BRIDGE AND APPROACHES COUNTY ROAD (NS-307): OVER WALNUT CREEK , 4.6 MILES NORTH OF SH-39. PROJECT LENGTH = 0.264 MILES

Let date
Thursday, January 17, 2013
Contract
130043
J/P numbers
21139(04)
District
Division 3
County
Mcclain
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-307): OVER WALNUT CREEK , 4.6 MILES NORTH OF SH-39. PROJECT LENGTH = 0.264 MILES
Project number
STP-144D(074)AG

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 BRIDGECO CONTRACTORS, INC. Low bidder $853,028
2 K & R BUILDERS, INC. $899,531 +5.5%
3 Allen Contracting, Inc. $995,504 +16.7%
4 Cimarron Construction Company, LLC $1,054,158 +23.6%

Bid tab: unit prices 40 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 K & R BUILDERS,…#3 Allen Contracti…#4 Cimarron Constr…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $6,000.00 $9,000.00 $24,000.00 $16,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION6,635CY $5.00 $6.00 $7.50 $5.00 $5.30
3202(D) 0184 UNCLASSIFIED BORROW1,425CY $8.00 $8.00 $7.50 $9.00 $7.15
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $15,000.00 $6,000.00 $5,500.00 $12,377.79 $7,000.00
5221(C) 2801 TEMPORARY SILT FENCE500LF $3.50 $2.50 $3.30 $3.32 $3.00
6221(F) 0100 TEMPORARY SILT DIKE500LF $7.00 $7.00 $7.00 $11.06 $10.00
7230(A) 2806 SOLID SLAB SODDING13,800SY $3.00 $1.95 $1.62 $1.60 $1.75
8233(A) 2817 VEGETATIVE MULCHING2.85AC $600.00 $600.00 $200.00 $552.82 $500.00
9402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E798TON $30.00 $26.25 $25.31 $36.65 $27.00
10509(D) 0325 CLASS C CONCRETE20CY $400.00 $250.00 $257.50 $300.00 $245.00
11601(A) 0297 TYPE I PLAIN RIPRAP278TON $45.00 $39.50 $37.86 $60.00 $48.00
12613(B) 0690 24" CORR. GALV. STEEL PIPE190LF $40.00 $25.50 $22.00 $36.68 $47.00
13613(M) 7187 TYPE B4 CULVERT END TREATMENT6EA $900.00 $900.00 $850.00 $801.82 $955.00
14501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON88CY $25.00 $12.00 $10.00 $15.36 $15.00
15501(D) 6353 UNCLASSIFIED BACKFILL90CY $10.00 $12.00 $10.00 $11.80 $19.00
16503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)552.34LF $230.00 $163.50 $162.00 $165.00 $196.00
17503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)416.17LF $210.00 $180.00 $175.00 $180.00 $208.00
18504(C) 6250 SEALED EXPANSION JOINT67LF $250.00 $195.00 $250.00 $294.41 $252.00
19504(E) 1380 CONCRETE RAIL (TR1)555.17LF $65.00 $48.00 $68.00 $72.09 $77.00
20506(A) 1322 STRUCTURAL STEEL650LB $4.00 $3.30 $3.00 $3.38 $4.00
21507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $1,600.00 $410.00 $650.00 $541.82 $817.00
22507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $1,600.00 $490.00 $650.00 $541.82 $817.00
23509(A) 1326 CLASS AA CONCRETE185.6CY $525.00 $450.00 $500.00 $500.00 $590.00
24509(B) 1328 CLASS A CONCRETE118.2CY $500.00 $450.00 $525.00 $600.00 $622.00
25511(A) 1332 REINFORCING STEEL57,920LB $1.00 $0.9500 $0.8700 $1.09 $1.00
26514(A) 6010 PILES, FURNISHED (HP 10X42)290LF $35.00 $24.50 $27.30 $27.86 $45.00
27514(A) 6011 PILES, FURNISHED (HP 12X53)686LF $40.00 $32.50 $30.80 $36.42 $55.00
28514(B) 6292 PILES, DRIVEN (HP 10X42)290LF $15.00 $12.00 $11.70 $17.74 $22.50
29514(B) 6294 PILES, DRIVEN (HP 12X53)686LF $20.00 $10.00 $13.20 $17.79 $24.00
30516(A) 6096 DRILLED SHAFTS 60" DIAMETER244LF $700.00 $497.00 $525.00 $425.00 $602.00
31601(B) 1353 TYPE I-A PLAIN RIPRAP1,445TON $50.00 $35.35 $35.76 $50.00 $45.00
32601(C) 1355 TYPE I-A FILTER BLANKET395TON $45.00 $35.00 $28.15 $44.35 $36.00
33613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND62LF $24.00 $47.00 $30.00 $14.74 $20.00
34613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $25.00 $7.00 $30.00 $13.00 $20.00
35619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $6,000.00 $10,000.00 $8,500.00 $10,582.39 $25,000.00
36623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)4EA $2,300.00 $2,200.00 $2,180.00 $2,189.17 $2,400.00
37880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $2,000.00 $3,750.00 $2,500.00 $1,702.68 $2,400.00
38642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,000.00 $5,000.00 $4,700.00 $8,845.12 $8,500.00
39220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $2,800.00 $2,800.00 $2,981.52 $8,000.00
40641 1399 MOBILIZATION1LSUM $45,000.00 $38,000.00 $47,000.00 $70,000.00 $23,000.00