| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$9,000.00 |
$24,000.00 |
$16,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,635 | CY |
$5.00 |
$6.00 |
$7.50 |
$5.00 |
$5.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,425 | CY |
$8.00 |
$8.00 |
$7.50 |
$9.00 |
$7.15 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$5,500.00 |
$12,377.79 |
$7,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$3.50 |
$2.50 |
$3.30 |
$3.32 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.00 |
$7.00 |
$7.00 |
$11.06 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,800 | SY |
$3.00 |
$1.95 |
$1.62 |
$1.60 |
$1.75 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.85 | AC |
$600.00 |
$600.00 |
$200.00 |
$552.82 |
$500.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 798 | TON |
$30.00 |
$26.25 |
$25.31 |
$36.65 |
$27.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$400.00 |
$250.00 |
$257.50 |
$300.00 |
$245.00 |
| 11 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 278 | TON |
$45.00 |
$39.50 |
$37.86 |
$60.00 |
$48.00 |
| 12 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 190 | LF |
$40.00 |
$25.50 |
$22.00 |
$36.68 |
$47.00 |
| 13 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$900.00 |
$900.00 |
$850.00 |
$801.82 |
$955.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 88 | CY |
$25.00 |
$12.00 |
$10.00 |
$15.36 |
$15.00 |
| 15 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 90 | CY |
$10.00 |
$12.00 |
$10.00 |
$11.80 |
$19.00 |
| 16 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 552.34 | LF |
$230.00 |
$163.50 |
$162.00 |
$165.00 |
$196.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 416.17 | LF |
$210.00 |
$180.00 |
$175.00 |
$180.00 |
$208.00 |
| 18 | 504(C) 6250 |
SEALED EXPANSION JOINT | 67 | LF |
$250.00 |
$195.00 |
$250.00 |
$294.41 |
$252.00 |
| 19 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 555.17 | LF |
$65.00 |
$48.00 |
$68.00 |
$72.09 |
$77.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 650 | LB |
$4.00 |
$3.30 |
$3.00 |
$3.38 |
$4.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,600.00 |
$410.00 |
$650.00 |
$541.82 |
$817.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,600.00 |
$490.00 |
$650.00 |
$541.82 |
$817.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 185.6 | CY |
$525.00 |
$450.00 |
$500.00 |
$500.00 |
$590.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 118.2 | CY |
$500.00 |
$450.00 |
$525.00 |
$600.00 |
$622.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 57,920 | LB |
$1.00 |
$0.9500 |
$0.8700 |
$1.09 |
$1.00 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 290 | LF |
$35.00 |
$24.50 |
$27.30 |
$27.86 |
$45.00 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 686 | LF |
$40.00 |
$32.50 |
$30.80 |
$36.42 |
$55.00 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 290 | LF |
$15.00 |
$12.00 |
$11.70 |
$17.74 |
$22.50 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 686 | LF |
$20.00 |
$10.00 |
$13.20 |
$17.79 |
$24.00 |
| 30 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 244 | LF |
$700.00 |
$497.00 |
$525.00 |
$425.00 |
$602.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,445 | TON |
$50.00 |
$35.35 |
$35.76 |
$50.00 |
$45.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 395 | TON |
$45.00 |
$35.00 |
$28.15 |
$44.35 |
$36.00 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 62 | LF |
$24.00 |
$47.00 |
$30.00 |
$14.74 |
$20.00 |
| 34 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$7.00 |
$30.00 |
$13.00 |
$20.00 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$10,000.00 |
$8,500.00 |
$10,582.39 |
$25,000.00 |
| 36 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,300.00 |
$2,200.00 |
$2,180.00 |
$2,189.17 |
$2,400.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$3,750.00 |
$2,500.00 |
$1,702.68 |
$2,400.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$4,700.00 |
$8,845.12 |
$8,500.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,800.00 |
$2,800.00 |
$2,981.52 |
$8,000.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$38,000.00 |
$47,000.00 |
$70,000.00 |
$23,000.00 |