| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$82,500.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 50 | CY |
$15.00 |
$22.00 |
$17.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10 | CY |
$15.00 |
$82.50 |
$30.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 450 | LF |
$3.00 |
$3.30 |
$3.50 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 225 | SY |
$5.00 |
$9.90 |
$5.00 |
| 6 | 310(B) 0149 |
SUBGRADE, METHOD B | 62 | SY |
$10.00 |
$55.00 |
$19.00 |
| 7 | 407(B) 0250 |
TACK COAT | 230 | GAL |
$5.00 |
$4.40 |
$6.00 |
| 8 | 408 5774 |
PRIME COAT | 22 | GAL |
$15.00 |
$7.70 |
$20.00 |
| 9 | 409(A) 4242 |
FABRIC REINFORCEMENT | 15 | SY |
$10.00 |
$127.16 |
$30.00 |
| 10 | 409(B) 4268 |
BITUMINOUS BINDER | 3 | GAL |
$10.00 |
$660.00 |
$30.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 285 | TON |
$105.00 |
$104.50 |
$155.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 1,468 | SY |
$7.00 |
$15.40 |
$8.25 |
| 13 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 54 | LF |
$25.00 |
$58.31 |
$30.00 |
| 14 | 609(B) 1526 |
2'-8" COMB. CURB & GUTTER (8" BARRIER) | 23 | LF |
$30.00 |
$69.31 |
$30.00 |
| 15 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 143 | SY |
$75.00 |
$77.19 |
$79.00 |
| 16 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 103 | SF |
$35.00 |
$37.38 |
$36.00 |
| 17 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 138 | LF |
$5.00 |
$5.50 |
$5.00 |
| 18 | 619(B) 4791 |
REMOVAL OF CURB | 64 | LF |
$10.00 |
$5.50 |
$8.00 |
| 19 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 51 | SY |
$15.00 |
$11.00 |
$19.00 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 481 | LF |
$5.00 |
$8.80 |
$7.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 135 | CY |
$200.00 |
$226.55 |
$174.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 401.8 | SY |
$190.00 |
$261.18 |
$184.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 1,660 | SY |
$4.00 |
$3.91 |
$9.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 137.5 | LF |
$300.00 |
$308.18 |
$265.00 |
| 25 | 504(E) 1381 |
CONCRETE PARAPET | 428.7 | LF |
$90.00 |
$109.56 |
$121.00 |
| 26 | 504(F) 6006 |
HANDRAILING | 408.2 | LF |
$130.00 |
$163.44 |
$148.00 |
| 27 | 506(A) 1322 |
STRUCTURAL STEEL | 6,470 | LB |
$4.00 |
$7.59 |
$7.00 |
| 28 | 509 6152 |
SPECIAL CONCRETE FINISH | 983 | SY |
$35.00 |
$51.75 |
$56.00 |
| 29 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$7,500.00 |
$15,757.30 |
$18,000.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 404.3 | CY |
$600.00 |
$858.82 |
$760.00 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 1.5 | CY |
$800.00 |
$4,745.82 |
$2,000.00 |
| 32 | 510(C) 6138 |
SLOPE WALL (5") | 26 | SY |
$250.00 |
$98.58 |
$200.00 |
| 33 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 117,320 | LB |
$1.10 |
$1.45 |
$1.25 |
| 34 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$70,000.00 |
$57,271.15 |
$62,000.00 |
| 35 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$35,000.00 |
$3,220.00 |
$3,500.00 |
| 36 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 632 | SY |
$4.00 |
$3.68 |
$6.00 |
| 37 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$40.00 |
$46.00 |
$50.00 |
| 38 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 8 | GAL |
$100.00 |
$57.50 |
$62.00 |
| 39 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$700.00 |
$905.05 |
$980.00 |
| 40 | 523(A) 6550 |
SEALER CRACK PREPARATION | 131.2 | LF |
$5.00 |
$3.45 |
$6.00 |
| 41 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$110.00 |
$115.00 |
$178.00 |
| 42 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 21 | EA |
$500.00 |
$2,903.67 |
$682.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$120,000.00 |
$165,887.50 |
$300,000.00 |
| 44 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$150.00 |
$275.00 |
$164.00 |
| 45 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 14 | EA |
$12.00 |
$13.20 |
$12.00 |
| 46 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$12.00 |
$13.20 |
$12.00 |
| 47 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,800 | LF |
$0.6000 |
$0.3600 |
$2.10 |
| 48 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 290 | LF |
$3.00 |
$4.40 |
$5.35 |
| 49 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 110 | LF |
$12.00 |
$12.10 |
$10.65 |
| 50 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 6 | EA |
$100.00 |
$165.00 |
$112.50 |
| 51 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 6,366 | LF |
$1.25 |
$0.3900 |
$2.10 |
| 52 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 327 | LF |
$2.50 |
$2.20 |
$3.55 |
| 53 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 252 | LF |
$15.00 |
$11.00 |
$10.65 |
| 54 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 4 | EA |
$350.00 |
$247.50 |
$112.45 |
| 55 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 6 | EA |
$300.00 |
$247.50 |
$242.65 |
| 56 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,500 | LF |
$1.00 |
$1.55 |
$1.50 |
| 57 | 871(A) 8330 |
(PL) IMPACT ATTENUATOR | 2 | EA |
$30,000.00 |
$33,616.00 |
$46,800.00 |
| 58 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,090 | SD |
$16.00 |
$22.00 |
$11.85 |
| 59 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 30 | SD |
$100.00 |
$22.00 |
$65.25 |
| 60 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,575 | LF |
$30.00 |
$20.37 |
$30.00 |
| 61 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,325 | LF |
$5.00 |
$2.13 |
$5.00 |
| 62 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 2,180 | SD |
$10.00 |
$1.10 |
$9.50 |
| 63 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 57,780 | SD |
$0.7500 |
$0.1700 |
$0.3000 |
| 64 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,190 | SD |
$1.50 |
$1.87 |
$0.1000 |
| 65 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 25,120 | SD |
$2.00 |
$1.87 |
$0.4500 |
| 66 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 18,860 | SD |
$1.00 |
$0.1100 |
$0.2500 |
| 67 | 880(C) 8848 |
WING BARRICADES | 2,680 | SD |
$1.00 |
$2.20 |
$0.1500 |
| 68 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 55,080 | SD |
$0.4000 |
$0.2200 |
$0.5000 |
| 69 | 880(F) 8878 |
DRUMS | 75,380 | SD |
$0.3000 |
$0.1100 |
$0.7500 |
| 70 | 880(G) 8884 |
TUBE CHANNELIZERS | 1,400 | SD |
$0.2000 |
$1.10 |
$0.7500 |
| 71 | 880(G) 8890 |
CHANNELIZER CONES | 10,500 | SD |
$0.2000 |
$0.1100 |
$0.7500 |
| 72 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 500 | HOUR |
$100.00 |
$93.50 |
$75.00 |
| 73 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 940 | SD |
$15.00 |
$7.70 |
$35.50 |
| 74 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$39,000.00 |
$27,500.00 |
$35,000.00 |
| 75 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$230,000.00 |
$237,703.28 |
$250,000.00 |
| 76 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$20.00 |
$22.00 |
$17.00 |
| 77 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$60.00 |
$93.50 |
$30.00 |
| 78 | 221(C) 2801 |
TEMPORARY SILT FENCE | 520 | LF |
$3.00 |
$3.30 |
$3.50 |
| 79 | 230(A) 2806 |
SOLID SLAB SODDING | 350 | SY |
$6.00 |
$9.90 |
$5.00 |
| 80 | 310(B) 0149 |
SUBGRADE, METHOD B | 476 | SY |
$4.00 |
$8.80 |
$10.15 |
| 81 | 407(B) 0250 |
TACK COAT | 184 | GAL |
$5.00 |
$4.40 |
$6.00 |
| 82 | 408 5774 |
PRIME COAT | 167 | GAL |
$7.00 |
$6.60 |
$15.00 |
| 83 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 103 | TON |
$400.00 |
$128.70 |
$154.00 |
| 84 | 412 5267 |
COLD MILLING PAVEMENT | 1,225 | SY |
$15.00 |
$11.00 |
$8.50 |
| 85 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 476 | SY |
$30.00 |
$88.46 |
$33.00 |
| 86 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 133 | CY |
$160.00 |
$198.06 |
$185.00 |
| 87 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 200 | LF |
$30.00 |
$69.31 |
$30.00 |
| 88 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 58 | SY |
$50.00 |
$71.50 |
$60.00 |
| 89 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$500.00 |
$1,100.00 |
$600.00 |
| 90 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,391 | LF |
$8.00 |
$5.50 |
$8.00 |
| 91 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 325 | SY |
$15.00 |
$11.00 |
$19.00 |
| 92 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 500 | LF |
$6.00 |
$5.50 |
$8.00 |
| 93 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 214 | SY |
$12.00 |
$8.80 |
$19.00 |
| 94 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$20.00 |
$16.78 |
$19.00 |
| 95 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,194.50 |
$2,375.00 |
| 96 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,512.20 |
$1,630.00 |
| 97 | 501(G) 6309 |
CLSM BACKFILL | 12 | CY |
$180.00 |
$226.55 |
$175.00 |
| 98 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$27,404.50 |
$23,000.00 |
| 99 | 504(A) 1304 |
APPROACH SLAB | 219.8 | SY |
$220.00 |
$264.42 |
$200.00 |
| 100 | 504(B) 1305 |
SAW-CUT GROOVING | 834 | SY |
$6.00 |
$3.91 |
$9.00 |
| 101 | 504(C) 6250 |
SEALED EXPANSION JOINT | 59.5 | LF |
$350.00 |
$423.18 |
$301.00 |
| 102 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 528 | LF |
$120.00 |
$136.94 |
$115.00 |
| 103 | 506(A) 1322 |
STRUCTURAL STEEL | 80 | LB |
$10.00 |
$50.60 |
$30.00 |
| 104 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$2,467.76 |
$1,380.00 |
| 105 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$2,230.96 |
$625.00 |
| 106 | 509(A) 1326 |
CLASS AA CONCRETE | 145.7 | CY |
$1,000.00 |
$836.97 |
$1,050.00 |
| 107 | 510(C) 6138 |
SLOPE WALL (5") | 48 | SY |
$120.00 |
$98.58 |
$225.00 |
| 108 | 511(A) 1332 |
REINFORCING STEEL | 360 | LB |
$1.20 |
$1.61 |
$1.10 |
| 109 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 44,880 | LB |
$1.50 |
$1.33 |
$1.15 |
| 110 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$38,450.25 |
$42,000.00 |
| 111 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,082.00 |
$3,500.00 |
| 112 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 396 | SY |
$4.50 |
$3.68 |
$6.00 |
| 113 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$46.00 |
$50.00 |
| 114 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$120.00 |
$57.50 |
$62.00 |
| 115 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$905.05 |
$978.00 |
| 116 | 523(A) 6550 |
SEALER CRACK PREPARATION | 61 | LF |
$6.00 |
$3.45 |
$6.00 |
| 117 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$115.00 |
$180.00 |
| 118 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$8,000.00 |
$1,725.00 |
$6,500.00 |
| 119 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$60.00 |
$63.25 |
$68.00 |
| 120 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$165,887.50 |
$220,000.00 |
| 121 | 501(G) 6309 |
CLSM BACKFILL | 12 | CY |
$180.00 |
$226.55 |
$175.00 |
| 122 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$26,887.00 |
$23,000.00 |
| 123 | 504(A) 1304 |
APPROACH SLAB | 219.8 | SY |
$220.00 |
$264.42 |
$200.00 |
| 124 | 504(B) 1305 |
SAW-CUT GROOVING | 834 | SY |
$6.00 |
$3.91 |
$9.00 |
| 125 | 504(C) 6250 |
SEALED EXPANSION JOINT | 59.5 | LF |
$350.00 |
$350.75 |
$300.00 |
| 126 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 528 | LF |
$120.00 |
$136.94 |
$115.00 |
| 127 | 506(A) 1322 |
STRUCTURAL STEEL | 80 | LB |
$10.00 |
$52.78 |
$30.00 |
| 128 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$2,467.76 |
$1,400.00 |
| 129 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$2,230.96 |
$1,200.00 |
| 130 | 509(A) 1326 |
CLASS AA CONCRETE | 145.7 | CY |
$1,000.00 |
$836.97 |
$1,050.00 |
| 131 | 510(C) 6138 |
SLOPE WALL (5") | 48 | SY |
$120.00 |
$98.58 |
$225.00 |
| 132 | 511(A) 1332 |
REINFORCING STEEL | 360 | LB |
$1.20 |
$1.61 |
$1.05 |
| 133 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 44,880 | LB |
$1.50 |
$1.45 |
$1.25 |
| 134 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$38,450.25 |
$42,000.00 |
| 135 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,082.00 |
$3,500.00 |
| 136 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 396 | SY |
$4.50 |
$3.68 |
$6.00 |
| 137 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$46.00 |
$50.00 |
| 138 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$120.00 |
$57.50 |
$62.00 |
| 139 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$905.05 |
$980.00 |
| 140 | 523(A) 6550 |
SEALER CRACK PREPARATION | 61 | LF |
$6.00 |
$3.45 |
$6.00 |
| 141 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$115.00 |
$175.00 |
| 142 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$8,000.00 |
$1,725.00 |
$6,500.00 |
| 143 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$60.00 |
$63.25 |
$68.00 |
| 144 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$188,887.50 |
$220,000.00 |
| 145 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$20.00 |
$27.50 |
$20.00 |
| 146 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$60.00 |
$82.50 |
$30.00 |
| 147 | 221(C) 2801 |
TEMPORARY SILT FENCE | 760 | LF |
$3.00 |
$3.30 |
$3.00 |
| 148 | 230(A) 2806 |
SOLID SLAB SODDING | 500 | SY |
$6.00 |
$9.90 |
$5.00 |
| 149 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 268 | SY |
$40.00 |
$55.00 |
$35.00 |
| 150 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 67 | CY |
$160.00 |
$189.50 |
$195.00 |
| 151 | 509(D) 0325 |
CLASS C CONCRETE | 12 | CY |
$600.00 |
$428.04 |
$465.00 |
| 152 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$8,250.00 |
$15,000.00 |
| 153 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 280 | SY |
$20.00 |
$22.00 |
$25.00 |
| 154 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 650 | LF |
$6.00 |
$5.50 |
$8.00 |
| 155 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$20.00 |
$16.78 |
$18.00 |
| 156 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,194.50 |
$2,400.00 |
| 157 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,512.50 |
$1,650.00 |
| 158 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 7 | CY |
$100.00 |
$115.00 |
$20.00 |
| 159 | 501(G) 6309 |
CLSM BACKFILL | 6 | CY |
$180.00 |
$222.92 |
$175.00 |
| 160 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$28,750.00 |
$75,000.00 |
| 161 | 504(A) 1304 |
APPROACH SLAB | 147.6 | SY |
$220.00 |
$260.04 |
$275.00 |
| 162 | 504(B) 1305 |
SAW-CUT GROOVING | 893 | SY |
$6.00 |
$3.91 |
$9.00 |
| 163 | 504(C) 6250 |
SEALED EXPANSION JOINT | 59.5 | LF |
$350.00 |
$416.90 |
$290.00 |
| 164 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 572.7 | LF |
$120.00 |
$107.17 |
$115.00 |
| 165 | 506(A) 1322 |
STRUCTURAL STEEL | 2,390 | LB |
$10.00 |
$12.67 |
$7.50 |
| 166 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$2,054.33 |
$1,300.00 |
| 167 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$1,957.87 |
$1,200.00 |
| 168 | 509(A) 1326 |
CLASS AA CONCRETE | 207.5 | CY |
$1,000.00 |
$946.08 |
$1,400.00 |
| 169 | 510(C) 6138 |
SLOPE WALL (5") | 32 | SY |
$120.00 |
$82.49 |
$255.00 |
| 170 | 511(A) 1332 |
REINFORCING STEEL | 440 | LB |
$1.20 |
$1.60 |
$1.10 |
| 171 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 64,330 | LB |
$1.50 |
$1.31 |
$1.15 |
| 172 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$39,711.80 |
$43,000.00 |
| 173 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,082.00 |
$3,500.00 |
| 174 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 412 | SY |
$4.50 |
$3.68 |
$6.00 |
| 175 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 60 | LF |
$50.00 |
$46.00 |
$50.00 |
| 176 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 6 | GAL |
$120.00 |
$57.50 |
$62.00 |
| 177 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 15 | SY |
$600.00 |
$736.00 |
$795.00 |
| 178 | 523(A) 6550 |
SEALER CRACK PREPARATION | 121 | LF |
$6.00 |
$3.45 |
$6.00 |
| 179 | 523(B) 6560 |
SEALER RESIN | 1.5 | GAL |
$200.00 |
$115.00 |
$175.00 |
| 180 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 15 | SY |
$60.00 |
$63.25 |
$68.00 |
| 181 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$183,137.50 |
$243,000.00 |