| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$350,000.00 |
$411,950.00 |
$565,000.00 |
$635,440.58 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,825 | LF |
$1.75 |
$1.29 |
$1.98 |
$1.24 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,400 | LF |
$7.50 |
$6.48 |
$9.90 |
$6.24 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 76,520 | SY |
$1.21 |
$1.24 |
$1.50 |
$1.20 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 15.81 | AC |
$550.00 |
$536.80 |
$440.00 |
$514.99 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 22,709 | CY |
$40.00 |
$38.28 |
$44.50 |
$54.99 |
| 7 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 15,884 | LF |
$4.00 |
$5.86 |
$5.00 |
$10.84 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 479 | TON |
$35.00 |
$35.20 |
$25.00 |
$30.15 |
| 9 | 407(B) 0250 |
TACK COAT | 4,160 | GAL |
$5.00 |
$5.23 |
$5.22 |
$3.71 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,251 | TON |
$80.00 |
$77.00 |
$78.38 |
$83.18 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,528 | TON |
$80.00 |
$82.50 |
$85.32 |
$85.83 |
| 12 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 4 | EAGP |
$900.00 |
$4.40 |
$1,100.00 |
$1,179.24 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 134.32 | CY |
$350.00 |
$412.50 |
$350.00 |
$329.07 |
| 14 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 56 | LF |
$120.00 |
$145.20 |
$150.00 |
$148.90 |
| 15 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 144 | LF |
$150.00 |
$195.80 |
$200.00 |
$200.71 |
| 16 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 198 | LF |
$170.00 |
$195.80 |
$190.00 |
$180.27 |
| 17 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 876 | LF |
$30.00 |
$34.10 |
$55.00 |
$55.22 |
| 18 | 613(B) 4532 |
57" X 38" CORR. GALV. STEEL PIPE ARCH | 134 | LF |
$45.00 |
$64.90 |
$115.00 |
$97.87 |
| 19 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,900.00 |
$1,853.50 |
$2,350.00 |
$2,256.73 |
| 20 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,100.00 |
$1,424.50 |
$1,500.00 |
$1,630.19 |
| 21 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,650.00 |
$2,233.00 |
$2,100.00 |
$2,193.21 |
| 22 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 12 | EA |
$1,200.00 |
$1,265.00 |
$1,250.00 |
$1,372.14 |
| 23 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$1,450.00 |
$1,677.50 |
$2,250.00 |
$2,346.15 |
| 24 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 6 | EA |
$1,750.00 |
$1,842.50 |
$1,700.00 |
$1,858.33 |
| 25 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 62.15 | SF |
$25.00 |
$25.30 |
$22.00 |
$21.19 |
| 26 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 144 | LF |
$15.00 |
$8.80 |
$11.00 |
$10.60 |
| 27 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 61,315 | LF |
$0.5000 |
$0.4700 |
$0.4700 |
$0.4800 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$18,012.50 |
$8,250.00 |
$13,775.42 |
| 29 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 771 | CY |
$10.00 |
$11.00 |
$15.00 |
$11.26 |
| 30 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 112 | CY |
$10.00 |
$11.00 |
$15.00 |
$5.30 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 233.4 | CY |
$500.00 |
$547.99 |
$525.00 |
$493.05 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 37,496.63 | LB |
$1.00 |
$1.08 |
$0.7500 |
$0.9500 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 346 | TON |
$40.00 |
$48.95 |
$35.00 |
$53.61 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 114 | TON |
$36.00 |
$34.10 |
$30.00 |
$32.14 |
| 35 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1 | LF |
$5,000.00 |
$5,500.00 |
$5,000.00 |
$2,864.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$84,920.00 |
$58,250.00 |
$34,300.81 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$5,500.00 |
$7,500.00 |
$24,316.80 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$195,271.41 |
$200,000.00 |
$85,069.79 |