| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,000.00 |
$2,558.30 |
$35,000.00 |
$10,500.00 |
$10,000.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 14,930 | CY |
$7.50 |
$7.55 |
$8.00 |
$6.45 |
$8.20 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$3.00 |
$1.30 |
$2.00 |
$2.15 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,000 | LF |
$6.00 |
$7.75 |
$10.00 |
$8.50 |
$10.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 14,110 | SY |
$3.00 |
$1.70 |
$1.75 |
$1.60 |
$1.88 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,709 | CY |
$45.00 |
$37.00 |
$70.00 |
$75.00 |
$56.00 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 13,178 | SY |
$7.50 |
$0.7500 |
$3.00 |
$2.00 |
$2.20 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 220 | TON |
$35.00 |
$38.00 |
$43.00 |
$70.00 |
$45.00 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 1,000 | SY |
$4.00 |
$9.29 |
$6.50 |
$2.00 |
$5.00 |
| 10 | 509(A) 0319 |
CLASS AA CONCRETE | 119.2 | CY |
$400.00 |
$566.62 |
$620.00 |
$520.00 |
$415.00 |
| 11 | 511(A) 0332 |
REINFORCING STEEL | 15,315 | LB |
$1.10 |
$1.20 |
$1.00 |
$1.00 |
$0.9000 |
| 12 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 96 | LF |
$85.00 |
$122.51 |
$71.00 |
$68.00 |
$85.00 |
| 13 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 104 | LF |
$105.00 |
$180.88 |
$135.00 |
$127.00 |
$162.00 |
| 14 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 48 | LF |
$175.00 |
$214.36 |
$155.00 |
$165.00 |
$195.00 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 308 | LF |
$25.00 |
$42.60 |
$42.00 |
$27.00 |
$20.00 |
| 16 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 118 | LF |
$35.00 |
$46.97 |
$54.00 |
$54.00 |
$25.00 |
| 17 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,200.00 |
$977.88 |
$1,000.00 |
$2,000.00 |
$2,000.00 |
| 18 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,800.00 |
$1,564.73 |
$1,800.00 |
$3,000.00 |
$2,500.00 |
| 19 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,400.00 |
$1,782.32 |
$2,150.00 |
$3,200.00 |
$3,000.00 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 14 | EA |
$1,500.00 |
$817.25 |
$1,250.00 |
$1,100.00 |
$900.00 |
| 21 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$988.29 |
$1,500.00 |
$1,200.00 |
$1,200.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$35,000.00 |
$8,000.00 |
$15,000.00 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 600 | LF |
$18.00 |
$14.91 |
$15.00 |
$16.00 |
$15.06 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$1,500.00 |
$1,491.00 |
$1,500.00 |
$1,700.00 |
$1,700.00 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,500.00 |
$2,130.00 |
$2,200.00 |
$2,100.00 |
$2,500.00 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 36.82 | SF |
$15.00 |
$26.62 |
$26.00 |
$16.00 |
$16.50 |
| 27 | 851(C) 8324 |
2" SQUARE TUBE POST | 90 | LF |
$15.00 |
$7.99 |
$8.00 |
$9.00 |
$16.50 |
| 28 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 32 | EA |
$15.00 |
$5.64 |
$5.50 |
$9.50 |
$10.50 |
| 29 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 64,880 | LF |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$9,000.00 |
$10,000.00 |
$10,000.00 |
$8,250.00 |
| 31 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$12,000.00 |
$30,000.00 |
$28,000.00 |
$25,000.00 |
| 32 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$850.00 |
$2,000.00 |
$4,500.00 |
$10,000.00 |
| 33 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$77,000.00 |
$95,000.00 |
$50,000.00 |
$110,000.00 |
$120,023.00 |
| 34 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 4 | EAGP |
$1,200.00 |
$1,500.00 |
|
|
$1,200.00 |
| 35 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 54,077 | SY |
$11.00 |
$4.25 |
|
|
$11.20 |
| 36 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 8,556 | CY |
$95.00 |
$105.70 |
|
|
$99.00 |
| 37 | 407(B) 0250 |
TACK COAT | 5,573 | GAL |
$3.00 |
|
$2.25 |
$2.00 |
|
| 38 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,952 | TON |
$70.00 |
|
$61.00 |
$65.00 |
|
| 39 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,217 | TON |
$80.00 |
|
$78.00 |
$81.25 |
|
| 40 | 413(D) 4867 |
RUMBLE STRIP METHOD PCC-CYC GROUP | 4 | EAGP |
$1,100.00 |
|
$650.00 |
$630.00 |
|