| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,135 | CY |
$6.00 |
$5.85 |
$7.00 |
$7.95 |
$6.28 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$25,500.00 |
$36,500.00 |
$42,000.00 |
$58,007.87 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 600 | LF |
$1.50 |
$1.80 |
$2.50 |
$1.53 |
$3.49 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 700 | LF |
$7.00 |
$7.00 |
$10.00 |
$5.58 |
$9.29 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 13,500 | SY |
$1.50 |
$1.48 |
$2.00 |
$1.58 |
$2.09 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.79 | AC |
$450.00 |
$825.00 |
$700.00 |
$300.00 |
$697.08 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 469 | TON |
$26.00 |
$40.29 |
$41.00 |
$36.09 |
$31.46 |
| 8 | 509(D) 0325 |
CLASS C CONCRETE | 57.63 | CY |
$250.00 |
$300.00 |
$275.00 |
$323.75 |
$297.38 |
| 9 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 368 | LF |
$38.00 |
$69.00 |
$36.00 |
$45.00 |
$63.62 |
| 10 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 8 | EA |
$1,000.00 |
$1,512.00 |
$1,200.00 |
$1,500.00 |
$1,282.88 |
| 11 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 5.18 | SF |
$20.00 |
$20.00 |
$65.00 |
$25.00 |
$29.04 |
| 12 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 12 | LF |
$16.00 |
$15.00 |
$25.00 |
$25.00 |
$9.30 |
| 13 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$10.00 |
$11.30 |
$10.00 |
$8.25 |
$13.97 |
| 14 | 501(F) 6352 |
GRANULAR BACKFILL | 80 | CY |
$40.00 |
$63.20 |
$70.00 |
$67.00 |
$90.83 |
| 15 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 317.34 | LF |
$160.00 |
$182.50 |
$190.00 |
$179.00 |
$211.16 |
| 16 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 298.67 | LF |
$170.00 |
$182.50 |
$192.00 |
$186.00 |
$203.09 |
| 17 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35.17 | LF |
$230.00 |
$225.00 |
$235.00 |
$255.00 |
$277.73 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 368.8 | LF |
$60.00 |
$59.50 |
$72.00 |
$69.50 |
$80.75 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 1,370 | LB |
$2.50 |
$2.30 |
$2.00 |
$2.50 |
$3.14 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$700.00 |
$825.00 |
$460.00 |
$770.00 |
$907.18 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$700.00 |
$825.00 |
$460.00 |
$770.00 |
$907.18 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 153.2 | CY |
$480.00 |
$468.00 |
$450.00 |
$540.00 |
$642.53 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 122.2 | CY |
$500.00 |
$500.00 |
$450.00 |
$562.50 |
$646.45 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 52,561 | LB |
$0.9000 |
$0.9000 |
$0.9500 |
$0.8700 |
$0.9000 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 200 | LF |
$30.00 |
$29.00 |
$27.00 |
$26.60 |
$38.53 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 500 | LF |
$32.00 |
$37.50 |
$35.00 |
$32.90 |
$45.08 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 200 | LF |
$12.00 |
$7.00 |
$18.00 |
$11.40 |
$11.81 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 500 | LF |
$12.00 |
$9.00 |
$12.00 |
$14.10 |
$15.75 |
| 29 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 228 | LF |
$500.00 |
$390.00 |
$460.62 |
$457.00 |
$548.27 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,800 | TON |
$35.00 |
$43.25 |
$44.00 |
$44.53 |
$51.85 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 950 | TON |
$25.00 |
$36.50 |
$40.00 |
$37.34 |
$40.92 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$20.00 |
$44.00 |
$47.00 |
$30.00 |
$20.20 |
| 33 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 28 | LF |
$15.00 |
$50.00 |
$8.00 |
$30.00 |
$20.20 |
| 34 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 235 | LF |
$20.00 |
$16.00 |
$17.00 |
$16.73 |
$17.66 |
| 35 | 623(F) 6030 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$500.00 |
$600.00 |
$1,250.00 |
$661.25 |
$668.04 |
| 36 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,300.00 |
$2,000.00 |
$2,050.00 |
$2,117.50 |
$2,236.47 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,100.00 |
$2,750.00 |
$2,614.06 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,000.00 |
$5,250.00 |
$6,000.00 |
$8,713.50 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,065.00 |
$2,800.00 |
$2,800.00 |
$8,801.56 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$18,000.00 |
$36,500.00 |
$35,000.00 |
$35,500.00 |
$8,844.29 |