| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 77 | CY |
$15.00 |
$16.20 |
$14.00 |
$72.50 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,871 | CY |
$12.00 |
$14.85 |
$12.00 |
$20.50 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,950 | LF |
$2.00 |
$2.16 |
$2.50 |
$1.50 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 5,008 | SY |
$1.50 |
$2.70 |
$2.10 |
$2.50 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 145 | CY |
$80.00 |
$67.33 |
$90.00 |
$99.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 90 | TON |
$40.00 |
$107.46 |
$99.50 |
$110.00 |
| 7 | 407(B) 0250 |
TACK COAT | 1,526 | GAL |
$3.00 |
$4.86 |
$4.50 |
$5.00 |
| 8 | 408 5774 |
PRIME COAT | 424 | GAL |
$5.00 |
$4.86 |
$4.50 |
$5.00 |
| 9 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,035 | TON |
$105.00 |
$147.96 |
$137.00 |
$150.70 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 129 | TON |
$100.00 |
$149.96 |
$137.00 |
$150.70 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 4,850 | SY |
$8.00 |
$5.72 |
$5.80 |
$8.50 |
| 12 | 509(A) 0319 |
CLASS AA CONCRETE | 76 | CY |
$500.00 |
$487.61 |
$411.35 |
$475.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$490.51 |
$604.60 |
$612.50 |
| 14 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 4,940 | LB |
$1.25 |
$1.44 |
$1.30 |
$1.41 |
| 15 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 230 | SY |
$5.00 |
$10.80 |
$10.00 |
$10.00 |
| 16 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,730 | LF |
$3.00 |
$14.04 |
$1.65 |
$3.75 |
| 17 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,200.00 |
$1,620.00 |
$850.00 |
$1,200.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,150 | LF |
$18.00 |
$16.74 |
$15.95 |
$16.50 |
| 19 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,052.00 |
$2,200.00 |
$2,200.00 |
| 20 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,000.00 |
$1,512.00 |
$1,650.00 |
$1,600.00 |
| 21 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 74 | CY |
$30.00 |
$22.00 |
$20.87 |
$20.00 |
| 22 | 501(G) 6309 |
CLSM BACKFILL | 150 | CY |
$160.00 |
$110.80 |
$490.02 |
$150.00 |
| 23 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$60,000.00 |
$45,137.40 |
$66,000.00 |
$58,000.00 |
| 24 | 504(A) 1304 |
APPROACH SLAB | 279 | SY |
$220.00 |
$206.17 |
$200.65 |
$262.00 |
| 25 | 504(B) 1305 |
SAW-CUT GROOVING | 1,166 | SY |
$4.60 |
$4.40 |
$4.00 |
$4.40 |
| 26 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84.34 | LF |
$400.00 |
$267.60 |
$371.87 |
$305.00 |
| 27 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 538 | LF |
$90.00 |
$91.49 |
$75.00 |
$95.50 |
| 28 | 504(E) 6190 |
42" F-SHAPED PARAPET | 155 | LF |
$100.00 |
$117.17 |
$78.00 |
$146.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 853 | LB |
$4.00 |
$13.42 |
$8.50 |
$8.00 |
| 30 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,200.00 |
$1,391.57 |
$1,727.05 |
$2,000.00 |
| 31 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,200.00 |
$1,391.57 |
$1,736.76 |
$2,000.00 |
| 32 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$20,000.00 |
$16,470.30 |
$32,000.00 |
$16,500.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 261 | CY |
$620.00 |
$826.64 |
$800.00 |
$925.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 25 | CY |
$675.00 |
$826.64 |
$850.00 |
$750.00 |
| 35 | 510(C) 6138 |
SLOPE WALL (5") | 1,274 | SY |
$100.00 |
$82.84 |
$100.40 |
$99.00 |
| 36 | 511 6306 |
MECHANICAL SPLICES | 34 | EA |
$60.00 |
$40.44 |
$60.00 |
$49.00 |
| 37 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 79,270 | LB |
$1.20 |
$1.13 |
$1.15 |
$1.08 |
| 38 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$30,000.00 |
$32,604.00 |
$46,200.00 |
$33,200.00 |
| 39 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$10,000.00 |
$5,847.60 |
$28,700.00 |
$6,000.00 |
| 40 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 754 | SY |
$4.00 |
$3.85 |
$3.50 |
$3.85 |
| 41 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 89 | LF |
$40.00 |
$44.00 |
$34.00 |
$44.00 |
| 42 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10.4 | GAL |
$100.00 |
$22.00 |
$100.00 |
$22.00 |
| 43 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 46 | SY |
$600.00 |
$616.00 |
$590.00 |
$620.00 |
| 44 | 523(A) 6550 |
SEALER CRACK PREPARATION | 79.6 | LF |
$4.90 |
$5.50 |
$5.00 |
$5.50 |
| 45 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$125.00 |
$165.00 |
$150.00 |
$165.00 |
| 46 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 470 | SF |
$70.00 |
$48.16 |
$37.00 |
$49.50 |
| 47 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 112 | SY |
$50.00 |
$47.30 |
$28.00 |
$49.00 |
| 48 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$8,000.00 |
$9,625.34 |
$8,891.29 |
$14,000.00 |
| 49 | 540 4520 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | LSUM |
$18,000.00 |
$22,562.47 |
$6,945.21 |
$18,500.00 |
| 50 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 3 | EA |
$3,000.00 |
$3,151.50 |
$1,976.39 |
$2,650.00 |
| 51 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 80 | LF |
$30.00 |
$27.50 |
$30.53 |
$33.00 |
| 52 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$26.00 |
$27.50 |
$21.79 |
$28.00 |
| 53 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$154,000.00 |
$142,500.00 |
$250,000.00 |
| 54 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$150.00 |
$54.00 |
$850.00 |
$60.00 |
| 55 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 28 | SF |
$30.00 |
$16.20 |
$100.00 |
$17.50 |
| 56 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 27 | EA |
$11.00 |
$10.80 |
$12.00 |
$10.00 |
| 57 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,000 | LF |
$1.00 |
$1.08 |
$0.8500 |
$1.10 |
| 58 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 1,320 | LF |
$1.00 |
$1.08 |
$2.00 |
$1.65 |
| 59 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,260 | LF |
$0.2500 |
$0.2700 |
$0.4400 |
$0.3000 |
| 60 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,330 | LF |
$0.5000 |
$0.2700 |
$0.4200 |
$0.3000 |
| 61 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$18,000.00 |
$19,440.00 |
$19,750.00 |
$22,500.00 |
| 62 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$12.00 |
$5.40 |
$8.00 |
$5.50 |
| 63 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,150 | LF |
$25.00 |
$41.79 |
$25.00 |
$34.00 |
| 64 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,150 | LF |
$5.00 |
$4.32 |
$1.50 |
$5.65 |
| 65 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$3.50 |
$5.40 |
$1.00 |
$5.50 |
| 66 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,760 | SD |
$0.3500 |
$0.2700 |
$0.0500 |
$0.3000 |
| 67 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,570 | SD |
$0.7000 |
$1.08 |
$0.6000 |
$1.10 |
| 68 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,310 | SD |
$1.70 |
$1.62 |
$0.6500 |
$1.65 |
| 69 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,900 | SD |
$1.10 |
$2.16 |
$6.00 |
$2.25 |
| 70 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.05 |
$0.5400 |
$1.00 |
$0.6000 |
| 71 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,800 | SD |
$0.3000 |
$0.1100 |
$0.2500 |
$0.1200 |
| 72 | 880(F) 8878 |
DRUMS | 9,200 | SD |
$0.2000 |
$0.2700 |
$0.0500 |
$0.3000 |
| 73 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$15.00 |
$16.20 |
$15.00 |
$17.50 |
| 74 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$10,450.00 |
$12,600.00 |
$13,500.00 |
| 75 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,780.00 |
$8,000.00 |
$6,000.00 |
| 76 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$111,460.09 |
$121,049.43 |
$154,500.00 |
$96,000.00 |