| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$10,000.00 |
$10,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$35,000.00 |
$59,713.50 |
$85,000.00 |
$62,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$6,800.00 |
$7,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,200 | LF |
$3.00 |
$2.00 |
$1.70 |
$2.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$7.50 |
$8.00 |
$8.20 |
$10.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 8,500 | SY |
$3.00 |
$1.80 |
$2.07 |
$2.25 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.59 | AC |
$1,000.00 |
$800.00 |
$300.00 |
$800.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,057 | TON |
$30.00 |
$38.00 |
$26.03 |
$40.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$266.00 |
$245.00 |
$250.00 |
| 10 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 36 | LF |
$60.00 |
$60.00 |
$70.00 |
$75.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 172 | LF |
$36.00 |
$35.00 |
$26.00 |
$49.00 |
| 12 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,100.00 |
$1,000.00 |
$890.00 |
| 13 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$900.00 |
$1,290.00 |
$850.00 |
$765.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 168 | CY |
$12.00 |
$19.00 |
$9.00 |
$15.00 |
| 15 | 501(F) 6352 |
GRANULAR BACKFILL | 64 | CY |
$60.00 |
$66.00 |
$70.00 |
$92.00 |
| 16 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 258.4 | LF |
$70.00 |
$81.00 |
$71.00 |
$87.00 |
| 17 | 506(A) 1322 |
STRUCTURAL STEEL | 89,450 | LB |
$2.50 |
$1.43 |
$1.61 |
$2.07 |
| 18 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$400.00 |
$2,080.00 |
$1,500.00 |
$2,700.00 |
| 19 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$800.00 |
$2,080.00 |
$1,500.00 |
$2,700.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 74.7 | CY |
$450.00 |
$558.00 |
$600.00 |
$630.00 |
| 21 | 509(B) 1328 |
CLASS A CONCRETE | 63.2 | CY |
$450.00 |
$673.00 |
$585.00 |
$620.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 8,700 | LB |
$1.00 |
$0.8000 |
$0.9000 |
$1.00 |
| 23 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 17,900 | LB |
$1.50 |
$1.00 |
$1.03 |
$1.20 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 114 | LF |
$30.00 |
$40.00 |
$27.30 |
$56.00 |
| 25 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 245 | LF |
$40.00 |
$53.00 |
$35.70 |
$77.00 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 114 | LF |
$15.00 |
$10.00 |
$11.70 |
$30.00 |
| 27 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 245 | LF |
$18.00 |
$10.00 |
$15.30 |
$35.00 |
| 28 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,050 | TON |
$45.00 |
$48.00 |
$41.69 |
$59.00 |
| 29 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 500 | TON |
$40.00 |
$45.00 |
$33.33 |
$48.00 |
| 30 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$7.00 |
$33.00 |
$20.00 |
| 31 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$7.00 |
$34.00 |
$20.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$5,000.00 |
$13,000.00 |
| 33 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,250.00 |
$1,900.00 |
$2,300.00 |
$2,400.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,725.00 |
$2,200.00 |
$2,100.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$6,600.00 |
$9,500.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,300.00 |
$6,100.00 |
| 37 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$32,500.00 |
$29,100.00 |
$41,800.00 |
$11,500.00 |