| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,263 | CY |
$6.28 |
$8.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 4,726 | CY |
$20.00 |
$10.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,500 | LF |
$5.00 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 660 | LF |
$5.00 |
$10.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 6,700 | SY |
$4.00 |
$1.30 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,768 | CY |
$25.00 |
$53.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 13,960 | SY |
$3.50 |
$3.50 |
| 9 | 407(B) 0250 |
TACK COAT | 1,788 | GAL |
$1.25 |
$2.25 |
| 10 | 408 5774 |
PRIME COAT | 660 | GAL |
$3.00 |
$7.00 |
| 11 | 409(A) 4242 |
FABRIC REINFORCEMENT | 10,896 | SY |
$3.00 |
$1.15 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,639 | TON |
$59.00 |
$74.00 |
| 13 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,937 | TON |
$63.00 |
$77.50 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 1,956 | SY |
$5.40 |
$3.85 |
| 15 | 426(C) 5097 |
FLY ASH | 638 | TON |
$50.00 |
$60.00 |
| 16 | 613(C) 4557 |
28" X 20" MILL PRECOATED CGSP | 180 | LF |
$31.80 |
$45.00 |
| 17 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$250.80 |
$250.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,500 | SY |
$5.50 |
$4.00 |
| 19 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 5,400 | SY |
$12.50 |
$6.00 |
| 20 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 400 | LF |
$6.00 |
$10.00 |
| 21 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$20.00 |
$23.00 |
| 22 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,000.00 |
$2,000.00 |
| 23 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 26 | CY |
$20.00 |
$50.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 48 | CY |
$600.00 |
$950.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 4,600 | LB |
$2.00 |
$1.00 |
| 26 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,480.00 |
$3,000.00 |
| 27 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,180 | LF |
$0.4000 |
$0.8500 |
| 28 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 10 | EA |
$150.00 |
$85.00 |
| 29 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 1,300 | LF |
$25.00 |
$25.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$45,000.00 |
$10,000.00 |
| 31 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$45.00 |
$21.00 |
| 32 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,000.00 |
| 33 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$20,000.00 |