| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,572 | CY |
$8.00 |
$10.00 |
$13.85 |
$10.00 |
$12.50 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$8.00 |
$10.00 |
$11.90 |
$14.00 |
$15.16 |
| 3 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$75,000.00 |
$350,000.00 |
$274,000.00 |
$358,122.00 |
$712,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,450 | LF |
$1.75 |
$2.00 |
$1.78 |
$2.00 |
$3.48 |
| 5 | 232(B) 2814 |
SEEDING METHOD B | 9.9 | AC |
$700.00 |
$1,000.00 |
$788.00 |
$788.00 |
$2,000.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.9 | AC |
$600.00 |
$1,000.00 |
$788.00 |
$788.00 |
$2,000.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,750 | CY |
$40.00 |
$65.00 |
$67.00 |
$39.27 |
$51.62 |
| 8 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 1,146.84 | LF |
$5.00 |
$20.00 |
$13.00 |
$5.77 |
$10.94 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 104 | TON |
$26.00 |
$40.00 |
$32.60 |
$38.50 |
$35.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,100 | TON |
$80.00 |
$110.00 |
$97.01 |
$85.00 |
$121.26 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,100 | TON |
$80.00 |
$110.00 |
$96.81 |
$99.00 |
$121.01 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$500.00 |
$325.00 |
$645.91 |
| 13 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 85 | LF |
$25.00 |
$65.00 |
$29.50 |
$28.50 |
$15.31 |
| 14 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 4 | EA |
$100.00 |
$750.00 |
$150.00 |
$690.00 |
$862.50 |
| 15 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,244 | LF |
$3.50 |
$5.00 |
$4.00 |
$3.52 |
$4.40 |
| 16 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 212.5 | LF |
$35.00 |
$45.00 |
$44.00 |
$52.00 |
$35.00 |
| 17 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,982 | CY |
$20.00 |
$10.00 |
$20.00 |
$17.38 |
$38.27 |
| 18 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 1,197 | TON |
$35.00 |
$45.00 |
$30.00 |
$45.00 |
$81.85 |
| 19 | 613(B) 4534 |
71" X 47" CORR. GALV. STEEL PIPE ARCH | 308 | LF |
$50.00 |
$100.00 |
$80.00 |
$95.75 |
$236.17 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 240 | CY |
$10.00 |
$12.00 |
$15.00 |
$17.54 |
$26.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 148 | CY |
$55.00 |
$70.00 |
$50.00 |
$54.25 |
$125.44 |
| 22 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 5,786.7 | LF |
$275.00 |
$220.00 |
$250.00 |
$262.50 |
$281.71 |
| 23 | 503(C) 6175 |
PRESTRESSED CONCRETE DECK PANELS | 28,320 | SF |
$9.00 |
$10.00 |
$10.00 |
$16.37 |
$13.60 |
| 24 | 504 6176 |
INSERTS | 644 | EA |
$35.00 |
$22.00 |
$15.00 |
$17.55 |
$45.31 |
| 25 | 504(B) 1305 |
SAW-CUT GROOVING | 4,490 | SY |
$5.00 |
$5.00 |
$5.00 |
$4.00 |
$5.20 |
| 26 | 504(C) 6250 |
SEALED EXPANSION JOINT | 175.85 | LF |
$250.00 |
$200.00 |
$200.00 |
$230.07 |
$495.37 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 2,977.2 | LF |
$65.00 |
$70.00 |
$100.00 |
$74.15 |
$94.29 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 10,060 | LB |
$2.50 |
$3.50 |
$2.75 |
$1.60 |
$4.00 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 40 | EA |
$850.00 |
$1,500.00 |
$2,000.00 |
$1,262.00 |
$1,539.13 |
| 30 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 40 | EA |
$850.00 |
$1,500.00 |
$2,000.00 |
$1,262.00 |
$1,539.13 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 1,172 | CY |
$500.00 |
$650.00 |
$550.00 |
$685.00 |
$677.55 |
| 32 | 509(B) 1328 |
CLASS A CONCRETE | 451.5 | CY |
$525.00 |
$550.00 |
$750.00 |
$645.00 |
$792.47 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 290,010 | LB |
$0.8500 |
$1.20 |
$1.00 |
$1.06 |
$1.04 |
| 34 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 260 | LF |
$32.00 |
$30.00 |
$23.00 |
$25.14 |
$56.77 |
| 35 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,440 | LF |
$45.00 |
$32.00 |
$25.00 |
$46.42 |
$59.89 |
| 36 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 260 | LF |
$12.00 |
$35.00 |
$10.00 |
$4.66 |
$10.40 |
| 37 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,440 | LF |
$12.00 |
$35.00 |
$12.00 |
$6.16 |
$10.40 |
| 38 | 516 6200 |
(SP)CLASS T CONCRETE | 350 | CY |
$200.00 |
$500.00 |
$250.00 |
$348.82 |
$397.90 |
| 39 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,515 | LF |
$1,000.00 |
$1,100.00 |
$1,220.00 |
$1,197.26 |
$1,578.41 |
| 40 | 516(A) 6200 |
(SP)RE-DRILL GROUTED SHAFTS | 450 | LF |
$200.00 |
$250.00 |
$100.00 |
$399.61 |
$130.00 |
| 41 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 18 | EA |
$1,500.00 |
$1,000.00 |
$3,000.00 |
$471.00 |
$1,755.00 |
| 42 | 516(D) 6400 |
CSL ACCESS TUBES | 11,186 | LF |
$5.00 |
$8.00 |
$10.00 |
$7.59 |
$7.36 |
| 43 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 500 | TON |
$35.00 |
$50.00 |
$40.00 |
$45.00 |
$50.23 |
| 44 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 500 | TON |
$25.00 |
$40.00 |
$30.00 |
$38.28 |
$45.81 |
| 45 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$20.00 |
$15.00 |
$20.00 |
$26.19 |
$60.61 |
| 46 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 26 | LF |
$20.00 |
$15.00 |
$20.00 |
$39.08 |
$32.92 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$175,000.00 |
$75,000.00 |
$51,028.00 |
$304,200.00 |
| 48 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,000.00 |
$2,300.00 |
$2,440.00 |
$2,600.00 |
$3,380.00 |
| 49 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$13,300.00 |
$5,850.00 |
$7,605.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$100,000.00 |
$20,185.61 |
$35,250.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$3,500.00 |
$10,000.00 |
$18,750.00 |
$4,812.50 |
| 52 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$20,000.00 |
$30,000.00 |
$9,000.00 |
$23,125.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$350,000.00 |
$350,000.00 |
$328,793.62 |
$579,250.00 |