Bid tab 110386

Let Aug 18, 2011 · Division 8 · Osage Sign up free

‹ Aug 2011 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-365): OVER CLEAR CREEK, 1.0 MILE SOUTH OF THE US-60 JUNCTION. PROJECT LENGTH = 0.204 MILES

Let date
Thursday, August 18, 2011
Contract
110386
J/P numbers
23987(04)
District
Division 8
County
Osage
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-365): OVER CLEAR CREEK, 1.0 MILE SOUTH OF THE US-60 JUNCTION. PROJECT LENGTH = 0.204 MILES
Project number
BRO-157D(094)CO

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$704,762
1 BELK BRIDGE, INC. Low bidder $643,520 -8.7%
2 K & R BUILDERS, INC. $661,819 -6.1% +2.8%
3 B & B BRIDGE COMPANY, LLC $680,463 -3.4% +5.7%
4 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $729,087 +3.5% +13.3%
5 Reece Construction Co, Inc. $753,983 +7.0% +17.2%
6 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $819,512 +16.3% +27.3%
7 King Construction CO., INC. $853,335 +21.1% +32.6%

Bid tab: unit prices 40 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BELK BRIDGE, IN…#2 K & R BUILDERS,…#3 B & B BRIDGE CO…#4 OBC, INC./PLAIN…#5 Reece Construct…#6 WILDCAT CONSTRU…#7 King Constructi…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $3,000.00 $4,840.00 $5,000.00 $5,250.00 $4,118.00 $5,000.00 $5,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,854CY $5.00 $5.75 $5.92 $5.00 $6.83 $6.00 $4.00 $7.00
3202(D) 0184 UNCLASSIFIED BORROW560CY $8.00 $6.75 $7.92 $6.50 $9.19 $11.00 $15.00 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $3,000.00 $3,670.00 $4,000.00 $5,250.00 $4,575.00 $6,000.00 $7,500.00
5221(C) 2801 TEMPORARY SILT FENCE1,282LF $2.50 $1.00 $1.20 $1.70 $3.05 $2.00 $2.00 $2.50
6221(F) 0100 TEMPORARY SILT DIKE112LF $8.00 $2.00 $7.05 $7.00 $17.32 $6.00 $6.00 $12.95
7230(A) 2806 SOLID SLAB SODDING5,000SY $1.50 $1.59 $1.68 $1.80 $1.67 $1.49 $1.70 $1.49
8232(A) 2813 SEEDING METHOD A1AC $1,000.00 $725.00 $300.00 $1,600.00 $761.25 $295.00 $1,000.00 $295.00
9233(A) 2817 VEGETATIVE MULCHING1AC $750.00 $725.00 $250.00 $600.00 $761.25 $695.00 $500.00 $695.00
10303(B) 2110 AGGREGATE BASE TYPE B650CY $45.00 $35.00 $40.65 $38.75 $37.80 $45.00 $31.00 $36.00
11509(D) 0325 CLASS C CONCRETE10CY $250.00 $100.00 $250.00 $200.00 $200.54 $266.00 $400.00 $325.00
12613(B) 0689 18" CORR. GALV. STEEL PIPE38LF $28.00 $40.00 $28.63 $22.50 $34.65 $27.00 $50.00 $28.00
13613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $750.00 $200.00 $197.50 $275.00 $787.50 $454.00 $280.00 $800.00
14623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE250LF $17.00 $14.50 $16.00 $14.50 $19.95 $19.00 $16.00 $19.00
15623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,000.00 $2,150.00 $2,350.00 $2,150.00 $2,205.00 $2,100.00 $2,200.00 $2,100.00
16501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON84CY $12.00 $15.00 $8.42 $24.00 $22.00 $36.00 $11.00 $50.00
17501(G) 6309 CLSM BACKFILL80CY $100.00 $100.00 $115.00 $89.00 $94.16 $127.00 $155.00 $100.00
18503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)830LF $180.00 $170.00 $164.00 $175.00 $179.77 $194.00 $230.00 $180.00
19504(A) 1304 APPROACH SLAB99SY $165.00 $100.00 $135.00 $155.00 $112.68 $266.00 $145.00 $205.00
20504(D) 6239 CONCRETE RAIL (TR3)489LF $60.00 $75.00 $61.00 $53.00 $48.10 $68.00 $100.00 $65.00
21506(A) 1322 STRUCTURAL STEEL4,550LB $2.75 $4.00 $0.5000 $1.55 $3.95 $3.00 $2.00 $2.00
22507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY24EA $750.00 $500.00 $550.00 $800.00 $566.51 $487.00 $710.00 $700.00
23509(A) 1326 CLASS AA CONCRETE192CY $450.00 $330.00 $448.40 $375.00 $441.73 $450.00 $450.00 $755.00
24509(B) 1328 CLASS A CONCRETE116CY $300.00 $330.00 $460.00 $375.00 $438.23 $507.00 $450.00 $755.00
25511(A) 1332 REINFORCING STEEL72,155LB $0.8000 $1.00 $0.8200 $0.7500 $0.8100 $0.8000 $0.9500 $1.10
26514(A) 6010 PILES, FURNISHED (HP 10X42)112LF $25.00 $18.00 $31.15 $27.75 $27.19 $40.00 $25.00 $25.00
27514(A) 6011 PILES, FURNISHED (HP 12X53)235LF $30.00 $20.00 $36.05 $38.00 $33.67 $51.00 $35.00 $33.00
28514(B) 6292 PILES, DRIVEN (HP 10X42)112LF $10.00 $9.00 $13.35 $20.50 $11.00 $10.00 $20.00 $10.00
29514(B) 6294 PILES, DRIVEN (HP 12X53)235LF $13.00 $10.00 $15.45 $24.00 $11.00 $10.00 $24.00 $12.00
30516(A) 6093 DRILLED SHAFTS 42" DIAMETER106LF $375.00 $500.00 $447.00 $550.00 $487.66 $505.00 $450.00 $350.00
31601(B) 1353 TYPE I-A PLAIN RIPRAP1,763TON $25.00 $24.50 $26.00 $25.00 $31.63 $31.00 $30.00 $25.00
32601(C) 1355 TYPE I-A FILTER BLANKET440TON $20.00 $19.50 $21.30 $23.00 $27.32 $26.00 $30.00 $20.00
33601(I) 6312 FILTER FABRIC (RIPRAP)1,683SY $2.50 $1.10 $2.50 $2.25 $2.19 $3.00 $4.30 $2.50
34613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND70LF $25.00 $40.00 $23.75 $20.00 $24.25 $14.00 $7.80 $5.00
35613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.20LF $25.00 $40.00 $27.50 $20.00 $29.86 $14.00 $7.80 $5.00
36619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $18,000.00 $7,670.00 $30,000.00 $16,500.00 $19,315.00 $35,000.00 $25,000.00
37880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,000.00 $2,550.00 $2,500.00 $2,200.00 $1,302.00 $1,240.00 $1,050.00 $1,240.00
38642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $3,000.00 $5,200.00 $2,300.00 $5,808.00 $5,450.00 $6,950.00 $4,650.00
39220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,250.00 $2,600.00 $2,000.00 $2,080.00 $2,500.00 $1,650.00 $4,000.00
40641 1399 MOBILIZATION1LSUM $56,470.00 $10,000.00 $17,670.00 $22,500.00 $36,441.34 $14,900.00 $42,000.00 $50,750.00