| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$42,187.90 |
$40,000.00 |
$115,000.00 |
$22,500.00 |
$55,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 360,000 | CY |
$4.00 |
$4.32 |
$4.00 |
$4.75 |
$5.75 |
$4.30 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$26,526.89 |
$50,000.00 |
$37,000.00 |
$77,500.00 |
$50,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,750 | LF |
$2.00 |
$1.18 |
$1.40 |
$1.81 |
$1.75 |
$1.40 |
| 5 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 3 | EA |
$1,000.00 |
$493.50 |
$1.30 |
$150.00 |
$1,500.00 |
$1,000.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.50 |
$6.58 |
$10.00 |
$4.77 |
$6.75 |
$7.50 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 3,215 | LF |
$3.00 |
$1.16 |
$1.40 |
$2.23 |
$1.75 |
$1.30 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 104,908 | SY |
$1.78 |
$1.09 |
$1.40 |
$1.30 |
$1.40 |
$1.25 |
| 9 | 232(A) 2813 |
SEEDING METHOD A | 12 | AC |
$669.45 |
$329.00 |
$3,500.00 |
$300.00 |
$880.00 |
$375.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 14 | AC |
$450.00 |
$274.17 |
$400.00 |
$399.00 |
$660.00 |
$315.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 8,495 | CY |
$30.00 |
$42.21 |
$38.00 |
$43.00 |
$39.82 |
$41.00 |
| 12 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 600 | CY |
$35.00 |
$36.30 |
$38.00 |
$45.00 |
$40.32 |
$50.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 25,694 | SY |
$1.64 |
$1.16 |
$1.00 |
$1.50 |
$1.25 |
$1.40 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 25,694 | SY |
$2.50 |
$2.25 |
$2.50 |
$4.25 |
$2.50 |
$3.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,258 | TON |
$30.00 |
$20.77 |
$22.00 |
$18.75 |
$21.50 |
$25.00 |
| 16 | 407(B) 0250 |
TACK COAT | 2,600 | GAL |
$3.00 |
$3.67 |
$3.35 |
$2.25 |
$3.50 |
$3.75 |
| 17 | 408 5774 |
PRIME COAT | 9,839 | GAL |
$3.75 |
$4.17 |
$3.80 |
$0.5000 |
$4.00 |
$4.25 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,605 | TON |
$64.00 |
$64.51 |
$59.00 |
$65.00 |
$63.10 |
$65.50 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,500 | TON |
$68.00 |
$70.90 |
$65.00 |
$67.00 |
$69.40 |
$72.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 3,066 | SY |
$4.75 |
$2.91 |
$2.75 |
$2.00 |
$2.85 |
$3.00 |
| 21 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 7,400 | LF |
$0.6500 |
$0.8600 |
$0.8000 |
$0.6200 |
$0.8000 |
$0.8000 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 32 | CY |
$27.72 |
$7.68 |
$30.00 |
$35.00 |
$22.00 |
$20.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 75.3 | CY |
$475.00 |
$329.00 |
$400.00 |
$450.00 |
$500.00 |
$400.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 300 | CY |
$285.00 |
$263.20 |
$300.00 |
$425.00 |
$250.00 |
$350.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 13,827 | LB |
$1.25 |
$0.8200 |
$1.00 |
$0.7500 |
$1.25 |
$0.7500 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 21,250 | TON |
$32.00 |
$30.22 |
$34.00 |
$31.25 |
$28.00 |
$49.00 |
| 27 | 602(C) 4155 |
FILTER FABRIC | 10,585 | SY |
$3.00 |
$1.24 |
$1.00 |
$1.50 |
$2.20 |
$1.20 |
| 28 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 200 | LF |
$37.00 |
$70.40 |
$100.00 |
$40.50 |
$55.00 |
$44.00 |
| 29 | 613(G) 1081 |
12" P.V.C. PIPE ROUND | 106 | LF |
$30.00 |
$13.62 |
$30.00 |
$15.00 |
$20.00 |
$20.00 |
| 30 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,315 | LF |
$20.00 |
$10.14 |
$30.00 |
$12.00 |
$4.00 |
$16.00 |
| 31 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 415 | LF |
$25.00 |
$10.14 |
$30.00 |
$15.00 |
$4.00 |
$16.00 |
| 32 | 613(I) 1099 |
12" NON-PERF.PIPE UNDERDRAIN RND. | 400 | LF |
$30.00 |
$12.77 |
$30.00 |
$15.00 |
$8.00 |
$21.00 |
| 33 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$250.00 |
$383.84 |
$1,000.00 |
$1,350.00 |
$25,555.00 |
$1,650.00 |
| 34 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 358 | CY |
$40.00 |
$38.10 |
$40.00 |
$55.00 |
$30.00 |
$40.00 |
| 35 | 613(V) 1180 |
TRENCH EXCAVATION | 955 | CY |
$24.00 |
$1.00 |
$4.00 |
$12.00 |
$3.00 |
$3.50 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$4,217.83 |
$10,000.00 |
$22,000.00 |
$6,500.00 |
$10,000.00 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 43,577 | SY |
$3.25 |
$1.97 |
$1.90 |
$1.75 |
$2.10 |
$1.00 |
| 38 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$5,000.00 |
$4,217.83 |
$10,000.00 |
$25,000.00 |
$5,500.00 |
$5,000.00 |
| 39 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,740 | LF |
$4.00 |
$1.68 |
$4.00 |
$3.50 |
$2.25 |
$5.00 |
| 40 | 619(C) 0924 |
SAWING PAVEMENT | 492 | LF |
$5.00 |
$3.84 |
$5.00 |
$6.50 |
$3.60 |
$2.75 |
| 41 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 270 | SD |
$200.00 |
$191.92 |
$185.00 |
$175.00 |
$185.00 |
$200.00 |
| 42 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 25,000 | LF |
$0.2000 |
$0.1300 |
$0.1500 |
$0.1300 |
$0.1300 |
$0.3000 |
| 43 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,200 | LF |
$0.2000 |
$0.1600 |
$0.1500 |
$0.1600 |
$0.1600 |
$0.3000 |
| 44 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 270 | SD |
$32.00 |
$10.97 |
$12.00 |
$10.50 |
$11.00 |
$2.50 |
| 45 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,560 | SD |
$1.00 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.2600 |
$0.6000 |
| 46 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,620 | SD |
$1.00 |
$2.74 |
$2.75 |
$2.55 |
$2.70 |
$2.50 |
| 47 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,940 | SD |
$2.15 |
$1.10 |
$1.25 |
$1.10 |
$1.10 |
$1.25 |
| 48 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,320 | SD |
$0.2500 |
$0.1100 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.3000 |
| 49 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$2.15 |
$2.19 |
$2.25 |
$2.10 |
$2.15 |
$0.3000 |
| 50 | 880(D) 8854 |
VERTICAL PANELS | 29,600 | SD |
$0.0500 |
$0.1100 |
$0.1500 |
$0.1200 |
$0.1100 |
$0.1500 |
| 51 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,560 | SD |
$0.1000 |
$0.1600 |
$0.2000 |
$0.1600 |
$0.1600 |
$0.3000 |
| 52 | 880(F) 8878 |
DRUMS | 29,160 | SD |
$0.1000 |
$0.1100 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1500 |
| 53 | 880(G) 8890 |
CHANNELIZER CONES | 3,600 | SD |
$0.1000 |
$0.1100 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1500 |
| 54 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 540 | SD |
$13.00 |
$21.93 |
$25.00 |
$20.00 |
$21.50 |
$30.00 |
| 55 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 8.5 | SF |
$30.00 |
$16.45 |
$20.00 |
$17.00 |
$16.00 |
$35.00 |
| 56 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 17,000 | LF |
$0.5000 |
$0.6600 |
$0.7500 |
$0.6300 |
$0.6500 |
$0.8000 |
| 57 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$54,000.00 |
$35,093.52 |
$25,000.00 |
$35,000.00 |
$33,500.00 |
$50,000.00 |
| 58 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,600.00 |
$2,741.68 |
$5,000.00 |
$1,100.00 |
$2,500.00 |
$5,000.00 |
| 59 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,500.00 |
$3,838.35 |
$20,000.00 |
$10,000.00 |
$7,000.00 |
$18,000.00 |
| 60 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$129,596.55 |
$140,000.00 |
$250,000.00 |
$100,000.00 |
$220,000.00 |