| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$6,500.00 |
$7,000.00 |
$4,000.00 |
$5,500.00 |
$7,700.00 |
$7,000.00 |
$5,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$22,500.00 |
$17,000.00 |
$17,500.00 |
$21,750.00 |
$24,000.00 |
$16,720.00 |
$15,200.00 |
$18,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$3,000.00 |
$4,000.00 |
$4,300.00 |
$4,000.00 |
$7,150.00 |
$6,500.00 |
$4,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,800 | LF |
$2.00 |
$1.00 |
$2.00 |
$1.40 |
$3.00 |
$2.00 |
$2.00 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 280 | LF |
$12.50 |
$1.00 |
$9.90 |
$6.50 |
$8.00 |
$8.95 |
$6.95 |
$6.95 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,050 | SY |
$2.00 |
$2.00 |
$2.25 |
$3.50 |
$3.00 |
$2.25 |
$2.00 |
$2.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.76 | AC |
$600.00 |
$300.00 |
$875.00 |
$250.00 |
$400.00 |
$795.00 |
$300.00 |
$300.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,080 | TON |
$45.00 |
$24.00 |
$30.00 |
$28.48 |
$31.00 |
$35.00 |
$6.00 |
$30.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$100.00 |
$300.00 |
$250.00 |
$250.00 |
$275.00 |
$500.00 |
$350.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 914 | TON |
$45.00 |
$36.50 |
$40.00 |
$39.44 |
$39.00 |
$48.00 |
$60.00 |
$40.00 |
| 11 | 602(C) 4155 |
FILTER FABRIC | 1,390 | SY |
$3.00 |
$1.20 |
$3.59 |
$3.00 |
$3.00 |
$1.20 |
$2.00 |
$3.00 |
| 12 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 60 | LF |
$30.00 |
$30.00 |
$25.50 |
$45.00 |
$32.00 |
$24.00 |
$45.00 |
$58.00 |
| 13 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$225.00 |
$300.00 |
$170.00 |
$260.00 |
$250.00 |
$350.00 |
$450.00 |
$350.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 86 | CY |
$10.00 |
$20.00 |
$10.00 |
$8.00 |
$10.00 |
$15.00 |
$22.00 |
$28.00 |
| 15 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 68 | CY |
$10.00 |
$20.00 |
$10.00 |
$10.00 |
$12.00 |
$25.00 |
$22.00 |
$50.00 |
| 16 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 156.17 | LF |
$150.00 |
$225.00 |
$175.00 |
$196.00 |
$193.76 |
$235.00 |
$275.00 |
$240.00 |
| 17 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 145.17 | LF |
$60.00 |
$110.00 |
$55.00 |
$69.00 |
$60.00 |
$75.00 |
$75.00 |
$70.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 1,530 | LB |
$2.50 |
$6.00 |
$4.00 |
$3.25 |
$2.50 |
$3.50 |
$5.50 |
$3.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 32.1 | CY |
$400.00 |
$500.00 |
$600.00 |
$510.00 |
$500.00 |
$750.00 |
$800.00 |
$750.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 54.2 | CY |
$400.00 |
$500.00 |
$600.00 |
$522.00 |
$500.00 |
$600.00 |
$550.00 |
$750.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 15,306 | LB |
$0.9500 |
$1.50 |
$1.00 |
$0.9400 |
$1.25 |
$1.00 |
$1.65 |
$1.00 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 800 | LF |
$25.00 |
$16.00 |
$24.00 |
$24.50 |
$28.00 |
$35.00 |
$35.00 |
$28.85 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 800 | LF |
$10.00 |
$8.00 |
$11.00 |
$10.50 |
$8.00 |
$10.00 |
$12.00 |
$25.00 |
| 24 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 520 | TON |
$45.00 |
$36.50 |
$40.00 |
$40.44 |
$39.00 |
$48.00 |
$60.00 |
$43.00 |
| 25 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 110 | TON |
$45.00 |
$26.08 |
$31.00 |
$30.08 |
$35.00 |
$43.00 |
$35.00 |
$40.00 |
| 26 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$7,000.00 |
$7,000.00 |
$4,100.00 |
$5,000.00 |
$3,500.00 |
$10,000.00 |
$10,000.00 |
| 27 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,750.00 |
$2,000.00 |
$1,975.00 |
$2,000.00 |
$1,900.00 |
$2,200.00 |
$1,795.00 |
$1,795.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$2,100.00 |
$2,420.00 |
$2,000.00 |
$2,760.00 |
$2,310.00 |
$1,700.00 |
$1,700.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,000.00 |
$3,500.00 |
$5,225.00 |
$5,225.00 |
$6,000.00 |
$4,750.00 |
$5,800.00 |
$7,000.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$1,500.00 |
$2,000.00 |
$2,800.00 |
$2,000.00 |
$2,950.00 |
$1,200.00 |
$3,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$19,650.00 |
$10,000.00 |
$10,000.00 |
$18,500.00 |
$17,000.00 |
$15,000.00 |
$10,000.00 |
$28,000.00 |