Bid tab 140270

Let Sep 18, 2014 · Division 6 · Beaver Sign up free

‹ Sep 2014 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-141): OVER CLEAR CREEK, 2.7 MILES NORTH AND 2.0 MILES EAST OF THE SH -3/SH-23 JUNCTION. PROJECT LENGTH = 0.264 MILE

Let date
Thursday, September 18, 2014
Contract
140270
J/P numbers
28349(04)
District
Division 6
County
Beaver
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-141): OVER CLEAR CREEK, 2.7 MILES NORTH AND 2.0 MILES EAST OF THE SH -3/SH-23 JUNCTION. PROJECT LENGTH = 0.264 MILE
Project number
STP-204D(005)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$936,731
1 Bridges, Inc. DBA Scudder Bridge Co. Low bidder $973,838 +4.0%
2 L & M Contractors, Inc. $987,731 +5.4% +1.4%
3 MERIDIAN CONTRACTING, INC. $1,052,375 +12.3% +8.1%
4 K & R BUILDERS, INC. $1,060,275 +13.2% +8.9%
5 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $1,092,619 +16.6% +12.2%
6 Reece Construction Co, Inc. $1,446,085 +54.4% +48.5%

Bid tab: unit prices 37 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Bridges, Inc. D…#2 L & M Contracto…#3 MERIDIAN CONTRA…#4 K & R BUILDERS,…#5 WILDCAT CONSTRU…#6 Reece Construct…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $7,500.00 $8,000.00 $10,000.00 $18,500.00 $17,500.00 $5,000.00 $5,026.44
2202(H) 0185 EARTHWORK1LSUM $40,000.00 $38,300.00 $55,000.00 $55,000.00 $54,570.00 $50,000.00 $53,923.48
3221(C) 2801 TEMPORARY SILT FENCE1,000LF $2.50 $2.00 $1.65 $2.00 $3.75 $1.33 $1.65
4221(F) 0100 TEMPORARY SILT DIKE200LF $6.00 $9.00 $9.00 $11.00 $16.00 $7.14 $9.00
5230(A) 2806 SOLID SLAB SODDING7,400SY $3.00 $3.68 $2.50 $2.50 $4.08 $3.68 $2.50
6233(A) 2817 VEGETATIVE MULCHING2.4AC $1,000.00 $912.00 $400.00 $500.00 $1,500.00 $912.00 $400.00
7402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E800TON $55.00 $60.00 $60.00 $65.00 $69.23 $85.00 $61.00
8509(D) 0325 CLASS C CONCRETE10CY $400.00 $400.00 $300.00 $300.00 $365.00 $485.00 $510.00
9613(B) 0690 24" CORR. GALV. STEEL PIPE70LF $35.00 $37.00 $30.00 $30.00 $37.00 $37.00 $36.00
10613(M) 7187 TYPE B4 CULVERT END TREATMENT2EA $2,000.00 $2,000.00 $2,500.00 $660.00 $1,950.00 $2,100.00 $2,730.00
11619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $1,000.00 $1,250.00 $4,500.00 $5,200.00 $7,500.00 $2,500.00 $4,116.89
12501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON190CY $15.00 $20.00 $25.00 $11.00 $14.75 $45.00 $87.00
13501(F) 6352 GRANULAR BACKFILL76CY $60.00 $90.00 $70.00 $120.00 $115.00 $125.00 $136.00
14503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)298LF $230.00 $260.00 $225.00 $229.00 $238.00 $250.00 $305.00
15503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)239LF $250.00 $315.00 $245.00 $289.00 $282.00 $300.00 $360.00
16504(C) 6250 SEALED EXPANSION JOINT66.2LF $300.00 $300.00 $500.00 $200.00 $335.00 $285.00 $402.00
17504(D) 6239 CONCRETE RAIL (TR3)437.5LF $70.00 $75.00 $75.00 $85.00 $103.50 $140.00 $141.00
18506(A) 1322 STRUCTURAL STEEL1,220LB $3.00 $5.00 $4.50 $2.50 $4.50 $1.35 $4.00
19507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY9EA $800.00 $1,100.00 $700.00 $500.00 $1,250.00 $675.00 $834.00
20507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY9EA $800.00 $1,100.00 $700.00 $500.00 $1,250.00 $675.00 $831.00
21509(A) 1326 CLASS AA CONCRETE213CY $600.00 $625.00 $690.00 $800.00 $750.00 $950.00 $1,206.00
22509(B) 1328 CLASS A CONCRETE68CY $600.00 $1,150.00 $690.00 $718.00 $830.00 $735.00 $1,096.00
23511(A) 1332 REINFORCING STEEL59,360LB $1.00 $1.10 $0.9500 $1.00 $1.08 $1.00 $0.8000
24514(A) 6010 PILES, FURNISHED (HP 10X42)388LF $42.00 $41.00 $55.00 $66.00 $32.20 $32.00 $42.00
25514(A) 6011 PILES, FURNISHED (HP 12X53)2,692LF $53.00 $56.00 $58.00 $47.50 $44.10 $43.00 $51.00
26514(B) 6292 PILES, DRIVEN (HP 10X42)388LF $14.00 $8.00 $7.00 $29.00 $13.80 $16.00 $30.00
27514(B) 6294 PILES, DRIVEN (HP 12X53)2,692LF $16.00 $8.00 $7.00 $20.00 $18.90 $16.00 $19.00
28514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
29601(B) 1353 TYPE I-A PLAIN RIPRAP555TON $70.00 $65.00 $75.00 $80.00 $80.04 $110.00 $75.00
30601(C) 1355 TYPE I-A FILTER BLANKET70TON $65.00 $62.00 $70.00 $70.00 $73.02 $90.00 $63.00
31619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $12,000.00 $20,000.00 $25,000.00 $16,500.00 $13,000.00 $18,998.73
32623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $2,500.00 $2,010.00 $2,100.00 $2,500.00 $2,612.50 $2,010.00 $2,010.00
33623(F) 6029 GUARDRAIL ANCHOR UNIT (TYPE A)4EA $1,500.00 $1,426.00 $1,600.00 $1,750.00 $2,025.00 $1,426.00 $1,426.00
34880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,500.00 $3,720.00 $4,500.00 $3,500.00 $6,100.00 $5,000.00 $3,720.00
35642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $9,300.00 $13,000.00 $11,500.00 $12,400.00 $10,000.00 $7,200.00
36220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,500.00 $5,000.00 $3,500.00 $1,500.00 $6,900.00 $1,500.00 $3,500.00
37641 1399 MOBILIZATION1LSUM $72,000.00 $40,000.00 $65,500.00 $75,000.50 $51,000.00 $65,000.00 $297,400.00