| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,000.00 |
$5,796.00 |
$12,500.00 |
$3,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$45,000.00 |
$50,000.00 |
$47,000.00 |
$52,530.05 |
$47,500.00 |
$121,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 425 | LF |
$3.00 |
$3.00 |
$4.00 |
$1.72 |
$3.00 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$11.00 |
$7.00 |
$12.00 |
$9.48 |
$10.00 |
$5.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 4,894 | SY |
$4.50 |
$3.00 |
$2.10 |
$3.88 |
$4.00 |
$4.60 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.66 | AC |
$500.00 |
$350.00 |
$500.00 |
$195.00 |
$995.00 |
$700.00 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,665 | SY |
$3.10 |
$2.00 |
$3.00 |
$1.18 |
$5.00 |
$5.00 |
| 8 | 408 5774 |
PRIME COAT | 787 | GAL |
$5.00 |
$6.00 |
$4.70 |
$4.67 |
$5.75 |
$6.00 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 440 | TON |
$110.00 |
$105.00 |
$95.00 |
$95.75 |
$110.00 |
$113.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 300 | TON |
$120.00 |
$120.00 |
$115.00 |
$115.25 |
$125.00 |
$135.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$300.00 |
$200.00 |
$400.00 |
$295.00 |
$207.00 |
| 12 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 289 | TON |
$45.00 |
$50.00 |
$49.00 |
$41.00 |
$42.00 |
$46.00 |
| 13 | 602(C) 4155 |
FILTER FABRIC | 496 | SY |
$2.50 |
$2.00 |
$2.00 |
$2.75 |
$3.00 |
$4.00 |
| 14 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 34 | LF |
$40.00 |
$30.00 |
$45.00 |
$36.00 |
$27.00 |
$33.00 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 144 | LF |
$40.00 |
$35.00 |
$49.00 |
$38.00 |
$32.00 |
$31.00 |
| 16 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$300.00 |
$330.00 |
$275.00 |
$350.00 |
$276.00 |
| 17 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$450.00 |
$350.00 |
$375.00 |
$300.00 |
$450.00 |
$412.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,627 | SY |
$5.00 |
$4.00 |
$5.50 |
$7.53 |
$3.00 |
$7.00 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$22.00 |
$17.00 |
$16.50 |
$20.00 |
$19.00 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,525.00 |
$1,950.00 |
$1,500.00 |
$1,475.00 |
$2,200.00 |
$2,200.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,300.00 |
$1,700.00 |
$2,100.00 |
$2,500.00 |
$2,300.00 |
| 22 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$120.00 |
$100.00 |
$100.00 |
$100.00 |
$175.00 |
$235.00 |
| 23 | 629(C) 4960 |
MAILBOX | 2 | EA |
$35.00 |
$50.00 |
$25.00 |
$25.00 |
$75.00 |
$47.00 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$22.00 |
$10.00 |
$25.00 |
$30.00 |
$15.00 |
$31.00 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 88 | CY |
$175.00 |
$150.00 |
$160.00 |
$110.00 |
$125.00 |
$114.00 |
| 26 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$245.00 |
$220.00 |
$220.00 |
$245.00 |
$225.00 |
$300.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 217.8 | SY |
$8.00 |
$16.07 |
$13.00 |
$12.86 |
$15.00 |
$16.00 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 243.3 | LF |
$75.00 |
$85.00 |
$75.00 |
$75.00 |
$75.00 |
$84.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 580 | LB |
$4.00 |
$2.50 |
$3.50 |
$4.50 |
$5.00 |
$6.25 |
| 30 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$650.00 |
$1,100.00 |
$1,100.00 |
$775.00 |
$1,900.00 |
| 31 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$650.00 |
$1,100.00 |
$1,100.00 |
$775.00 |
$1,900.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 69.5 | CY |
$625.00 |
$700.00 |
$600.00 |
$575.00 |
$750.00 |
$1,150.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 74.2 | CY |
$675.00 |
$725.00 |
$625.00 |
$575.00 |
$750.00 |
$620.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 30,800 | LB |
$1.00 |
$1.00 |
$1.05 |
$1.00 |
$1.65 |
$0.8900 |
| 35 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 62 | LF |
$35.00 |
$35.00 |
$40.00 |
$33.50 |
$40.00 |
$38.00 |
| 36 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 156 | LF |
$45.00 |
$45.00 |
$50.00 |
$43.50 |
$45.00 |
$45.00 |
| 37 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 62 | LF |
$15.00 |
$15.00 |
$15.00 |
$34.00 |
$10.00 |
$65.00 |
| 38 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 156 | LF |
$18.00 |
$15.00 |
$16.00 |
$35.00 |
$10.00 |
$66.00 |
| 39 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 780 | TON |
$45.00 |
$45.00 |
$48.00 |
$41.00 |
$45.00 |
$42.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 230 | TON |
$45.00 |
$2.00 |
$41.00 |
$40.00 |
$40.00 |
$93.00 |
| 42 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$20.00 |
$12.00 |
$35.00 |
$40.00 |
$32.00 |
| 43 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$20.00 |
$20.00 |
$12.00 |
$35.00 |
$25.00 |
$19.00 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$12,000.00 |
$11,925.50 |
$7,500.00 |
$87,985.00 |
| 45 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$20.00 |
$50.00 |
$12.00 |
$10.00 |
$10.00 |
$7.00 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,400 | LF |
$1.00 |
$1.60 |
$1.50 |
$1.40 |
$1.50 |
$1.75 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$2,280.00 |
$2,194.00 |
$4,250.00 |
$5,500.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$3,500.00 |
$7,000.00 |
$7,000.00 |
$7,750.00 |
$19,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$2,500.00 |
$2,500.00 |
$4,000.00 |
$3,750.00 |
$5,000.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$46,000.00 |
$15,000.00 |
$43,000.00 |
$58,100.00 |
$55,000.00 |
$72,880.00 |