| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,500 | CY |
$4.80 |
$12.38 |
$11.00 |
$10.50 |
$12.80 |
$11.40 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 800 | CY |
$6.30 |
$11.67 |
$20.00 |
$15.00 |
$19.50 |
$10.75 |
| 3 | 209 0120 |
MACHINE GRADING | 367 | LF |
$3.86 |
$5.27 |
$21.00 |
$100.00 |
$38.00 |
$4.40 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$1.90 |
$3.74 |
$3.25 |
$5.50 |
$2.36 |
$2.40 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$155.00 |
$713.47 |
$2,000.00 |
$550.00 |
$290.72 |
$180.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 532 | LF |
$7.10 |
$10.86 |
$7.00 |
$10.20 |
$15.28 |
$2.25 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,762 | SY |
$1.35 |
$2.71 |
$2.95 |
$2.75 |
$2.86 |
$2.70 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,011 | SY |
$0.7000 |
$2.70 |
$13.50 |
$2.50 |
$1.55 |
$10.00 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 453 | TON |
$65.90 |
$80.07 |
$82.00 |
$85.00 |
$87.07 |
$117.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 51 | TON |
$77.00 |
$172.83 |
$175.00 |
$105.00 |
$159.42 |
$174.00 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 684 | SY |
$1.50 |
$11.79 |
$11.50 |
$2.85 |
$15.24 |
$12.20 |
| 12 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 498 | SY |
$9.10 |
$19.83 |
$34.00 |
$15.00 |
$24.28 |
$29.50 |
| 13 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,214 | SY |
$14.00 |
$32.49 |
$31.00 |
$20.23 |
$15.32 |
$35.00 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 428 | CY |
$89.60 |
$112.75 |
$115.00 |
$108.00 |
$143.72 |
$140.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 1 | CY |
$252.75 |
$1,706.59 |
$890.00 |
$850.00 |
$550.63 |
$1,074.00 |
| 16 | 609(B) 0388 |
1'-8" COMB. CURB & GUTTER (8" BARRIER-NOTCHED) | 367 | LF |
$30.00 |
$19.24 |
$25.00 |
$22.50 |
$27.67 |
$26.40 |
| 17 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 103 | SY |
$45.70 |
$60.40 |
$58.00 |
$65.00 |
$75.20 |
$89.00 |
| 18 | 612(C) 0645 |
INLET ADJUST TO GRADE | 1 | EA |
$1,000.00 |
$1,356.40 |
$2,700.00 |
$3,500.00 |
$4,052.31 |
$4,175.00 |
| 19 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 35 | LF |
$50.00 |
$82.38 |
$79.00 |
$60.00 |
$52.73 |
$60.00 |
| 20 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 90 | LF |
$33.00 |
$66.59 |
$14.75 |
$60.00 |
$49.29 |
$72.00 |
| 21 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 71 | LF |
$11.50 |
$16.63 |
$8.00 |
$25.00 |
$18.51 |
$6.00 |
| 22 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$10.25 |
$16.48 |
$8.00 |
$25.00 |
$25.20 |
$7.00 |
| 23 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,126.00 |
$2,110.30 |
$1,700.00 |
$2,500.00 |
$2,725.70 |
$618.00 |
| 24 | 613(N) 7522 |
TYPE C6 SLOPED CONCRETE END SECTION | 2 | EA |
$2,300.00 |
$3,423.98 |
$1,265.00 |
$2,500.00 |
$3,939.03 |
$918.00 |
| 25 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$270.00 |
$410.07 |
$530.00 |
$1,000.00 |
$1,318.29 |
$954.00 |
| 26 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 80 | LF |
$3.80 |
$10.42 |
$36.00 |
$20.23 |
$17.70 |
$9.50 |
| 27 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 625 | SY |
$4.30 |
$10.58 |
$20.00 |
$8.00 |
$20.88 |
$16.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 965 | SY |
$3.10 |
$9.20 |
$9.00 |
$6.50 |
$15.75 |
$16.00 |
| 29 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 95 | LF |
$3.90 |
$11.53 |
$23.00 |
$15.00 |
$17.17 |
$9.50 |
| 30 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 12 | EAGP |
$683.00 |
$441.44 |
$475.00 |
$100.00 |
$402.50 |
$477.00 |
| 31 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 45,500 | LF |
$0.0500 |
$0.1300 |
$0.1300 |
$0.0800 |
$0.1200 |
$0.0600 |
| 32 | 413(D) 4867 |
RUMBLE STRIP METHOD PCC-CYC GROUP | 8 | EAGP |
$685.00 |
$713.94 |
$560.00 |
$100.00 |
$575.00 |
$775.00 |
| 33 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 45,500 | LF |
$0.4000 |
$0.3800 |
$0.1100 |
$0.3000 |
$0.1200 |
$0.3300 |
| 34 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$160.50 |
$70.85 |
$55.00 |
$55.00 |
$57.50 |
$60.00 |
| 35 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 17 | EA |
$77.75 |
$81.75 |
$95.00 |
$90.00 |
$97.75 |
$101.00 |
| 36 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 4 | EA |
$157.00 |
$2,397.97 |
$2,400.00 |
$2,500.00 |
$2,587.50 |
$2,700.00 |
| 37 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,115 | LF |
$0.4000 |
$0.2100 |
$0.9500 |
$0.9500 |
$0.9800 |
$1.00 |
| 38 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 3,825 | LF |
$0.4000 |
$1.36 |
$1.12 |
$1.10 |
$1.15 |
$1.20 |
| 39 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 100 | LF |
$0.8500 |
$1.96 |
$1.90 |
$1.75 |
$1.96 |
$2.00 |
| 40 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,450 | LF |
$1.80 |
$2.02 |
$2.20 |
$2.20 |
$2.30 |
$2.40 |
| 41 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 132 | LF |
$4.00 |
$2.07 |
$4.50 |
$4.40 |
$4.60 |
$4.80 |
| 42 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 5,000 | LF |
$0.1000 |
$0.0800 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.0600 |
| 43 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,700 | EA |
$0.7000 |
$0.6500 |
$0.5000 |
$0.5500 |
$0.5200 |
$0.5500 |
| 44 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.1500 |
$0.1300 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.0600 |
| 45 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 90 | SD |
$13.90 |
$3.27 |
$5.60 |
$5.50 |
$5.75 |
$6.00 |
| 46 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 45 | SD |
$23.00 |
$13.08 |
$5.60 |
$5.50 |
$5.75 |
$6.00 |
| 47 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,550 | LF |
$18.00 |
$8.94 |
$13.35 |
$20.00 |
$19.47 |
$16.00 |
| 48 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 90 | SD |
$8.50 |
$6.54 |
$16.75 |
$16.50 |
$17.25 |
$18.00 |
| 49 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,395 | SD |
$0.2000 |
$2.45 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1200 |
| 50 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$0.7500 |
$2.45 |
$0.5600 |
$0.5500 |
$0.5800 |
$0.6000 |
| 51 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 990 | SD |
$1.20 |
$4.36 |
$2.25 |
$2.20 |
$2.30 |
$2.40 |
| 52 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.4000 |
$0.0200 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1200 |
| 53 | 880(C) 8848 |
WING BARRICADES | 180 | SD |
$1.00 |
$0.8200 |
$3.35 |
$3.30 |
$3.45 |
$3.60 |
| 54 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,420 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0300 |
| 55 | 880(F) 8878 |
DRUMS | 2,250 | SD |
$0.1000 |
$0.1100 |
$0.5600 |
$0.5500 |
$0.5800 |
$0.6000 |
| 56 | 880(G) 8890 |
CHANNELIZER CONES | 9,000 | SD |
$0.1500 |
$0.0200 |
$0.5600 |
$0.5500 |
$0.5800 |
$0.6000 |
| 57 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 80 | HOUR |
$60.00 |
$65.40 |
$69.25 |
$72.00 |
$71.30 |
$74.00 |
| 58 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 270 | SD |
$15.00 |
$4.36 |
$55.85 |
$55.00 |
$5.75 |
$6.00 |
| 59 | 802(A) 8302 |
1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 50 | LF |
$11.00 |
$16.35 |
$11.17 |
$15.50 |
$17.25 |
$11.90 |
| 60 | 802(B) 8334 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 8 | LF |
$3.70 |
$4.36 |
$5.60 |
$4.40 |
$4.60 |
$6.00 |
| 61 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 33 | LF |
$4.30 |
$6.54 |
$6.70 |
$6.60 |
$6.90 |
$7.00 |
| 62 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 168 | LF |
$17.50 |
$19.62 |
$20.15 |
$18.80 |
$20.70 |
$21.50 |
| 63 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 179 | LF |
$8.60 |
$8.72 |
$7.85 |
$8.80 |
$9.20 |
$8.35 |
| 64 | 803(A) 8065 |
PULL BOX(SIZE I) | 6 | EA |
$295.00 |
$327.00 |
$319.00 |
$330.00 |
$345.00 |
$340.00 |
| 65 | 803(A) 8066 |
PULL BOX(SIZE II) | 1 | EA |
$307.00 |
$354.24 |
$400.00 |
$360.00 |
$373.75 |
$375.00 |
| 66 | 804(A) 2915 |
STRUCTURAL CONCRETE | 10 | CY |
$447.00 |
$435.99 |
$600.00 |
$440.00 |
$460.00 |
$570.00 |
| 67 | 804(B) 2916 |
REINFORCING STEEL | 1,310 | LB |
$1.40 |
$1.31 |
$1.65 |
$1.32 |
$1.38 |
$1.75 |
| 68 | 805(A) 8704 |
REMOVAL OF PULL BOX | 4 | EA |
$33.50 |
$54.50 |
$25.00 |
$55.00 |
$57.50 |
$24.00 |
| 69 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 18 | EA |
$54.00 |
$136.25 |
$55.00 |
$110.00 |
$115.01 |
$60.00 |
| 70 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$4,150.00 |
$2,920.82 |
$2,300.00 |
$1,650.00 |
$5,698.95 |
$2,400.00 |
| 71 | 805(D) 8746 |
(PL)REMOVE & RESET SERVICE POLE | 1 | EA |
$1,500.00 |
$544.99 |
$560.00 |
$550.00 |
$575.00 |
$600.00 |
| 72 | 806(A) 8314 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 2 | EA |
$13,000.00 |
$10,217.52 |
$10,000.00 |
$10,000.00 |
$10,780.10 |
$10,400.00 |
| 73 | 806(A) 8352 |
32'MH POLE,20'TS & 10'LMA(G.STL.) | 1 | EA |
$5,000.00 |
$4,392.63 |
$5,400.00 |
$4,400.00 |
$4,634.50 |
$5,700.00 |
| 74 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$987.00 |
$327.00 |
$415.00 |
$330.00 |
$345.00 |
$441.00 |
| 75 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 91 | LF |
$1.00 |
$2.18 |
$1.70 |
$2.20 |
$2.30 |
$1.80 |
| 76 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 987 | LF |
$0.6000 |
$0.4400 |
$0.9500 |
$0.4400 |
$0.4600 |
$0.9800 |
| 77 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$20,400.00 |
$19,297.08 |
$22,000.00 |
$20,000.00 |
$20,359.60 |
$23,500.00 |
| 78 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$30,000.00 |
$18,682.33 |
$24,000.00 |
$20,000.00 |
$19,711.00 |
$25,000.00 |
| 79 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 8 | EA |
$526.00 |
$503.57 |
$530.00 |
$480.00 |
$531.30 |
$560.00 |
| 80 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 2 | EA |
$523.00 |
$505.75 |
$530.00 |
$480.00 |
$533.60 |
$560.00 |
| 81 | 831 8262 |
1WAY 3SEC. ADJ. SIG. HD. S-10 | 1 | EA |
$540.00 |
$505.76 |
$530.00 |
$480.00 |
$533.60 |
$560.00 |
| 82 | 833 3030 |
BACKPLATE | 11 | EA |
$69.80 |
$87.20 |
$91.00 |
$88.00 |
$92.00 |
$97.00 |
| 83 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 772 | LF |
$1.20 |
$1.63 |
$1.45 |
$1.65 |
$1.73 |
$1.55 |
| 84 | 834(A) 8211 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 441 | LF |
$2.80 |
$2.72 |
$3.50 |
$3.00 |
$2.88 |
$3.60 |
| 85 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 135 | SF |
$15.00 |
$8.61 |
$8.38 |
$22.00 |
$23.01 |
$60.00 |
| 86 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 66 | SF |
$42.00 |
$43.60 |
$35.74 |
$44.00 |
$46.00 |
$38.00 |
| 87 | 851(C) 8324 |
2" SQUARE TUBE POST | 148 | LF |
$6.70 |
$15.26 |
$11.17 |
$13.20 |
$13.81 |
$30.00 |
| 88 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$15,000.00 |
$13,134.30 |
$10,000.00 |
$15,000.00 |
$13,857.50 |
$10,800.00 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$1,000.00 |
$5,994.91 |
$11,000.00 |
$8,500.00 |
$5,865.00 |
$6,500.00 |
| 90 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$32,635.65 |
$17,000.00 |
$45,000.00 |
$31,598.94 |
$25,000.00 |