| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,750.00 |
$17,100.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,500 | CY |
$4.50 |
$8.40 |
$2.93 |
$13.50 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,650.00 |
$4,320.00 |
$6,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,540 | LF |
$1.70 |
$2.60 |
$3.60 |
$2.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$7.00 |
$20.00 |
$18.00 |
$15.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 4,380 | SY |
$2.30 |
$2.19 |
$2.64 |
$2.18 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 209 | CY |
$70.00 |
$53.00 |
$111.72 |
$92.00 |
| 8 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 578 | TON |
$100.00 |
$115.00 |
$138.00 |
$138.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 566 | TON |
$110.00 |
$120.00 |
$144.00 |
$144.00 |
| 10 | 412 5267 |
COLD MILLING PAVEMENT | 800 | SY |
$9.00 |
$10.00 |
$10.50 |
$12.00 |
| 11 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 871 | SY |
$3.00 |
$10.00 |
$10.50 |
$12.00 |
| 12 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 565 | LF |
$4.00 |
$3.30 |
$2.40 |
$6.35 |
| 13 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$750.00 |
$830.00 |
$1,080.00 |
$930.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 637.5 | LF |
$17.00 |
$16.10 |
$19.32 |
$18.52 |
| 15 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$1,930.00 |
$2,316.00 |
$2,219.50 |
| 16 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,360.00 |
$1,632.00 |
$1,564.00 |
| 17 | 501(G) 6309 |
CLSM BACKFILL | 110 | CY |
$200.00 |
$210.00 |
$187.20 |
$210.00 |
| 18 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$29,000.00 |
$22,125.00 |
$20,580.00 |
| 19 | 504(A) 1304 |
APPROACH SLAB | 146 | SY |
$220.00 |
$290.00 |
$357.02 |
$295.00 |
| 20 | 504(B) 1305 |
SAW-CUT GROOVING | 823 | SY |
$5.00 |
$4.20 |
$5.25 |
$5.04 |
| 21 | 504(C) 6250 |
SEALED EXPANSION JOINT | 67.8 | LF |
$300.00 |
$370.00 |
$342.23 |
$315.00 |
| 22 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 483 | LF |
$80.00 |
$175.00 |
$133.43 |
$103.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 8,000 | LB |
$10.00 |
$7.00 |
$8.36 |
$8.58 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 24 | EA |
$1,000.00 |
$1,450.00 |
$1,658.28 |
$1,710.00 |
| 25 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$1,450.00 |
$1,658.28 |
$1,710.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 173.5 | CY |
$650.00 |
$1,100.00 |
$735.67 |
$910.00 |
| 27 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$1,100.00 |
$464.34 |
$650.00 |
| 28 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 45,710 | LB |
$1.00 |
$1.40 |
$1.35 |
$1.17 |
| 29 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$6,000.00 |
$15,000.00 |
$17,650.00 |
$17,000.00 |
| 30 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$2,000.00 |
$5,000.00 |
$3,500.00 |
$3,360.00 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 595 | SY |
$4.00 |
$3.60 |
$4.50 |
$4.80 |
| 32 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$50.00 |
$35.00 |
$43.75 |
$42.00 |
| 33 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$80.00 |
$80.00 |
$100.00 |
$96.00 |
| 34 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 100 | SY |
$600.00 |
$600.00 |
$662.50 |
$636.00 |
| 35 | 523(A) 6550 |
SEALER CRACK PREPARATION | 63 | LF |
$5.00 |
$3.00 |
$3.75 |
$6.60 |
| 36 | 523(B) 6560 |
SEALER RESIN | 0.8 | GAL |
$250.00 |
$85.00 |
$106.25 |
$360.00 |
| 37 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 6 | EA |
$8,000.00 |
$2,850.00 |
$8,421.59 |
$7,920.00 |
| 38 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 140 | TON |
$50.00 |
$77.00 |
$54.89 |
$70.00 |
| 39 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$65,000.00 |
$80,000.00 |
$33,475.00 |
$137,500.00 |
| 40 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$15.00 |
$10.00 |
$11.00 |
$12.00 |
| 41 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,704 | LF |
$0.8000 |
$1.00 |
$1.38 |
$1.50 |
| 42 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,400 | SD |
$0.5000 |
$0.2500 |
$0.0300 |
$0.0400 |
| 43 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 960 | SD |
$1.00 |
$3.00 |
$1.65 |
$1.80 |
| 44 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,680 | SD |
$1.50 |
$0.5000 |
$0.5500 |
$0.6000 |
| 45 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,920 | SD |
$0.1000 |
$0.5000 |
$2.20 |
$2.40 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$15,000.00 |
$14,400.00 |
$18,000.00 |
| 47 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$85,150.00 |
$100,000.00 |
$99,440.09 |
$96,500.00 |
| 48 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 30 | TON |
$175.00 |
$370.00 |
$270.00 |
$270.00 |
| 49 | 619(C) 0924 |
SAWING PAVEMENT | 74 | LF |
$5.50 |
$6.80 |
$12.00 |
$18.00 |
| 50 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,700.00 |
$1,795.00 |
$2,154.00 |
$2,154.00 |
| 51 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 800 | LF |
$12.00 |
$6.25 |
$7.50 |
$7.50 |
| 52 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 50 | CY |
$18.00 |
$41.00 |
$125.00 |
$50.00 |
| 53 | 501(G) 6309 |
CLSM BACKFILL | 15 | CY |
$230.00 |
$310.00 |
$287.20 |
$305.00 |
| 54 | 504(A) 1304 |
APPROACH SLAB | 95.2 | SY |
$175.00 |
$290.00 |
$248.03 |
$365.00 |
| 55 | 504(B) 1305 |
SAW-CUT GROOVING | 86 | SY |
$12.00 |
$4.20 |
$5.25 |
$5.04 |
| 56 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 348 | LF |
$70.00 |
$175.00 |
$133.43 |
$195.00 |
| 57 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 140 | LF |
$28.00 |
$41.00 |
$42.70 |
$48.00 |
| 58 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,440 | LB |
$1.70 |
$4.60 |
$6.97 |
$2.08 |
| 59 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 55.6 | SY |
$200.00 |
$170.00 |
$309.81 |
$403.20 |
| 60 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$330.00 |
$310.00 |
$479.43 |
$492.00 |
| 61 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 302 | SY |
$4.50 |
$3.60 |
$4.50 |
$4.80 |
| 62 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 80 | SY |
$620.00 |
$554.00 |
$662.50 |
$636.00 |
| 63 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 80 | SY |
$24.00 |
$45.00 |
$52.50 |
$50.40 |
| 64 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$5,950.00 |
$32,750.00 |
$22,000.00 |
| 65 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 348 | LF |
$25.00 |
$48.00 |
$62.50 |
$65.00 |
| 66 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 50 | EA |
$1.25 |
$2.00 |
$5.50 |
$6.00 |
| 67 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$9,000.00 |
$4,400.00 |
$4,800.00 |