| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$13,641.25 |
$11,000.00 |
$15,000.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,002 | CY |
$9.00 |
$7.20 |
$16.50 |
$15.00 |
$15.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,618 | LF |
$2.00 |
$2.99 |
$1.47 |
$1.34 |
$1.34 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 64 | LF |
$8.00 |
$31.64 |
$7.65 |
$6.95 |
$6.95 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,348 | SY |
$2.20 |
$1.54 |
$1.36 |
$1.24 |
$1.24 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 827 | CY |
$39.00 |
$47.00 |
$66.58 |
$48.00 |
$45.00 |
| 7 | 325 5271 |
SEPARATOR FABRIC | 3,059 | SY |
$1.20 |
$1.14 |
$1.74 |
$1.00 |
$2.00 |
| 8 | 407(B) 0250 |
TACK COAT | 219 | GAL |
$2.60 |
$3.00 |
$3.85 |
$3.50 |
$3.00 |
| 9 | 408 5774 |
PRIME COAT | 1,800 | GAL |
$6.00 |
$2.00 |
$6.05 |
$5.50 |
$7.80 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 654 | TON |
$62.00 |
$69.50 |
$74.80 |
$68.00 |
$84.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 327 | TON |
$99.00 |
$90.50 |
$88.00 |
$80.00 |
$99.50 |
| 12 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$12,836.74 |
$4,950.00 |
$3,000.00 |
$5,000.00 |
| 13 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$615.00 |
$416.44 |
$770.00 |
$500.00 |
$750.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 687.5 | LF |
$17.00 |
$21.58 |
$18.15 |
$17.50 |
$13.50 |
| 15 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,475.00 |
$1,819.04 |
$2,106.50 |
$1,475.00 |
$1,900.00 |
| 16 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,226.00 |
$2,713.14 |
$2,475.00 |
$2,200.00 |
$2,200.00 |
| 17 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 205 | CY |
$10.00 |
$17.86 |
$22.00 |
$25.00 |
$40.00 |
| 18 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 547 | CY |
$13.00 |
$41.00 |
$16.50 |
$25.00 |
$25.00 |
| 19 | 501(F) 6352 |
GRANULAR BACKFILL | 129 | CY |
$59.00 |
$42.80 |
$91.11 |
$60.00 |
$60.00 |
| 20 | 508 6359 |
PRECAST ARCH CULVERT | 30.75 | LF |
$1,850.00 |
$3,828.26 |
$3,894.03 |
$4,200.00 |
$6,500.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 273 | CY |
$490.00 |
$455.25 |
$468.02 |
$700.00 |
$695.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 26,454 | LB |
$1.00 |
$0.7700 |
$1.03 |
$1.00 |
$0.7500 |
| 23 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,861 | LB |
$1.50 |
$5.06 |
$1.89 |
$2.00 |
$2.00 |
| 24 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 100 | SY |
$4.60 |
$6.17 |
$11.00 |
$5.00 |
$5.00 |
| 25 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$19,680.93 |
$16,500.00 |
$13,000.00 |
$20,000.00 |
| 26 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,200 | LF |
$1.50 |
$0.9200 |
$0.8300 |
$0.8200 |
$0.7500 |
| 27 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,514.75 |
$3,135.00 |
$2,500.00 |
$2,850.00 |
| 28 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$13,565.71 |
$12,100.00 |
$9,930.00 |
$5,900.00 |
| 29 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$1,200.00 |
$3,300.00 |
$1,200.00 |
$5,000.00 |
| 30 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$52,000.00 |
$14,798.96 |
$61,104.10 |
$50,000.00 |
$57,800.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 499 | TON |
$43.00 |
$37.95 |
$47.73 |
$36.00 |
$29.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 167 | TON |
$36.00 |
$31.94 |
$35.15 |
$25.00 |
$23.00 |
| 33 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 665 | SY |
$2.00 |
$13.53 |
$1.98 |
$0.9700 |
$2.00 |