Bid tab 110189

Let Oct 20, 2011 · Division 4 · Canadian Sign up free

‹ Oct 2011 results

BRIDGE REHABILITATION I -40: OVER MAYBERRY ROAD 5.0 MI WEST OF US -270. PROJECT LENGTH = 0.075 MILES

Let date
Thursday, October 20, 2011
Contract
110189
J/P numbers
28313(04)
District
Division 4
County
Canadian
Highway
Limits
BRIDGE REHABILITATION I -40: OVER MAYBERRY ROAD 5.0 MI WEST OF US -270. PROJECT LENGTH = 0.075 MILES
Project number
SBR-109N(181)SB

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$896,390
1 C-P INTEGRATED SERVICES, INC. Low bidder $1,207,042 +34.7%
2 K & R BUILDERS, INC. $1,386,492 +54.7% +14.9%
3 SCR CONSTRUCTION CO., INC. $1,594,955 +77.9% +32.1%
4 PBX Corporation $1,696,039 +89.2% +40.5%

Bid tab: unit prices 66 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C-P INTEGRATED …#2 K & R BUILDERS,…#3 SCR CONSTRUCTIO…#4 PBX Corporation
1202(A) 0183 UNCLASSIFIED EXCAVATION2,000CY $10.00 $9.87 $7.00 $15.00 $10.00
2202(D) 0184 UNCLASSIFIED BORROW1,000CY $12.00 $12.85 $13.50 $15.00 $15.00
3221(C) 2801 TEMPORARY SILT FENCE2,000LF $2.50 $1.88 $1.50 $1.80 $1.75
4232(A) 2813 SEEDING METHOD A1AC $1,000.00 $1,059.19 $1,250.00 $2,500.00 $2,500.00
5407(A) 4659 FOG SEAL33.76GAL $6.00 $10.03 $42.50 $15.00 $20.00
6407(B) 0250 TACK COAT126.68GAL $4.00 $8.77 $9.00 $8.00 $3.00
7408 5774 PRIME COAT197.58GAL $5.00 $12.53 $9.00 $7.00 $14.00
8411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)357.22TON $80.00 $145.46 $128.00 $250.00 $130.00
9412 5267 COLD MILLING PAVEMENT2,709.73SY $6.00 $8.89 $10.00 $8.00 $6.00
10509(D) 0325 CLASS C CONCRETE5.6CY $300.00 $243.98 $562.50 $1,500.00 $1,000.00
11619(B) 4780 REMOVAL OF GUARDRAIL1,480LF $2.50 $1.07 $2.50 $3.00 $2.00
12623 0100 (PL)GUARDRAIL CURBING4EA $500.00 $589.14 $550.00 $200.00 $500.00
13623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,562.5LF $15.00 $15.98 $17.50 $14.60 $15.00
14623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,632.31 $2,400.00 $1,942.00 $2,100.00
15623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,754.88 $1,500.00 $1,466.00 $1,300.00
16501(G) 6309 CLSM BACKFILL5CY $150.00 $244.43 $190.00 $300.00 $350.00
17502 6116 (PL)FALSEWORK JACKING1LSUM $20,000.00 $14,729.60 $10,000.00 $5,500.00 $5,000.00
18504(A) 1304 APPROACH SLAB182.2SY $150.00 $193.12 $215.00 $165.00 $225.00
19504(B) 1305 SAW-CUT GROOVING829SY $6.00 $4.51 $4.20 $8.00 $5.00
20504(C) 6250 SEALED EXPANSION JOINT82LF $250.00 $244.91 $270.00 $200.00 $300.00
21504(E) 6190 42" F-SHAPED PARAPET392LF $75.00 $88.29 $95.00 $96.00 $100.00
22504(G) 6390 RAPID CURE JOINT SEALANT82LF $25.00 $20.21 $38.00 $18.00 $20.00
23506(A) 1322 STRUCTURAL STEEL500LB $6.00 $9.40 $10.50 $8.00 $15.00
24509(A) 1326 CLASS AA CONCRETE193.2CY $550.00 $460.44 $747.50 $955.00 $850.00
25511(B) 6010 EPOXY COATED REINFORCING STEEL53,572LB $1.00 $0.8600 $1.04 $1.00 $1.50
26512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $6,400.00 $37,604.47 $12,500.00 $10,000.00 $40,000.00
27512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,825.00 $6,267.41 $2,500.00 $1,600.00 $750.00
28515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)311.7SY $4.50 $4.07 $4.00 $3.90 $4.00
29523(A) 6550 SEALER CRACK PREPARATION41LF $5.00 $6.27 $6.00 $5.10 $3.00
30523(B) 6560 SEALER RESIN0.4GAL $175.00 $626.74 $250.00 $200.00 $55.00
31540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)48EA $30.00 $2,519.50 $2,877.00 $4,200.00 $4,500.00
32540 4520 (PL)REPAIR BRIDGE ITEM (TYPE B)1LSUM $500.00 $14,146.80 $5,250.00 $9,000.00 $4,500.00
33619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $40,000.00 $18,802.23 $80,000.00 $46,000.00 $60,000.00
34619(B) 2510 REMOVAL OF BRIDGE ITEM (TYPE A)1LSUM $2,000.00 $1,880.22 $5,250.00 $4,500.00 $2,500.00
35501(G) 6309 CLSM BACKFILL5CY $150.00 $244.43 $190.00 $300.00 $350.00
36502 6116 (PL)FALSEWORK JACKING1LSUM $20,000.00 $14,728.67 $10,000.00 $5,500.00 $5,000.00
37504(A) 1304 APPROACH SLAB182.2SY $150.00 $193.21 $215.00 $165.00 $225.00
38504(B) 1305 SAW-CUT GROOVING829SY $6.00 $4.51 $4.20 $8.00 $5.00
39504(C) 6250 SEALED EXPANSION JOINT82LF $250.00 $236.17 $270.00 $200.00 $350.00
40504(E) 6190 42" F-SHAPED PARAPET392LF $75.00 $88.29 $95.00 $96.00 $100.00
41504(G) 6390 RAPID CURE JOINT SEALANT82LF $25.00 $20.21 $38.00 $18.00 $20.00
42506(A) 1322 STRUCTURAL STEEL500LB $6.00 $9.40 $10.50 $8.00 $15.00
43509(A) 1326 CLASS AA CONCRETE193.2CY $550.00 $460.44 $747.50 $955.00 $850.00
44511(B) 6010 EPOXY COATED REINFORCING STEEL53,572LB $1.00 $0.8600 $1.04 $1.00 $1.50
45512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $6,400.00 $37,604.47 $12,500.00 $10,000.00 $40,000.00
46512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,825.00 $6,267.41 $2,500.00 $1,600.00 $750.00
47515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)311.7SY $4.50 $4.07 $4.00 $3.90 $4.00
48523(A) 6550 SEALER CRACK PREPARATION41LF $5.00 $6.27 $6.00 $5.10 $3.00
49523(B) 6560 SEALER RESIN0.4GAL $175.00 $250.70 $250.00 $200.00 $55.00
50540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)48EA $30.00 $2,519.50 $2,877.00 $4,200.00 $4,500.00
51540 4520 (PL)REPAIR BRIDGE ITEM (TYPE B)1LSUM $500.00 $14,146.80 $5,250.00 $10,255.31 $4,500.00
52619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $40,000.00 $18,802.23 $80,000.00 $46,000.00 $60,000.00
53619(B) 2510 REMOVAL OF BRIDGE ITEM (TYPE A)1LSUM $2,000.00 $1,880.22 $5,250.00 $4,500.00 $2,500.00
54854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)1,797LF $1.50 $0.9200 $0.7000 $0.6000 $0.6000
55876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR150SD $15.00 $25.07 $9.00 $8.00 $8.00
56877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,170LF $25.00 $45.13 $23.00 $34.00 $25.00
57877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER3,510LF $5.00 $3.13 $1.00 $1.00 $2.00
58880(A) 8812 ARROW DISPLAY(TYPE C)150SD $5.00 $7.52 $12.50 $10.00 $10.00
59880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF750SD $1.00 $1.25 $0.5500 $0.5000 $0.5000
60880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,000SD $1.00 $1.25 $0.1000 $0.0500 $0.0500
61880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,350SD $1.00 $1.25 $2.00 $1.70 $1.70
62880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,400SD $0.2000 $0.0400 $0.1000 $0.0500 $0.0500
63880(E) 8860 WARNING LIGHTS(TYPE A)1,500SD $0.1000 $0.3100 $0.8500 $0.7000 $0.7000
64880(F) 8878 DRUMS6,000SD $0.2000 $0.1900 $0.1500 $0.1000 $0.1000
65642(A) 0095 CONSTRUCTION STAKING LEVEL I1LSUM $15,256.07 $9,401.12 $6,500.00 $6,000.00 $3,000.00
66641 1399 MOBILIZATION1LSUM $45,000.00 $50,139.29 $45,000.00 $90,000.00 $100,085.00