| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,000 | CY |
$10.00 |
$9.87 |
$7.00 |
$15.00 |
$10.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$12.00 |
$12.85 |
$13.50 |
$15.00 |
$15.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.50 |
$1.88 |
$1.50 |
$1.80 |
$1.75 |
| 4 | 232(A) 2813 |
SEEDING METHOD A | 1 | AC |
$1,000.00 |
$1,059.19 |
$1,250.00 |
$2,500.00 |
$2,500.00 |
| 5 | 407(A) 4659 |
FOG SEAL | 33.76 | GAL |
$6.00 |
$10.03 |
$42.50 |
$15.00 |
$20.00 |
| 6 | 407(B) 0250 |
TACK COAT | 126.68 | GAL |
$4.00 |
$8.77 |
$9.00 |
$8.00 |
$3.00 |
| 7 | 408 5774 |
PRIME COAT | 197.58 | GAL |
$5.00 |
$12.53 |
$9.00 |
$7.00 |
$14.00 |
| 8 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 357.22 | TON |
$80.00 |
$145.46 |
$128.00 |
$250.00 |
$130.00 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 2,709.73 | SY |
$6.00 |
$8.89 |
$10.00 |
$8.00 |
$6.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 5.6 | CY |
$300.00 |
$243.98 |
$562.50 |
$1,500.00 |
$1,000.00 |
| 11 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,480 | LF |
$2.50 |
$1.07 |
$2.50 |
$3.00 |
$2.00 |
| 12 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$500.00 |
$589.14 |
$550.00 |
$200.00 |
$500.00 |
| 13 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,562.5 | LF |
$15.00 |
$15.98 |
$17.50 |
$14.60 |
$15.00 |
| 14 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,632.31 |
$2,400.00 |
$1,942.00 |
$2,100.00 |
| 15 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,754.88 |
$1,500.00 |
$1,466.00 |
$1,300.00 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$150.00 |
$244.43 |
$190.00 |
$300.00 |
$350.00 |
| 17 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$14,729.60 |
$10,000.00 |
$5,500.00 |
$5,000.00 |
| 18 | 504(A) 1304 |
APPROACH SLAB | 182.2 | SY |
$150.00 |
$193.12 |
$215.00 |
$165.00 |
$225.00 |
| 19 | 504(B) 1305 |
SAW-CUT GROOVING | 829 | SY |
$6.00 |
$4.51 |
$4.20 |
$8.00 |
$5.00 |
| 20 | 504(C) 6250 |
SEALED EXPANSION JOINT | 82 | LF |
$250.00 |
$244.91 |
$270.00 |
$200.00 |
$300.00 |
| 21 | 504(E) 6190 |
42" F-SHAPED PARAPET | 392 | LF |
$75.00 |
$88.29 |
$95.00 |
$96.00 |
$100.00 |
| 22 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 82 | LF |
$25.00 |
$20.21 |
$38.00 |
$18.00 |
$20.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$6.00 |
$9.40 |
$10.50 |
$8.00 |
$15.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 193.2 | CY |
$550.00 |
$460.44 |
$747.50 |
$955.00 |
$850.00 |
| 25 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 53,572 | LB |
$1.00 |
$0.8600 |
$1.04 |
$1.00 |
$1.50 |
| 26 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$6,400.00 |
$37,604.47 |
$12,500.00 |
$10,000.00 |
$40,000.00 |
| 27 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,825.00 |
$6,267.41 |
$2,500.00 |
$1,600.00 |
$750.00 |
| 28 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 311.7 | SY |
$4.50 |
$4.07 |
$4.00 |
$3.90 |
$4.00 |
| 29 | 523(A) 6550 |
SEALER CRACK PREPARATION | 41 | LF |
$5.00 |
$6.27 |
$6.00 |
$5.10 |
$3.00 |
| 30 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$175.00 |
$626.74 |
$250.00 |
$200.00 |
$55.00 |
| 31 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 48 | EA |
$30.00 |
$2,519.50 |
$2,877.00 |
$4,200.00 |
$4,500.00 |
| 32 | 540 4520 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | LSUM |
$500.00 |
$14,146.80 |
$5,250.00 |
$9,000.00 |
$4,500.00 |
| 33 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$18,802.23 |
$80,000.00 |
$46,000.00 |
$60,000.00 |
| 34 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$2,000.00 |
$1,880.22 |
$5,250.00 |
$4,500.00 |
$2,500.00 |
| 35 | 501(G) 6309 |
CLSM BACKFILL | 5 | CY |
$150.00 |
$244.43 |
$190.00 |
$300.00 |
$350.00 |
| 36 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$14,728.67 |
$10,000.00 |
$5,500.00 |
$5,000.00 |
| 37 | 504(A) 1304 |
APPROACH SLAB | 182.2 | SY |
$150.00 |
$193.21 |
$215.00 |
$165.00 |
$225.00 |
| 38 | 504(B) 1305 |
SAW-CUT GROOVING | 829 | SY |
$6.00 |
$4.51 |
$4.20 |
$8.00 |
$5.00 |
| 39 | 504(C) 6250 |
SEALED EXPANSION JOINT | 82 | LF |
$250.00 |
$236.17 |
$270.00 |
$200.00 |
$350.00 |
| 40 | 504(E) 6190 |
42" F-SHAPED PARAPET | 392 | LF |
$75.00 |
$88.29 |
$95.00 |
$96.00 |
$100.00 |
| 41 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 82 | LF |
$25.00 |
$20.21 |
$38.00 |
$18.00 |
$20.00 |
| 42 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$6.00 |
$9.40 |
$10.50 |
$8.00 |
$15.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 193.2 | CY |
$550.00 |
$460.44 |
$747.50 |
$955.00 |
$850.00 |
| 44 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 53,572 | LB |
$1.00 |
$0.8600 |
$1.04 |
$1.00 |
$1.50 |
| 45 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$6,400.00 |
$37,604.47 |
$12,500.00 |
$10,000.00 |
$40,000.00 |
| 46 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$1,825.00 |
$6,267.41 |
$2,500.00 |
$1,600.00 |
$750.00 |
| 47 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 311.7 | SY |
$4.50 |
$4.07 |
$4.00 |
$3.90 |
$4.00 |
| 48 | 523(A) 6550 |
SEALER CRACK PREPARATION | 41 | LF |
$5.00 |
$6.27 |
$6.00 |
$5.10 |
$3.00 |
| 49 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$175.00 |
$250.70 |
$250.00 |
$200.00 |
$55.00 |
| 50 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 48 | EA |
$30.00 |
$2,519.50 |
$2,877.00 |
$4,200.00 |
$4,500.00 |
| 51 | 540 4520 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | LSUM |
$500.00 |
$14,146.80 |
$5,250.00 |
$10,255.31 |
$4,500.00 |
| 52 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$18,802.23 |
$80,000.00 |
$46,000.00 |
$60,000.00 |
| 53 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$2,000.00 |
$1,880.22 |
$5,250.00 |
$4,500.00 |
$2,500.00 |
| 54 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,797 | LF |
$1.50 |
$0.9200 |
$0.7000 |
$0.6000 |
$0.6000 |
| 55 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 150 | SD |
$15.00 |
$25.07 |
$9.00 |
$8.00 |
$8.00 |
| 56 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,170 | LF |
$25.00 |
$45.13 |
$23.00 |
$34.00 |
$25.00 |
| 57 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,510 | LF |
$5.00 |
$3.13 |
$1.00 |
$1.00 |
$2.00 |
| 58 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 150 | SD |
$5.00 |
$7.52 |
$12.50 |
$10.00 |
$10.00 |
| 59 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 750 | SD |
$1.00 |
$1.25 |
$0.5500 |
$0.5000 |
$0.5000 |
| 60 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,000 | SD |
$1.00 |
$1.25 |
$0.1000 |
$0.0500 |
$0.0500 |
| 61 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,350 | SD |
$1.00 |
$1.25 |
$2.00 |
$1.70 |
$1.70 |
| 62 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,400 | SD |
$0.2000 |
$0.0400 |
$0.1000 |
$0.0500 |
$0.0500 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,500 | SD |
$0.1000 |
$0.3100 |
$0.8500 |
$0.7000 |
$0.7000 |
| 64 | 880(F) 8878 |
DRUMS | 6,000 | SD |
$0.2000 |
$0.1900 |
$0.1500 |
$0.1000 |
$0.1000 |
| 65 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$15,256.07 |
$9,401.12 |
$6,500.00 |
$6,000.00 |
$3,000.00 |
| 66 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$50,139.29 |
$45,000.00 |
$90,000.00 |
$100,085.00 |