| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$24,000.00 |
$50,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$225,200.00 |
$265,000.00 |
$350,000.00 |
$412,500.00 |
$290,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,580 | LF |
$1.50 |
$1.30 |
$3.00 |
$1.86 |
$2.85 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$8.00 |
$12.50 |
$7.00 |
$9.60 |
$12.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 32,905 | SY |
$1.50 |
$1.30 |
$1.50 |
$1.42 |
$1.30 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.6 | AC |
$400.00 |
$425.00 |
$350.00 |
$250.00 |
$400.00 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 7,405 | SY |
$1.50 |
$3.00 |
$3.00 |
$3.60 |
$3.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,115 | TON |
$22.00 |
$27.00 |
$35.00 |
$29.05 |
$23.50 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,662 | TON |
$70.00 |
$100.00 |
$105.00 |
$109.20 |
$120.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 830 | TON |
$75.00 |
$110.00 |
$110.00 |
$136.20 |
$125.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 12 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 1 | EA |
$2,500.00 |
$3,000.00 |
$1,800.00 |
$4,750.00 |
$2,800.00 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 60 | LF |
$75.00 |
$82.00 |
$75.00 |
$98.00 |
$80.00 |
| 14 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 32 | LF |
$20.00 |
$25.00 |
$38.00 |
$32.00 |
$40.00 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 26 | LF |
$30.00 |
$35.00 |
$50.00 |
$68.00 |
$50.00 |
| 16 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$400.00 |
$190.00 |
$325.00 |
$625.00 |
| 17 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$1,600.00 |
$1,000.00 |
$1,400.00 |
$825.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$7,000.00 |
$5,000.00 |
$7,625.00 |
$10,000.00 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$18.00 |
$15.00 |
$15.00 |
$11.00 |
$10.00 |
| 20 | 501(F) 6352 |
GRANULAR BACKFILL | 108 | CY |
$60.00 |
$75.00 |
$50.00 |
$78.00 |
$15.00 |
| 21 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 597.34 | LF |
$180.00 |
$185.00 |
$195.00 |
$200.00 |
$205.00 |
| 22 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 418.67 | LF |
$220.00 |
$215.00 |
$220.00 |
$235.00 |
$277.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 813.4 | SY |
$5.00 |
$4.20 |
$4.50 |
$6.00 |
$4.35 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 39.99 | LF |
$250.00 |
$245.00 |
$250.00 |
$285.00 |
$290.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 592.7 | LF |
$70.00 |
$70.00 |
$85.00 |
$77.00 |
$95.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 1,730 | LB |
$3.00 |
$3.00 |
$3.00 |
$3.00 |
$3.00 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$1,050.00 |
$850.00 |
$900.00 |
$1,300.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$800.00 |
$1,200.00 |
$850.00 |
$1,000.00 |
$1,300.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 253.9 | CY |
$450.00 |
$600.00 |
$650.00 |
$647.50 |
$675.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 223.4 | CY |
$500.00 |
$600.00 |
$600.00 |
$685.00 |
$800.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 101,250 | LB |
$0.9000 |
$0.9000 |
$0.9500 |
$0.9500 |
$1.05 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 208 | LF |
$30.00 |
$35.00 |
$35.00 |
$31.50 |
$31.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 680 | LF |
$40.00 |
$38.50 |
$45.00 |
$37.80 |
$34.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 208 | LF |
$15.00 |
$15.00 |
$10.00 |
$13.50 |
$36.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 680 | LF |
$15.00 |
$16.50 |
$10.00 |
$16.20 |
$36.00 |
| 36 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 37 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 116 | LF |
$800.00 |
$1,250.00 |
$1,250.00 |
$1,488.00 |
$1,250.00 |
| 38 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,000.00 |
$12,500.00 |
$3,500.00 |
$3,500.00 |
$3,000.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,028 | TON |
$35.00 |
$37.00 |
$40.00 |
$38.34 |
$40.00 |
| 40 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 600 | TON |
$30.00 |
$29.00 |
$32.00 |
$30.65 |
$36.00 |
| 41 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$25.00 |
$25.00 |
$25.00 |
$36.00 |
$20.00 |
| 42 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 154 | LF |
$30.00 |
$25.00 |
$12.00 |
$33.00 |
$20.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$15,000.00 |
$18,500.00 |
$45,000.00 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$15.00 |
$21.00 |
$25.00 |
$24.00 |
$22.00 |
| 45 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,100.00 |
$2,700.00 |
$1,800.00 |
$2,500.00 |
| 46 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,000.00 |
$2,500.00 |
$2,200.00 |
$3,000.00 |
$2,500.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$7,500.00 |
$7,000.00 |
$5,500.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,928.00 |
$17,300.00 |
$10,000.00 |
$13,500.00 |
$20,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$3,500.00 |
$7,000.00 |
$2,500.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$75,000.00 |
$90,000.00 |
$71,500.00 |
$135,000.00 |