| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$55,000.00 |
$49,000.00 |
$67,350.00 |
$55,000.00 |
$52,000.00 |
$46,083.84 |
$40,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$1.75 |
$2.00 |
$1.45 |
$1.40 |
$2.00 |
$1.43 |
$1.24 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 252 | LF |
$5.00 |
$9.00 |
$7.75 |
$8.85 |
$11.00 |
$9.06 |
$7.88 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 7,091 | SY |
$2.00 |
$2.20 |
$1.67 |
$1.60 |
$2.00 |
$1.66 |
$1.44 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.47 | AC |
$550.00 |
$900.00 |
$300.00 |
$880.00 |
$210.00 |
$906.20 |
$788.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 882 | TON |
$36.00 |
$40.00 |
$32.80 |
$41.50 |
$32.00 |
$49.33 |
$42.50 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$250.00 |
$240.00 |
$250.00 |
$200.00 |
$574.02 |
$400.00 |
| 8 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 60 | LF |
$30.00 |
$29.00 |
$24.00 |
$25.00 |
$34.00 |
$40.26 |
$30.00 |
| 9 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 164 | LF |
$35.00 |
$34.50 |
$32.00 |
$33.50 |
$43.00 |
$48.07 |
$45.00 |
| 10 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,500.00 |
$875.00 |
$1,510.00 |
$1,600.00 |
$626.13 |
$1,250.00 |
| 11 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$1,300.00 |
$1,800.00 |
$1,500.00 |
$1,730.00 |
$2,100.00 |
$880.48 |
$1,350.00 |
| 12 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$10.00 |
$12.00 |
$8.67 |
$32.00 |
$23.00 |
$27.50 |
$35.00 |
| 13 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$75.00 |
$60.00 |
$67.00 |
$43.00 |
$80.00 |
$81.09 |
$90.00 |
| 14 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 508 | LF |
$210.00 |
$200.50 |
$206.00 |
$235.00 |
$230.00 |
$221.71 |
$250.00 |
| 15 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.17 | LF |
$270.00 |
$220.00 |
$250.00 |
$300.00 |
$240.00 |
$189.37 |
$425.00 |
| 16 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 401.2 | LF |
$75.00 |
$72.00 |
$73.00 |
$100.00 |
$75.00 |
$88.00 |
$65.00 |
| 17 | 506(A) 1322 |
STRUCTURAL STEEL | 800 | LB |
$2.25 |
$2.50 |
$2.50 |
$1.50 |
$2.75 |
$2.76 |
$3.50 |
| 18 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$770.00 |
$778.00 |
$800.00 |
$800.00 |
$801.82 |
$900.00 |
| 19 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$900.00 |
$770.00 |
$778.00 |
$800.00 |
$800.00 |
$801.82 |
$900.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 131 | CY |
$600.00 |
$480.00 |
$592.00 |
$650.00 |
$675.00 |
$558.32 |
$580.00 |
| 21 | 509(B) 1328 |
CLASS A CONCRETE | 87.6 | CY |
$625.00 |
$480.00 |
$627.00 |
$625.00 |
$750.00 |
$581.20 |
$580.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 47,991 | LB |
$0.9000 |
$0.9800 |
$0.9100 |
$1.45 |
$1.10 |
$0.9400 |
$0.9500 |
| 23 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 142 | LF |
$22.00 |
$29.20 |
$29.40 |
$36.50 |
$30.00 |
$46.54 |
$32.50 |
| 24 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 315 | LF |
$26.00 |
$34.00 |
$32.90 |
$45.50 |
$40.00 |
$54.17 |
$43.00 |
| 25 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 142 | LF |
$10.00 |
$12.00 |
$12.60 |
$25.00 |
$12.00 |
$16.50 |
$29.00 |
| 26 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 315 | LF |
$12.00 |
$12.00 |
$14.10 |
$25.00 |
$13.00 |
$16.50 |
$26.50 |
| 27 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 28 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 52 | LF |
$640.00 |
$833.10 |
$770.00 |
$600.00 |
$845.00 |
$1,064.31 |
$800.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,089 | TON |
$40.00 |
$41.00 |
$38.25 |
$45.00 |
$47.00 |
$44.56 |
$45.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 697 | TON |
$35.00 |
$38.00 |
$33.10 |
$45.00 |
$38.00 |
$36.51 |
$37.50 |
| 31 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$40.00 |
$35.00 |
$20.00 |
$16.00 |
$30.84 |
$40.00 |
| 32 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$34.00 |
$10.00 |
$35.00 |
$28.00 |
$16.00 |
$33.29 |
$40.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$8,433.00 |
$10,000.00 |
$20,000.00 |
$24,475.00 |
$22,000.00 |
| 34 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,150.00 |
$1,625.00 |
$1,677.50 |
$1,400.00 |
$1,650.00 |
$2,073.50 |
$1,525.00 |
| 35 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,300.00 |
$1,600.00 |
$1,622.50 |
$1,350.00 |
$1,650.00 |
$1,815.00 |
$1,475.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,500.00 |
$3,000.00 |
$2,505.00 |
$4,000.00 |
$3,960.00 |
$2,505.00 |
| 37 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,800.00 |
$6,700.00 |
$6,500.00 |
$6,200.00 |
$6,325.00 |
$7,500.00 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,500.00 |
$2,800.00 |
$2,500.00 |
$2,700.00 |
$2,750.00 |
$5,000.00 |
| 39 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,000.00 |
$35,000.00 |
$31,167.00 |
$28,320.00 |
$42,000.00 |
$52,808.93 |
$75,000.00 |