| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$4,000.00 |
$11,164.48 |
$11,000.00 |
$17,500.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$5,582.24 |
$5,500.00 |
$2,500.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,200 | LF |
$5.00 |
$3.19 |
$5.50 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$10.00 |
$12.76 |
$16.50 |
$23.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 668 | SY |
$5.00 |
$2.55 |
$7.70 |
$11.00 |
| 6 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 919 | TON |
$150.00 |
$156.30 |
$163.74 |
$137.00 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 3,648 | SY |
$15.00 |
$8.37 |
$7.32 |
$18.75 |
| 8 | 623 0100 |
(PL)GUARDRAIL CURBING | 3 | EA |
$1,000.00 |
$3,827.82 |
$1,650.00 |
$2,450.00 |
| 9 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 825 | LF |
$30.00 |
$26.72 |
$12.10 |
$13.20 |
| 10 | 501(G) 6309 |
CLSM BACKFILL | 10 | CY |
$300.00 |
$220.10 |
$286.40 |
$250.00 |
| 11 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$71,372.95 |
$37,973.00 |
$24,000.00 |
| 12 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$350.00 |
$279.11 |
$278.07 |
$335.00 |
| 13 | 504(B) 1305 |
SAW-CUT GROOVING | 850.6 | SY |
$5.00 |
$11.16 |
$5.98 |
$6.20 |
| 14 | 504(C) 6250 |
SEALED EXPANSION JOINT | 78 | LF |
$350.00 |
$462.53 |
$477.34 |
$355.00 |
| 15 | 504(E) 6190 |
42" F-SHAPED PARAPET | 403 | LF |
$175.00 |
$119.62 |
$130.79 |
$132.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 3,000 | LB |
$8.00 |
$4.71 |
$13.75 |
$10.45 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$2,000.00 |
$877.21 |
$2,350.26 |
$2,250.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 163.8 | CY |
$950.00 |
$845.31 |
$1,031.52 |
$1,170.00 |
| 19 | 509(D) 1331 |
CLASS C CONCRETE | 5.4 | CY |
$500.00 |
$287.09 |
$529.87 |
$750.00 |
| 20 | 511 6306 |
MECHANICAL SPLICES | 616 | EA |
$30.00 |
$75.76 |
$40.70 |
$35.00 |
| 21 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 56,330 | LB |
$1.20 |
$1.55 |
$1.73 |
$1.15 |
| 22 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$35,000.00 |
$23,923.90 |
$32,936.00 |
$33,000.00 |
| 23 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$10,367.02 |
$3,128.00 |
$4,000.00 |
| 24 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 30 | SY |
$450.00 |
$956.96 |
$597.52 |
$650.00 |
| 25 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 5 | SY |
$700.00 |
$1,116.45 |
$1,068.07 |
$1,100.00 |
| 26 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 416 | SY |
$5.00 |
$3.75 |
$4.43 |
$4.20 |
| 27 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 8.4 | SY |
$850.00 |
$1,093.85 |
$931.50 |
$1,000.00 |
| 28 | 523(A) 6550 |
SEALER CRACK PREPARATION | 325.5 | LF |
$5.00 |
$57.42 |
$4.03 |
$4.80 |
| 29 | 523(B) 6560 |
SEALER RESIN | 4 | GAL |
$150.00 |
$239.24 |
$115.00 |
$180.00 |
| 30 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$3,987.32 |
$1,150.00 |
$7,500.00 |
| 31 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | EA |
$1,000.00 |
$131.99 |
$406.79 |
$2,000.00 |
| 32 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 5 | EA |
$2,000.00 |
$1,152.52 |
$4,122.75 |
$5,300.00 |
| 33 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 4 | EA |
$1,000.00 |
$2,923.63 |
$2,152.20 |
$3,500.00 |
| 34 | 545 4825 |
(PL)REPLACE BRIDGE ITEM (TYPE B) | 10 | EA |
$300.00 |
$2,519.98 |
$166.18 |
$140.00 |
| 35 | 545 4835 |
(PL)REPLACE BRIDGE ITEM (TYPE C) | 2 | EA |
$3,000.00 |
$3,668.33 |
$2,695.89 |
$1,750.00 |
| 36 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$120,000.00 |
$61,404.67 |
$175,030.00 |
$175,000.00 |
| 37 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 1,790 | LF |
$1.00 |
$0.9900 |
$1.78 |
$1.00 |
| 38 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 3,450 | LF |
$1.25 |
$2.90 |
$2.00 |
$2.20 |
| 39 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 75 | SD |
$11.00 |
$6.38 |
$4.40 |
$5.00 |
| 40 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,590 | LF |
$35.00 |
$25.52 |
$17.60 |
$23.00 |
| 41 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,487.5 | LF |
$10.00 |
$2.63 |
$1.82 |
$3.00 |
| 42 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 75 | SD |
$10.00 |
$3.19 |
$2.20 |
$2.50 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,950.00 |
$26,316.29 |
$18,150.00 |
$26,000.00 |
| 44 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 720 | HOUR |
$60.00 |
$103.67 |
$93.50 |
$72.00 |
| 45 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 267 | SD |
$15.00 |
$9.57 |
$6.60 |
$10.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$12,759.41 |
$8,800.00 |
$11,500.00 |
| 47 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$76,000.00 |
$58,637.47 |
$85,617.51 |
$131,000.00 |