| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$9,664.30 |
$7,986.38 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,874 | CY |
$7.60 |
$11.00 |
$11.89 |
$15.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,014 | LF |
$2.70 |
$2.00 |
$1.35 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$7.70 |
$9.00 |
$3.00 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 3,762 | SY |
$2.25 |
$3.20 |
$2.95 |
$2.95 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 573 | CY |
$41.00 |
$47.00 |
$52.00 |
$50.00 |
| 7 | 325 5271 |
SEPARATOR FABRIC | 2,056 | SY |
$1.80 |
$1.40 |
$1.25 |
$2.50 |
| 8 | 407(B) 0250 |
TACK COAT | 127 | GAL |
$3.50 |
$6.00 |
$3.00 |
$3.50 |
| 9 | 408 5774 |
PRIME COAT | 1,113 | GAL |
$5.50 |
$8.00 |
$5.50 |
$8.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 388 | TON |
$80.00 |
$120.00 |
$82.25 |
$80.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 190 | TON |
$101.00 |
$160.00 |
$106.00 |
$100.00 |
| 12 | 613(E) 4786 |
18" CORRUGATED POLYETHYLENE PIPE TYPE "S" | 38 | LF |
$32.00 |
$59.00 |
$32.00 |
$40.00 |
| 13 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$967.00 |
$1,100.00 |
$1,250.00 |
$1,000.00 |
| 14 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$15,000.00 |
$1,452.07 |
$3,000.00 |
| 15 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$615.50 |
$280.00 |
$750.00 |
$850.00 |
| 16 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$17.00 |
$20.00 |
$19.00 |
$20.00 |
| 17 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,475.00 |
$1,800.00 |
$1,200.00 |
$1,400.00 |
| 18 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,700.00 |
$1,800.00 |
$2,000.00 |
| 19 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,185 | LF |
$4.70 |
$6.00 |
$5.00 |
$8.00 |
| 20 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$700.00 |
$1,200.00 |
$500.00 |
$1,000.00 |
| 21 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 108 | CY |
$11.80 |
$44.00 |
$75.00 |
$35.00 |
| 22 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 42 | CY |
$17.00 |
$40.00 |
$30.00 |
$15.00 |
| 23 | 504(A) 1304 |
APPROACH SLAB | 109.72 | SY |
$150.00 |
$170.00 |
$150.00 |
$200.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 50 | LF |
$242.00 |
$50.00 |
$60.00 |
$28.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 165.5 | LF |
$66.00 |
$110.00 |
$175.00 |
$120.00 |
| 26 | 508 6359 |
PRECAST ARCH CULVERT | 28 | LF |
$2,320.00 |
$3,928.00 |
$3,500.00 |
$5,525.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 25 | CY |
$455.00 |
$1,280.00 |
$1,000.00 |
$720.00 |
| 28 | 509(B) 1328 |
CLASS A CONCRETE | 130 | CY |
$488.00 |
$475.00 |
$750.00 |
$650.00 |
| 29 | 511(A) 1332 |
REINFORCING STEEL | 15,550 | LB |
$1.00 |
$1.30 |
$2.50 |
$1.70 |
| 30 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,590 | LB |
$1.40 |
$1.50 |
$3.00 |
$1.80 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 285 | SY |
$4.20 |
$5.50 |
$5.00 |
$4.20 |
| 32 | 516(A) 6090 |
DRILLED SHAFTS 24" DIAMETER | 240 | LF |
$275.00 |
$160.00 |
$400.00 |
$450.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 702 | TON |
$31.30 |
$30.00 |
$24.00 |
$30.00 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 176 | TON |
$27.00 |
$25.00 |
$19.00 |
$20.00 |
| 35 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 702 | SY |
$2.80 |
$2.00 |
$1.25 |
$4.00 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$9,196.46 |
$20,000.00 |
| 37 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,324 | LF |
$1.07 |
$1.25 |
$1.00 |
$1.30 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$1,500.00 |
$1,500.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$6,500.00 |
$6,000.00 |
$10,000.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,600.00 |
$3,000.00 |
$2,600.00 |
| 41 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$58,000.00 |
$68,164.52 |
$67,000.00 |