| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$5,325.00 |
$7,000.00 |
$12,000.00 |
$20,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$17,000.00 |
$18,500.00 |
$26,000.00 |
$24,000.00 |
$50,250.00 |
$56,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 977 | LF |
$2.50 |
$2.00 |
$1.50 |
$1.35 |
$2.00 |
$2.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 96 | LF |
$8.00 |
$15.50 |
$6.00 |
$11.00 |
$15.00 |
$20.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 4,780 | SY |
$2.00 |
$1.65 |
$1.65 |
$2.00 |
$1.65 |
$2.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.98 | AC |
$450.00 |
$935.00 |
$470.00 |
$680.00 |
$800.00 |
$1,200.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12 | TON |
$30.00 |
$70.00 |
$58.82 |
$55.00 |
$67.50 |
$150.00 |
| 8 | 408 5774 |
PRIME COAT | 400 | GAL |
$5.00 |
$10.00 |
$9.90 |
$11.00 |
$6.25 |
$11.00 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 454 | TON |
$90.00 |
$90.00 |
$90.20 |
$92.00 |
$115.00 |
$125.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 225 | TON |
$115.00 |
$97.00 |
$97.90 |
$99.00 |
$120.00 |
$135.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$300.00 |
$262.50 |
$300.00 |
$370.00 |
$500.00 |
| 12 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 30 | LF |
$30.00 |
$20.00 |
$26.00 |
$38.00 |
$63.00 |
$70.00 |
| 13 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$150.00 |
$250.00 |
$325.00 |
$365.00 |
$150.00 |
| 14 | 619(B) 5113 |
REMOVAL OF RIPRAP | 1,500 | SY |
$10.00 |
$10.00 |
$12.20 |
$20.00 |
$7.50 |
$28.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$20.00 |
$10.00 |
$8.50 |
$15.00 |
$11.50 |
$40.00 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$50.00 |
$60.00 |
$63.75 |
$67.00 |
$65.00 |
$60.00 |
| 17 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$190.00 |
$178.00 |
$188.25 |
$215.00 |
$310.00 |
$270.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 217.8 | SY |
$5.00 |
$9.00 |
$9.15 |
$11.00 |
$13.00 |
$15.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 243.3 | LF |
$60.00 |
$60.00 |
$68.50 |
$85.00 |
$77.00 |
$140.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 580 | LB |
$2.00 |
$3.50 |
$2.58 |
$2.50 |
$3.00 |
$4.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$550.00 |
$600.00 |
$1,000.00 |
$1,100.00 |
$1,100.00 |
$1,200.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$600.00 |
$1,000.00 |
$1,100.00 |
$1,100.00 |
$1,200.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 69.5 | CY |
$465.00 |
$500.00 |
$545.00 |
$610.00 |
$750.00 |
$1,100.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 74.2 | CY |
$450.00 |
$500.00 |
$557.50 |
$575.00 |
$610.00 |
$650.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 29,010 | LB |
$1.00 |
$0.9000 |
$0.8700 |
$1.00 |
$0.9000 |
$1.00 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 190 | LF |
$30.00 |
$30.00 |
$25.90 |
$41.00 |
$29.50 |
$32.00 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 460 | LF |
$40.00 |
$35.00 |
$30.10 |
$46.00 |
$35.50 |
$40.00 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 190 | LF |
$10.00 |
$15.00 |
$11.10 |
$14.00 |
$13.50 |
$90.00 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 460 | LF |
$15.00 |
$15.00 |
$12.90 |
$15.00 |
$20.00 |
$90.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 50 | TON |
$40.00 |
$41.00 |
$43.93 |
$43.00 |
$44.00 |
$70.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 341 | TON |
$30.00 |
$31.00 |
$31.94 |
$34.00 |
$32.00 |
$65.00 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$25.00 |
$35.00 |
$20.00 |
$23.00 |
$20.00 |
| 33 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 154 | LF |
$20.00 |
$25.00 |
$30.00 |
$20.00 |
$30.00 |
$20.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$6,750.00 |
$10,000.00 |
$11,000.00 |
$24,152.50 |
| 35 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$700.00 |
$1,650.00 |
$1,650.00 |
$1,900.00 |
$2,200.00 |
$1,500.00 |
| 36 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$2,000.00 |
$1,375.00 |
$1,375.00 |
$1,600.00 |
$2,300.00 |
$2,000.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,000.00 |
$1,735.00 |
$2,000.00 |
$2,500.00 |
$1,900.00 |
$2,500.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,600.00 |
$8,750.00 |
$6,000.00 |
$7,500.00 |
$9,000.00 |
$5,000.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$2,850.00 |
$7,500.00 |
$2,000.00 |
$5,000.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$13,000.00 |
$25,500.00 |
$19,000.00 |
$56,000.00 |
$55,000.00 |