| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$27,000.00 |
$29,750.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 420 | LF |
$2.00 |
$1.60 |
$1.75 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$8.00 |
$10.30 |
$11.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 4,900 | SY |
$2.00 |
$1.40 |
$1.63 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.13 | AC |
$650.00 |
$700.00 |
$200.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 422 | TON |
$32.00 |
$40.00 |
$38.38 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$300.00 |
$312.50 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 161 | LF |
$30.00 |
$40.00 |
$33.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,100.00 |
$1,300.00 |
$1,150.00 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 310 | CY |
$15.00 |
$11.00 |
$10.25 |
| 11 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 310 | CY |
$9.36 |
$16.00 |
$11.25 |
| 12 | 506(A) 1322 |
STRUCTURAL STEEL | 14,994 | LB |
$2.20 |
$4.00 |
$4.25 |
| 13 | 509(A) 1326 |
CLASS AA CONCRETE | 50.4 | CY |
$550.00 |
$700.00 |
$650.00 |
| 14 | 511(A) 1332 |
REINFORCING STEEL | 8,990 | LB |
$1.00 |
$1.00 |
$0.9700 |
| 15 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$20,200.00 |
| 16 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,500.00 |
$3,500.00 |
$2,150.00 |
| 17 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,540 | LF |
$32.00 |
$42.00 |
$31.50 |
| 18 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,540 | LF |
$12.00 |
$11.00 |
$13.50 |
| 19 | 514(H) 6355 |
SHEET PILING, FURNISHED | 245 | SY |
$50.00 |
$88.00 |
$98.00 |
| 20 | 514(I) 6360 |
SHEET PILING, DRIVEN | 245 | SY |
$10.00 |
$36.00 |
$42.00 |
| 21 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 22 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$26,000.00 |
| 23 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 180 | TON |
$40.00 |
$60.00 |
$50.95 |
| 24 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 60 | TON |
$35.00 |
$50.00 |
$43.63 |
| 25 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$13,000.00 |
$8,500.00 |
| 26 | 623(B) 1200 |
BEAM GUARDRAIL W-BEAM DOUBLE | 150 | LF |
$25.00 |
$125.00 |
$143.75 |
| 27 | 623(F) 6032 |
GUARDRAIL ANCHOR UNIT (TYPE I) | 4 | EA |
$2,000.00 |
$1,150.00 |
$1,322.50 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$2,600.00 |
$2,700.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$4,000.00 |
$7,000.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$42,000.00 |
$28,300.00 |