| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 74 | CY |
$20.00 |
$21.00 |
$20.00 |
$14.00 |
$100.00 |
$20.00 |
$29.00 |
$100.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$5,000.00 |
$3,000.00 |
$11,000.00 |
$20,000.00 |
$17,200.00 |
$25,000.00 |
| 3 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$350.00 |
$300.00 |
$200.00 |
$75.00 |
$200.00 |
$150.00 |
$300.00 |
$325.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 184 | LF |
$10.00 |
$5.00 |
$6.00 |
$3.00 |
$6.00 |
$7.00 |
$6.00 |
$6.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 4,489 | SY |
$3.50 |
$1.50 |
$2.00 |
$1.95 |
$2.00 |
$1.55 |
$1.55 |
$1.60 |
| 6 | 241 2832 |
MOWING | 2 | AC |
$100.00 |
$80.00 |
$75.00 |
$100.00 |
$100.00 |
$10.00 |
$80.00 |
$90.00 |
| 7 | 310(B) 0149 |
SUBGRADE, METHOD B | 101 | SY |
$6.00 |
$7.50 |
$5.00 |
$5.00 |
$5.50 |
$20.00 |
$30.00 |
$50.00 |
| 8 | 407(B) 0250 |
TACK COAT | 1,295 | GAL |
$6.00 |
$3.15 |
$3.00 |
$2.00 |
$3.00 |
$2.14 |
$5.00 |
$3.00 |
| 9 | 408 5774 |
PRIME COAT | 18 | GAL |
$10.00 |
$19.00 |
$3.00 |
$5.00 |
$20.00 |
$26.75 |
$30.00 |
$10.00 |
| 10 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 1,600 | TON |
$80.00 |
$70.00 |
$64.00 |
$73.00 |
$75.00 |
$66.34 |
$69.50 |
$74.00 |
| 11 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,912 | TON |
$85.00 |
$83.00 |
$74.00 |
$98.00 |
$85.00 |
$77.58 |
$78.50 |
$96.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 14,889 | SY |
$3.00 |
$1.80 |
$2.00 |
$2.10 |
$2.50 |
$1.18 |
$3.25 |
$2.00 |
| 13 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 174 | SY |
$50.00 |
$87.00 |
$35.00 |
$40.00 |
$20.00 |
$25.00 |
$85.00 |
$50.00 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 58 | CY |
$120.00 |
$140.00 |
$135.00 |
$165.00 |
$125.00 |
$110.00 |
$112.00 |
$200.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 2 | CY |
$350.00 |
$850.00 |
$450.00 |
$500.00 |
$400.00 |
$325.00 |
$655.00 |
$1,000.00 |
| 16 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 5,875 | LF |
$15.00 |
$8.00 |
$10.00 |
$6.00 |
$15.00 |
$15.00 |
$12.90 |
$18.00 |
| 17 | 609(B) 1501 |
1'-8" COMB. CURB & GUTTER (6" MNTBLE) | 2,250 | LF |
$15.00 |
$20.00 |
$20.00 |
$19.00 |
$18.00 |
$18.00 |
$27.40 |
$25.00 |
| 18 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 2,296 | LF |
$15.00 |
$20.00 |
$20.00 |
$19.00 |
$18.00 |
$18.00 |
$27.40 |
$25.00 |
| 19 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 295 | SY |
$40.00 |
$40.00 |
$50.00 |
$40.00 |
$50.00 |
$45.00 |
$85.00 |
$70.00 |
| 20 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,199 | LF |
$5.00 |
$4.75 |
$6.00 |
$5.00 |
$7.00 |
$6.00 |
$12.40 |
$15.00 |
| 21 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 49 | SY |
$15.00 |
$20.00 |
$6.00 |
$7.00 |
$15.00 |
$10.00 |
$30.00 |
$15.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 568 | SY |
$10.00 |
$2.85 |
$6.00 |
$7.00 |
$10.00 |
$10.00 |
$16.10 |
$10.00 |
| 23 | 619(B) 4791 |
REMOVAL OF CURB | 5,932 | LF |
$5.00 |
$5.75 |
$8.00 |
$3.00 |
$5.00 |
$6.00 |
$8.00 |
$10.00 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 4,116 | LF |
$4.00 |
$2.00 |
$3.00 |
$3.00 |
$5.00 |
$4.00 |
$3.45 |
$3.20 |
| 25 | 202(D) 0184 |
UNCLASSIFIED BORROW | 44 | CY |
$15.00 |
$21.00 |
$20.00 |
$14.00 |
$100.00 |
$20.00 |
$29.00 |
$50.00 |
| 26 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 1,568 | LF |
$15.00 |
$8.00 |
$10.00 |
$6.00 |
$15.00 |
$18.00 |
$12.90 |
$18.00 |
| 27 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 1,146 | SY |
$40.00 |
$31.00 |
$50.00 |
$40.00 |
$50.00 |
$45.00 |
$60.00 |
$70.00 |
| 28 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,146 | SY |
$5.00 |
$5.00 |
$6.00 |
$7.00 |
$5.00 |
$6.00 |
$5.00 |
$15.00 |
| 29 | 619(B) 4791 |
REMOVAL OF CURB | 1,568 | LF |
$5.00 |
$5.75 |
$8.00 |
$3.00 |
$5.00 |
$6.00 |
$12.80 |
$10.00 |
| 30 | 610(J) 4810 |
(PL) STAMPED CONCRETE FINISH | 1,146 | SY |
$35.00 |
$16.00 |
$20.00 |
$46.00 |
$17.00 |
$55.00 |
$28.25 |
$60.00 |
| 31 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 7,700 | LF |
$0.1200 |
$0.6300 |
$0.7000 |
$0.6600 |
$0.6000 |
$0.6400 |
$0.6500 |
$0.3000 |
| 32 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 3,500 | EA |
$0.6000 |
$0.4600 |
$0.5000 |
$0.4800 |
$0.4400 |
$0.4700 |
$0.5000 |
$1.00 |
| 33 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$43.00 |
$10.50 |
$11.00 |
$11.00 |
$10.00 |
$10.70 |
$11.00 |
$110.00 |
| 34 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 180 | SD |
$7.00 |
$2.10 |
$2.20 |
$2.20 |
$2.00 |
$2.14 |
$2.15 |
$5.50 |
| 35 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.3000 |
$0.4200 |
$0.4500 |
$0.4400 |
$0.4000 |
$0.4300 |
$0.4500 |
$1.10 |
| 36 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 660 | SD |
$0.5000 |
$0.5800 |
$0.6000 |
$0.6100 |
$0.5500 |
$0.5900 |
$0.6000 |
$1.10 |
| 37 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 780 | SD |
$2.00 |
$4.04 |
$4.25 |
$4.24 |
$3.85 |
$4.12 |
$4.10 |
$2.50 |
| 38 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.4000 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.5000 |
| 39 | 880(C) 8848 |
WING BARRICADES | 240 | SD |
$0.8500 |
$1.58 |
$1.65 |
$1.65 |
$1.50 |
$1.61 |
$1.60 |
$1.10 |
| 40 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,520 | SD |
$0.1000 |
$0.2100 |
$0.2200 |
$0.2200 |
$0.2000 |
$0.2100 |
$0.2500 |
$0.1500 |
| 41 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 1,500 | SD |
$0.0600 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1500 |
| 42 | 880(F) 8878 |
DRUMS | 1,500 | SD |
$0.2000 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1500 |
| 43 | 880(G) 8890 |
CHANNELIZER CONES | 6,000 | SD |
$0.2200 |
$0.4200 |
$0.4500 |
$0.4400 |
$0.4000 |
$0.4300 |
$0.4500 |
$0.5000 |
| 44 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 60 | SD |
$16.00 |
$15.75 |
$17.00 |
$16.50 |
$15.00 |
$16.05 |
$16.00 |
$25.00 |
| 45 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3.1 | CY |
$450.00 |
$515.00 |
$550.00 |
$590.00 |
$491.26 |
$525.65 |
$520.00 |
$550.00 |
| 46 | 804(B) 2916 |
REINFORCING STEEL | 477.1 | LB |
$1.35 |
$1.00 |
$1.50 |
$1.20 |
$1.00 |
$1.07 |
$1.10 |
$2.00 |
| 47 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$1,500.00 |
$1,570.00 |
$2,000.00 |
$1,794.00 |
$1,495.00 |
$1,599.65 |
$1,600.00 |
$1,750.00 |
| 48 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$100.00 |
$190.00 |
$200.00 |
$250.00 |
$180.00 |
$192.60 |
$800.00 |
$330.00 |
| 49 | 806(A) 8329 |
32'MH POLE 50'TS & 15'LMA(G.STL.) | 1 | EA |
$7,000.00 |
$9,300.00 |
$10,000.00 |
$10,650.00 |
$8,869.00 |
$9,489.83 |
$9,375.00 |
$9,800.00 |
| 50 | 809(A) 8090 |
ROADWAY LUMINAIRE | 1 | EA |
$525.00 |
$325.00 |
$400.00 |
$372.00 |
$310.00 |
$331.70 |
$330.00 |
$345.00 |
| 51 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 750 | LF |
$0.7500 |
$0.8000 |
$0.9000 |
$0.9000 |
$0.7500 |
$0.8000 |
$0.8000 |
$1.00 |
| 52 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$66,000.00 |
$47,500.00 |
$50,000.00 |
$54,312.00 |
$45,260.00 |
$48,428.20 |
$48,000.00 |
$50,000.00 |
| 53 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 3 | EA |
$565.00 |
$420.00 |
$450.00 |
$480.00 |
$400.00 |
$428.00 |
$425.00 |
$450.00 |
| 54 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 1 | EA |
$545.00 |
$410.00 |
$440.00 |
$468.00 |
$390.00 |
$417.30 |
$415.00 |
$440.00 |
| 55 | 833 3030 |
BACKPLATE | 4 | EA |
$80.00 |
$72.50 |
$80.00 |
$83.00 |
$69.00 |
$73.83 |
$73.00 |
$80.00 |
| 56 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 580 | LF |
$1.05 |
$1.00 |
$1.00 |
$1.20 |
$0.9500 |
$1.02 |
$1.00 |
$1.05 |
| 57 | 834(A) 8209 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 360 | LF |
$1.61 |
$1.50 |
$1.60 |
$1.80 |
$1.49 |
$1.59 |
$1.60 |
$1.65 |
| 58 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 5 | SF |
$19.00 |
$31.50 |
$35.00 |
$36.00 |
$30.00 |
$32.10 |
$32.00 |
$35.00 |
| 59 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,246 | LF |
$0.5000 |
$0.8000 |
$0.9000 |
$0.8500 |
$0.7700 |
$0.8200 |
$0.8500 |
$1.40 |
| 60 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 820 | LF |
$1.00 |
$0.8500 |
$1.00 |
$0.9000 |
$0.8000 |
$0.8600 |
$0.8500 |
$2.75 |
| 61 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 85 | LF |
$5.00 |
$7.60 |
$8.00 |
$8.00 |
$7.25 |
$7.76 |
$7.70 |
$8.25 |
| 62 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 3 | EA |
$75.00 |
$89.00 |
$100.00 |
$94.00 |
$85.00 |
$90.95 |
$90.00 |
$100.00 |
| 63 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$17,000.00 |
$10,000.00 |
$12,500.00 |
$25,500.00 |
$9,095.00 |
$10,000.00 |
$17,000.00 |
| 64 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$36,000.00 |
$60,000.00 |
$44,000.00 |
$40,000.00 |
$50,000.00 |
$68,000.00 |
$47,332.54 |
$80,000.00 |