| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$32,500.00 |
$9,000.00 |
$10,000.00 |
$14,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$36,500.00 |
$27,000.00 |
$18,000.00 |
$27,500.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,200 | LF |
$3.00 |
$1.56 |
$1.40 |
$3.00 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$9.00 |
$33.72 |
$8.00 |
$6.00 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,970 | SY |
$3.25 |
$2.30 |
$1.99 |
$3.00 |
$2.25 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 440 | CY |
$50.00 |
$50.00 |
$65.00 |
$60.00 |
$81.50 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20 | TON |
$40.00 |
$20.68 |
$35.00 |
$50.00 |
$51.00 |
| 8 | 407(B) 0250 |
TACK COAT | 315 | GAL |
$3.50 |
$2.90 |
$4.00 |
$5.00 |
$4.50 |
| 9 | 408 5774 |
PRIME COAT | 1,320 | GAL |
$6.00 |
$2.00 |
$4.00 |
$5.00 |
$5.50 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 300 | TON |
$100.00 |
$82.00 |
$103.00 |
$115.00 |
$110.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 190 | TON |
$115.00 |
$92.00 |
$112.00 |
$126.00 |
$120.00 |
| 12 | 613(C) 5206 |
21" X 15" PRECOATED CORR. STL. PIPE ARCH | 30 | LF |
$50.00 |
$105.42 |
$45.00 |
$40.00 |
$46.00 |
| 13 | 613(C) 5216 |
28" X 20" PRECOATED CORR. STL. PIPE ARCH | 108 | LF |
$60.00 |
$58.47 |
$50.00 |
$40.00 |
$62.00 |
| 14 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$500.00 |
$270.60 |
$200.00 |
$150.00 |
$300.00 |
| 15 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$500.00 |
$380.33 |
$250.00 |
$200.00 |
$275.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$25,000.00 |
$12,000.00 |
$15,000.00 |
$9,750.00 |
| 17 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,580.00 |
$1,838.54 |
$1,750.00 |
$2,100.00 |
$1,950.00 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,666.18 |
$1,550.00 |
$2,200.00 |
$1,750.00 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 168 | CY |
$17.00 |
$9.48 |
$25.00 |
$15.00 |
$14.00 |
| 20 | 501(G) 6309 |
CLSM BACKFILL | 107.66 | CY |
$150.00 |
$152.00 |
$150.00 |
$150.00 |
$177.50 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 115.92 | SY |
$180.00 |
$152.00 |
$180.00 |
$200.00 |
$257.50 |
| 22 | 504(B) 1305 |
SAW-CUT GROOVING | 384.82 | SY |
$5.00 |
$8.62 |
$8.00 |
$10.00 |
$8.50 |
| 23 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 272 | LF |
$80.00 |
$75.00 |
$80.00 |
$85.00 |
$80.50 |
| 24 | 506(A) 1322 |
STRUCTURAL STEEL | 12,720 | LB |
$2.00 |
$4.15 |
$3.10 |
$2.50 |
$4.00 |
| 25 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$600.00 |
$649.24 |
$900.00 |
$1,250.00 |
$975.00 |
| 26 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$840.00 |
$649.24 |
$900.00 |
$1,250.00 |
$975.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 81.59 | CY |
$630.00 |
$475.00 |
$650.00 |
$750.00 |
$745.00 |
| 28 | 509(B) 1328 |
CLASS A CONCRETE | 79.3 | CY |
$630.00 |
$350.00 |
$650.00 |
$700.00 |
$710.00 |
| 29 | 511(A) 1332 |
REINFORCING STEEL | 29,985.3 | LB |
$1.00 |
$0.6900 |
$1.00 |
$0.9500 |
$0.9100 |
| 30 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 74.5 | LF |
$37.00 |
$41.37 |
$55.00 |
$45.00 |
$66.50 |
| 31 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 154 | LF |
$50.00 |
$37.06 |
$60.00 |
$55.00 |
$77.00 |
| 32 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 74.5 | LF |
$16.00 |
$55.26 |
$10.00 |
$15.00 |
$28.50 |
| 33 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 154 | LF |
$20.00 |
$26.73 |
$10.00 |
$15.00 |
$33.00 |
| 34 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 35 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 38.64 | LF |
$700.00 |
$743.50 |
$1,620.00 |
$1,500.00 |
$1,440.00 |
| 36 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$40,000.00 |
$2,833.52 |
$53,000.00 |
$50,000.00 |
$65,000.00 |
| 37 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 300 | TON |
$40.00 |
$43.00 |
$48.00 |
$50.00 |
$54.80 |
| 38 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 370 | SY |
$3.00 |
$11.14 |
$2.00 |
$2.00 |
$5.00 |
| 39 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 4 | EA |
$15.00 |
$28.73 |
$25.00 |
$30.00 |
$30.00 |
| 40 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,600 | LF |
$0.3500 |
$0.1500 |
$0.1400 |
$0.2000 |
$0.2500 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,791.99 |
$3,000.00 |
$5,000.00 |
$4,300.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$13,500.00 |
$8,000.00 |
$5,000.00 |
$11,400.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$57,000.00 |
$50,000.00 |
$39,000.00 |