11.00 |
$2.54 |
$10.00 |
$5.00 |
| 9 | 408 5774 |
PRIME COAT | 1,567 | GAL |
$5.02 |
$5.23 |
$2.70 |
$4.64 |
$4.50 |
$3.80 |
$10.00 |
$4.10 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 636 | TON |
$101.74 |
$110.00 |
$73.10 |
$103.00 |
$115.00 |
$102.97 |
$135.00 |
$83.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 422 | TON |
$120.64 |
$130.00 |
$84.30 |
$129.78 |
$141.00 |
$118.75 |
$120.00 |
$83.00 |
| 12 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$35.80 |
$20.77 |
$35.00 |
$24.77 |
$48.00 |
$40.99 |
$55.00 |
$110.00 |
| 13 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$650.00 |
$91.81 |
$300.00 |
$295.40 |
$300.00 |
$138.05 |
$2,000.00 |
$440.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$21.90 |
$19.10 |
$16.00 |
$16.48 |
$19.20 |
$28.17 |
$25.00 |
$17.00 |
| 15 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,778.90 |
$1,524.09 |
$1,355.00 |
$1,395.65 |
$1,626.00 |
$2,465.12 |
$2,500.00 |
$1,400.00 |
| 16 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,295.56 |
$2,109.44 |
$2,200.00 |
$2,266.00 |
$2,640.00 |
$3,099.01 |
$3,000.00 |
$2,300.00 |
| 17 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,041 | LF |
$4.66 |
$6.00 |
$4.85 |
$4.99 |
$6.00 |
$7.04 |
$8.00 |
$5.00 |
| 18 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$184.75 |
$100.00 |
$125.00 |
$206.00 |
$405.00 |
$84.52 |
$300.00 |
$520.00 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 210 | CY |
$17.14 |
$11.12 |
$25.00 |
$15.45 |
$9.25 |
$13.38 |
$25.00 |
$22.00 |
| 20 | 501(G) 6309 |
CLSM BACKFILL | 108 | CY |
$153.89 |
$124.99 |
$155.00 |
$190.80 |
$160.00 |
$207.07 |
$150.00 |
$160.00 |
| 21 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 418.67 | LF |
$245.93 |
$230.00 |
$250.00 |
$215.98 |
$214.00 |
$254.63 |
$250.00 |
$260.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 141.6 | SY |
$181.60 |
$159.72 |
$200.00 |
$166.86 |
$205.00 |
$197.84 |
$150.00 |
$160.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 447.5 | SY |
$7.06 |
$7.00 |
$6.00 |
$7.21 |
$7.70 |
$8.45 |
$12.00 |
$6.50 |
| 24 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 276.4 | LF |
$82.66 |
$68.14 |
$85.00 |
$71.61 |
$74.50 |
$86.28 |
$100.00 |
$64.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 760 | LB |
$2.57 |
$1.85 |
$2.75 |
$3.28 |
$3.00 |
$3.10 |
$3.00 |
$2.60 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$932.84 |
$625.65 |
$875.00 |
$859.02 |
$975.00 |
$1,014.22 |
$1,000.00 |
$970.00 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$965.35 |
$625.65 |
$875.00 |
$859.02 |
$975.00 |
$1,014.22 |
$1,000.00 |
$960.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 104 | CY |
$701.34 |
$601.82 |
$635.00 |
$703.96 |
$637.50 |
$564.65 |
$680.00 |
$1,100.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 79.8 | CY |
$828.64 |
$615.00 |
$650.00 |
$703.96 |
$665.00 |
$720.52 |
$650.00 |
$840.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 32,960 | LB |
$1.00 |
$1.02 |
$0.9000 |
$1.02 |
$0.8900 |
$0.9700 |
$1.80 |
$0.7500 |
| 31 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 89.64 | LF |
$40.39 |
$34.91 |
$40.00 |
$29.17 |
$56.00 |
$32.24 |
$25.00 |
$33.00 |
| 32 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 246.81 | LF |
$41.58 |
$40.31 |
$50.00 |
$36.44 |
$63.00 |
$39.30 |
$35.00 |
$41.00 |
| 33 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 89.64 | LF |
$13.57 |
$15.72 |
$10.00 |
$20.60 |
$24.00 |
$45.08 |
$35.00 |
$31.00 |
| 34 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 246.81 | LF |
$16.16 |
$13.70 |
$10.00 |
$20.60 |
$27.00 |
$45.08 |
$35.00 |
$53.00 |
| 35 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 908.64 | TON |
$43.81 |
$33.98 |
$43.00 |
$38.46 |
$38.69 |
$35.57 |
$42.00 |
$46.00 |
| 37 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,121.78 | SY |
$2.29 |
$2.32 |
$1.30 |
$13.39 |
$5.50 |
$2.47 |
$2.00 |
$3.30 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,685.85 |
$10,000.00 |
$10,000.00 |
$9,270.00 |
$14,750.00 |
$18,312.32 |
$45,000.00 |
$94,200.00 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,556.69 |
$2,200.00 |
$2,266.00 |
$3,500.00 |
$3,099.01 |
$5,000.00 |
$3,300.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,636.02 |
$5,229.69 |
$8,360.00 |
$8,034.00 |
$10,500.00 |
$11,973.44 |
$20,000.00 |
$16,800.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,121.08 |
$2,000.00 |
$1,250.00 |
$2,832.50 |
$3,000.00 |
$23,453.86 |
$5,000.00 |
$5,400.00 |
| 42 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$57,080.47 |
$15,000.00 |
$60,000.00 |
$47,658.51 |
$50,500.00 |
$57,754.25 |
$70,000.00 |
$78,000.00 |