| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$4,700.00 |
$4,700.00 |
$4,700.00 |
$12,000.00 |
$12,000.00 |
$17,000.00 |
$10,000.00 |
| 2 | 202(C) 0182 |
ROCK EXCAVATION | 100 | CY |
$12.00 |
$14.00 |
$14.00 |
$14.00 |
$80.00 |
$25.00 |
$35.00 |
$45.00 |
| 3 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$55,645.03 |
$55,645.03 |
$55,645.03 |
$60,000.00 |
$50,000.00 |
$62,000.00 |
$85,000.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$3,300.00 |
$3,300.00 |
$3,300.00 |
$6,200.00 |
$10,000.00 |
$8,000.00 |
$4,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 400 | LF |
$3.00 |
$1.33 |
$1.33 |
$1.33 |
$2.00 |
$1.50 |
$1.40 |
$1.40 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$8.00 |
$6.94 |
$6.94 |
$6.94 |
$10.00 |
$8.00 |
$7.50 |
$7.25 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,000 | SY |
$2.00 |
$1.38 |
$1.38 |
$1.38 |
$2.00 |
$1.50 |
$1.90 |
$1.45 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$500.00 |
$194.00 |
$194.00 |
$194.00 |
$275.00 |
$220.00 |
$200.00 |
$200.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 495 | TON |
$30.00 |
$33.00 |
$35.00 |
$32.50 |
$50.00 |
$43.00 |
$45.00 |
$40.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$375.00 |
$341.00 |
$350.00 |
$400.00 |
$300.00 |
$375.00 |
$250.00 |
$325.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 98 | LF |
$35.00 |
$28.00 |
$45.00 |
$30.00 |
$37.00 |
$60.00 |
$38.00 |
$39.00 |
| 12 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$950.00 |
$1,750.00 |
$1,200.00 |
$1,600.00 |
$800.00 |
$1,600.00 |
$1,200.00 |
$1,200.00 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$1,177.82 |
$1,177.82 |
$1,177.82 |
$1,118.00 |
$4,500.00 |
$7,500.00 |
$4,050.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 37.5 | LF |
$22.00 |
$25.00 |
$25.00 |
$25.00 |
$30.00 |
$25.00 |
$30.00 |
$26.00 |
| 15 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$600.00 |
$1,398.75 |
$1,398.75 |
$1,398.75 |
$2,000.00 |
$1,500.00 |
$1,700.00 |
$1,425.00 |
| 16 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 20 | EA |
$15.00 |
$18.00 |
$18.00 |
$18.00 |
$25.00 |
$20.00 |
$20.00 |
$18.50 |
| 17 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 3,000 | CY |
$8.00 |
$7.00 |
$7.00 |
$7.00 |
$15.00 |
$6.00 |
$13.00 |
$12.00 |
| 18 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 275 | CY |
$15.00 |
$11.00 |
$21.50 |
$5.00 |
$17.00 |
$16.00 |
$25.00 |
$40.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 615 | CY |
$470.00 |
$382.00 |
$420.00 |
$360.92 |
$390.00 |
$475.00 |
$560.00 |
$510.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 86,540 | LB |
$1.00 |
$0.8000 |
$1.00 |
$0.9000 |
$1.10 |
$0.9500 |
$1.05 |
$1.00 |
| 21 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 480 | TON |
$35.00 |
$47.00 |
$45.00 |
$49.10 |
$56.00 |
$58.00 |
$54.00 |
$42.00 |
| 22 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 190 | TON |
$30.00 |
$36.00 |
$40.00 |
$37.00 |
$46.00 |
$45.00 |
$43.00 |
$32.00 |
| 23 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$5,500.00 |
$5,500.00 |
$55,000.00 |
$25,000.00 |
$8,500.00 |
$11,000.00 |
$15,750.00 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,549.00 |
$1,549.00 |
$1,549.00 |
$2,597.00 |
$1,100.00 |
$2,600.00 |
$1,625.00 |
| 25 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$17.00 |
$22.00 |
$22.00 |
$22.00 |
$24.00 |
$17.00 |
$27.00 |
$23.00 |
| 26 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 30 | LF |
$6.50 |
$9.00 |
$9.00 |
$9.00 |
$10.00 |
$7.50 |
$11.00 |
$9.25 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$3,630.00 |
$7,000.00 |
$4,575.00 |
$5,500.00 |
$5,000.00 |
$5,700.00 |
$8,900.00 |
| 28 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$5,000.00 |
$3,500.00 |
$1,500.00 |
$2,500.00 |
$7,000.00 |
$1,823.74 |
| 29 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$26,100.00 |
$55,000.00 |
$58,778.23 |
$25,000.00 |
$51,000.00 |
$17,500.00 |
$61,195.00 |